Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC 292 KUDITHERU CHINNANAGALUR PERIYANAGALUR POST ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | 608703 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹93,302.48+₹25,039.48 (36.7%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹94,248.96+₹25,985.96 (38.1%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | PALANIVEL K L2 | ARUNACHALAM M L3 | RR ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00Ariyalur Cement Works | ||||||
| 1.01 | Dismantling the hard scorching clinker coating in Kiln shell including the breaking boulders with feedable size and disposal of the same as instructed by TANCEM without damaging the nearby lining inside kiln shell | 1 | Meter | 3,100 ₹3,100 Lowest | 3,120 ₹3,120 | 3,850 ₹3,850 |
| 1.02 | Dismantling and breaking up the worn out refractory bricks including disposal of the same.
a) Initial 30 m length from the outlet of kiln | 1 | Meter | 12,000 ₹12,000 | 12,120 ₹12,120 | 7,200 ₹7,200 Lowest |
| 1.03 | b) Remaining 31 m length up to inlet of kiln | 1 | Meter | 15,000 ₹15,000 | 15,200 ₹15,200 | 9,200 ₹9,200 Lowest |
| 1.04 | Laying of refractory brick lining including conveying of required Nos. of bricks from stores, providing scaffolding, staging arrangements, erection of jacks dressing up and making suitability key bricks and cutting bricks including labourers, all required tools etc., required for proper completion of work.
a) Initial 30 m length from the outlet of kiln | 1 | Meter | 21,000 ₹21,000 | 21,175 ₹21,175 | 15,350 ₹15,350 Lowest |
| 1.05 | b) Remaining 31 m length up to inlet of kiln | 1 | Meter | 24,000 ₹24,000 | 24,275 ₹24,275 | 16,800 ₹16,800 Lowest |
| 1.06 | Supply of skilled Refractory Masons for attending lining work attending Preheater, Pre-calciner cooler, Teritary air duct, and connected area work and patch up work in the existing lining work.
(a) Skilled Mason (Dalmiapuram) | 1 | Man Day | 1,568 ₹1,568 Lowest | 1,570 ₹1,570 | 1,950 ₹1,950 |
| 1.07 | Supply of skilled carpenter for using scaffolding arrangement works inside the kiln, Preheater, Pre-calciner cooler, Teritary air duct, and connected area including all etc. complete work.
(a) Skilled Carpenter | 1 | Man Day | 1,250 ₹1,250 Lowest | 1,256 ₹1,256 | 1,950 ₹1,950 |
| 1.08 | Supply of skilled labourers for disposal of clinker coating from the Kiln inside and excess clinker in the cooler to kiln pier bottom area and also carrying out the work in Preheater, Pre-calciner cooler, Teritary air duct, and connected area work and patch up work in the existing lining work.
(a) Skilled labour | 1 | Man Day | 1,151.9 ₹1,151.9 Lowest | 1,156 ₹1,156 | 1,550 ₹1,550 |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
24 Nov 2025, 12:00 pmClosed
General Manager Marketing
5th Floor, Aavin Illam, 3A , Pasumpon Muthuramalingam Salai, Nandanam, Chennai - 35
Appointment of Contractor for Outsourcing the job of Refractory brick lining work in kiln at 1 MTPA Plant at Ariyalur Cement Works, Ariyalur District
2025_TNCEM_624631_1
LT.No.27/2025-26/ Brick Lining Work in kiln 1 MTPA/ACW
Open Tender
Miscellaneous Services
Supply
60 days
Ariyalur
As per tender Document
5 documents required · 5 mandatory
₹0
₹24,000
Chennai
2 Dec 2025
19 Nov 2025
24 Nov 2025
19 Nov 2025
24 Nov 2025
19 Nov 2025
21 Nov 2025
Amount
Ariyalur Cement Works
Dismantling the hard scorching clinker coating in Kiln shell including the breaking boulders with feedable size and disposal of the same as instructed by TANCEM without damaging the nearby lining inside kiln shell
Dismantling and breaking up the worn out refractory bricks including disposal of the same. a) Initial 30 m length from the outlet of kiln
b) Remaining 31 m length up to inlet of kiln
Laying of refractory brick lining including conveying of required Nos. of bricks from stores, providing scaffolding, staging arrangements, erection of jacks dressing up and making suitability key bricks and cutting bricks including labourers, all required tools etc., required for proper completion of work. a) Initial 30 m length from the outlet of kiln
b) Remaining 31 m length up to inlet of kiln
Supply of skilled Refractory Masons for attending lining work attending Preheater, Pre-calciner cooler, Teritary air duct, and connected area work and patch up work in the existing lining work. (a) Skilled Mason (Dalmiapuram)
Supply of skilled carpenter for using scaffolding arrangement works inside the kiln, Preheater, Pre-calciner cooler, Teritary air duct, and connected area including all etc. complete work. (a) Skilled Carpenter
Supply of skilled labourers for disposal of clinker coating from the Kiln inside and excess clinker in the cooler to kiln pier bottom area and also carrying out the work in Preheater, Pre-calciner cooler, Teritary air duct, and connected area work and patch up work in the existing lining work. (a) Skilled labour
PALANIVEL K (BID ID -1519179)
ARUNACHALAM M (BID ID -1519192)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_746964.xls
BOQ • 0.24 MB
LT_27.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .