| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.5 LAccepted-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | L1 | Accepted-AOC Award | |
| 2 | L2₹98.2 L+₹67,180.27 (0.69%)Rejected-AOC 60 19 CHANOT 125033 | CHANOT | HISAR | HARYANA | 125033 | L2 | Rejected-AOC Reject | |
| 3 | L3₹1.6 Cr+₹63.4 L (65.0%)Rejected-AOC | L3 | Rejected-AOC Reject |
Tender Value
₹90.7 L
EMD Value
₹1.8 L
Closing Date
31 Aug 2020, 2:00 pmClosed
Executive Engineer, PHED No. 1 Gohana
Executive Engineer, PHED No. 1 Gohana Near MC Park Jind Road Gohana
RINDHANA- AUGMENTATION OF WATER SUPPLY SCHEME RINDHANA GROUP OF 2 NO. VILLAGES BY RENOVATION OF EXISTING STRUCTURES OF WW, PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTIONS (FHTC) AND LAYING OF PIPE LINES IN VILLAGE RINDHANA AND DHANANA DISTT. SONIPAT
2020_HRY_140309_1
EIC Memo No. 70714-PHE/Mont dt. 17-08-2020
Open Tender
Civil Works
Works
365 days
Village Rindhana Dhanana
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Executive Engineer, PHED No. 1 Gohana
₹1.8 L
Yes
9 Sept 2020
20 Aug 2020
1 Sept 2020
20 Aug 2020
31 Aug 2020
20 Aug 2020
Amount
WATER TREATMENT PLANT (WTP) Design, construction, testing & commissioning of 1.00 MLD capacity Water treatment plant at Water Works Rindhana including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size DI pipe from S & S Tank to Pump chamber, raw water pump to inlet box of WTP, WTP to CWT & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVC/VAG) . DI pipe for the work will be supplied by the PHE Deptt. free of cost at Reserve stock Gohana.
Sluice Valves/ Specials For Rising Mains - Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 as per DNIT specification on the pumping machinery & head works including cost of jointing material (IVC / VAG make) 2.1.1 -100mm i/d
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 2.2.1- 100mm i/d
Providing & fixing of D.I. Kinetic Air Valve soft seated as confirming to I.S.I. complete in all respect.- 80mm
Supply erection testing and commissioning of exhaust fans each having a capacity of 45 cubic meters per minutes, complete in all respect.
Supply erection & testing of Ceiling fan of size 48" i/d (1200 mm) of reputed ISI make complete in all respect.
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects.
Design, Supply & Erection of copper wound outdoor type Transformers of required KVA as mentioned below on load tap changer or suitable capacity on higher side of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years.- AT W/W = 63 KVA
Design, Supply & Erection of 1 No. DG Sets of required KVA as mentioned below suitable capacity on higher side capacity with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel complete as per DNIT including operation & Maintenance of 5 Years.- AT W/W = 100 KVA
Operation and maintenance for the complete scope of work meintioned in the DNIT ( Disinfection material supplied by the PHED) as per schedule –IV for a period of 5 years after 12 month during defect liability period 3 months trial run ( will be changed to the A/mtc Estimate)-(i)-Opertation an Maintenance during Defect liability period (Operation Only)
(ii) Operation and maintencance during 1st year after defect liability period
(iii) Operation and maintenance during 2nd year
(iii) Operation and maintenance during 3rd year
(v) Operation and maintenance during 4th year
(v) Operation and maintenance during 5th year
Bidder Name
Amount
Jaiveer Singh Contractor
Ajay Yadav Contractor
Jaiveer Singh Contractor
Ajay Yadav Contractor
Ajay Yadav Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .