| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | ₹19.7 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹22.1 L+₹2.5 L (12.5%)Rejected-Finance | ₹22.1 L+₹2.5 L (12.5%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Modern Industries L2 | RANJINI G L1 |
|---|---|---|---|---|---|
| 1.00Construction of Badminton Court at Kerala Books and Publications Society | |||||
| 1.01 | Taking out existing CC interlocking paver blocks including removal of rubbish or leveling sand or aggregates etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 144 | m2 | 33,840 ₹39,931.2 | 18,000 ₹21,240 Lowest |
| 1.02 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 150 | m2 | 28,500 ₹33,630 | 19,050 ₹22,479 Lowest |
| 1.03 | Providing and laying in position cement concrete of specified grade, properly mixed and consolidated with hand rammers, including cost and conveyance of all materials, labour, curing, lead, lift, etc., excluding the cost of centering and shuttering, as per specifications & directions of Engineer-in-charge - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 16 | m3 | 1,72,000 ₹2,02,960 | 1,19,296 ₹1,40,769.28 Lowest |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)including cost and conveyance of all materials, labour charges, lead,lift,scaffolding,sundries etc complete as directed by Engineer-in-Charge. Minimum cement content is 360 kg/cu.m. | 22 | m3 | 3,04,986 ₹3,59,883.48 | 2,16,700 ₹2,55,706 Lowest |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding with 16 gauge GI binding wire etc. complete including cost, conveyance, lead, lift of all materials for all types of RCC works as per drawing/specifications and as directed by the Engineer-in-charge, for all works up to highest plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,200 | Kg | 2,50,800 ₹2,95,944 | 2,25,500 ₹2,66,090 Lowest |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form, as per specifications and directions of the Engineer-in-charge, for Foundations, footings, bases of columns, etc. for mass concrete. | 17 | m2 | 12,189 ₹14,383.02 | 6,035 ₹7,121.3 Lowest |
| 1.07 | Finishing external walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm), including cost and conveyance of all materials, lead, lift, labour charges, scaffolding, cleaning the surface, sundries etc. complete as per specifications and as directed by the Engineer-in-charge. All works at all levels. | 60 | m2 | 17,580 ₹20,744.4 | 12,360 ₹14,584.8 Lowest |
| 1.08 | Painting of interior walls with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats, including cost and conveyance of all materials, lead, lift, labour charges, scaffolding, cleaning the surface, sundries etc. complete as per specifications and as directed by the Engineerin- charge. All works at all levels. | 60 | m2 | 15,480 ₹18,266.4 | 8,400 ₹9,912 Lowest |
| 1.09 | Supply and application of Moldosport's Proflex Elastic Poly Utherene, Rubber of 8mm(XPE) Sheets fixed with Hybrid Water BasePU Adhesive on smooth concrete surface for high cushion and intense shock absorbance followed by application of XPE Sheets and application of one Hybrid Filament Reinforcement Layer, 3 layers of colored water based Hybrid PU rubber cushion and 2layers of water based Hybrid PU colored topcoat giving a smooth feel to the finish surface(Top Coat thickness 2mm) Total thickness of10 mm and with 3 year warranty.Including top lines and all are in the standard specification,etc complete | 144 | m2 | 6,80,112 ₹8,02,532.16 Lowest | 7,34,400 ₹8,66,592 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
9 Feb 2026, 11:00 amClosed
Managing Director
Kerala Books and Publications Society Kakkanad P.O. Kochi - 682030
Construction of Badminton Court at Kerala Books and Publications Society
2026_KBPS_829839_1
P and A3/936/355 dated 17/01/2026
Open Tender
Civil Works - Others
Item Rate
Kerala Books and Publications Society, Kakkanad
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,540
Yes
₹50,000
Yes
28 Jul 2026
22 Jan 2026
10 Feb 2026
22 Jan 2026
9 Feb 2026
22 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Badminton Court at Kerala Books and Publications Society | |||||
| 1.01 | Taking out existing CC interlocking paver blocks including removal of rubbish or leveling sand or aggregates etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 144 | m2 | - | - |
| 1.02 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 150 | m2 | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade, properly mixed and consolidated with hand rammers, including cost and conveyance of all materials, labour, curing, lead, lift, etc., excluding the cost of centering and shuttering, as per specifications & directions of Engineer-in-charge - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 16 | m3 | - | - |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)including cost and conveyance of all materials, labour charges, lead,lift,scaffolding,sundries etc complete as directed by Engineer-in-Charge. Minimum cement content is 360 kg/cu.m. | 22 | m3 | - | - |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding with 16 gauge GI binding wire etc. complete including cost, conveyance, lead, lift of all materials for all types of RCC works as per drawing/specifications and as directed by the Engineer-in-charge, for all works up to highest plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,200 | Kg | - | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form, as per specifications and directions of the Engineer-in-charge, for Foundations, footings, bases of columns, etc. for mass concrete. | 17 | m2 | - | - |
| 1.07 | Finishing external walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm), including cost and conveyance of all materials, lead, lift, labour charges, scaffolding, cleaning the surface, sundries etc. complete as per specifications and as directed by the Engineer-in-charge. All works at all levels. | 60 | m2 | - | - |
| 1.08 | Painting of interior walls with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats, including cost and conveyance of all materials, lead, lift, labour charges, scaffolding, cleaning the surface, sundries etc. complete as per specifications and as directed by the Engineerin- charge. All works at all levels. | 60 | m2 | - | - |
| 1.09 | Supply and application of Moldosport's Proflex Elastic Poly Utherene, Rubber of 8mm(XPE) Sheets fixed with Hybrid Water BasePU Adhesive on smooth concrete surface for high cushion and intense shock absorbance followed by application of XPE Sheets and application of one Hybrid Filament Reinforcement Layer, 3 layers of colored water based Hybrid PU rubber cushion and 2layers of water based Hybrid PU colored topcoat giving a smooth feel to the finish surface(Top Coat thickness 2mm) Total thickness of10 mm and with 3 year warranty.Including top lines and all are in the standard specification,etc complete | 144 | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1393761.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.74 MB
BOQ_1393761.xls
BOQ • 0.27 MB
Tenderdocument.pdf
Tender Documents • 0.47 MB
Agreement.pdf
Other Document • 0.74 MB
Annexures.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .