Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC WORK AWARDED | |
| 2 | L2₹3.1 L+₹700.58 (0.23%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹3.4 L+₹28,043.30 (9.11%)Rejected-AOC | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹3.4 L+₹28,331.14 (9.21%)Rejected-AOC | L4 | Rejected-AOC REJECTED | |
| 5 | L5₹3.5 L+₹38,031.13 (12.4%)Rejected-AOC AISWARAYA BHAVAN IRUMPANANGADU P O EZHUKONE KOLLAM | EZHUKONE | KOLLAM | KERALA | L5 | Rejected-AOC REJECTED |
Tender Value
₹3.7 L
EMD Value
₹9,213
Closing Date
25 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sreepriya C
Office of the Assistant Engineer, LID and EW Section, Marutharode Grama Panchayat
Kallamparambu road concreting and side wall construction
2024_LSGD_696527_9
ET1/AE/LSGD/MGP/2024-25
Open Tender
Civil Works - Roads
Item Rate
180 days
MARUTHARODE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹815
Yes
₹9,213
Yes
20 Dec 2024
15 Oct 2024
28 Oct 2024
15 Oct 2024
25 Oct 2024
15 Oct 2024
Amount
ROAD CONSTRUCTION
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
OD120271/2024-2025:carriage of departmental cut earth from one site to other site or tostacking yard by means of tipper of 5.50cum capacity including all costof labour, machineries, loading, unloading, and stacking/ spreadingcharges as per the direction of Engineer at site
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
SIDE WALL CONSTRUCTION
OD120353/2024-2025:od1269016/2021_2022 :DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc.complete as per direction of Departmental officers at site
OD120835/2024-2025:Supplying and providing readymade GI name board with all conveyance,labour and hire charges etc complete using GI hollow tube of size 80x40x1.4 mm post,40x20x1.4mm outer erame,0.6mm thick iron sheet of size 90x60cm with two coat of enamal painting over a coat of primer,lettering with suitable colour and size,fixing the post in ground with CC 1:2:4 etc complete.
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
SIDE WALL CONSTRUCTION
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
SANTHOSH S
K.PANKAJAKSHAN
REJITH.R
Prasad G
ABOOBACKER
Bidder Name
K.PANKAJAKSHAN
RATHIKRISHNAN,S
SANTHOSH S
ABOOBACKER
REJITH.R
Prasad G
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1086454.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .