Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,681Accepted-AOC | ₹84,681 | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical URANGATHIRI | AURANGABAD | BIHAR | 800036 | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SHARAFUDHEEN K.T L2 | MOHAMMED JASEEL CP L1 |
|---|---|---|---|---|---|
| 1.00Renovation work | |||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 16.5 | sqm | 35 ₹577.5 | 32.4 ₹534.6 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.45 | cum | 8,500 ₹3,825 | 8,481.71 ₹3,816.77 Lowest |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 490.24 | kg | 170 ₹83,340.12 | 163.86 ₹80,330.07 Lowest |
Tender Value
₹84,697
EMD Value
₹2,117
Closing Date
13 Jul 2026, 6:30 pmClosed
USMAN.PK
AE OFFICE MORAYUR GP 673642
Annual Plan-Morayur GP (Project No 94/27)- I M P R O V M E N T W O R K S T O THADAPPARAMB ANGANAWADI in ward 10
2026_LSGD_858930_5
02/2026-27AE/LIDEW/MYR/1 PHASE
Open Tender
Civil Works - Buildings
Item Rate
Morayur GP
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹2,117
Yes
10 Sept 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation work | |||||
| 1.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 1.002 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 0.4 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1452326.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.26 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.27 MB
Tendernotice_5.pdf
PDF • 0.26 MB
Tendernotice_6.pdf
PDF • 0.25 MB
BOQ_1452326.xls
BOQ • 0.30 MB
94NIT.pdf
Tender Documents • 0.02 MB
94SBD.pdf
Tender Documents • 1.69 MB
BID.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .