Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
24 Oct 2026, 11:00 am6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Executive Engineer Salooni Division HPPWD Salooni
C/o Hume pipe culverts along with W/wall at RD 3/400, P/L MT and PCC R/walls, B/walls, parapets and PCC Drain at various RDs in KM 0/0 to 8/00
2026_PWD_145929_3
EE Salooni No. 6351-6400 Dated 09.10.2026
Open Tender
Civil Works
Percentage
90 days
Salooni
Please refer Tender documents.
16 documents required · 16 mandatory
₹5,000
₹2.5 L
16 Oct 2026
16 Oct 2026
24 Oct 2026
16 Oct 2026
24 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1The rate includes octroi,royality,Malkana,Toll tax, GST or any other taxes imposed by the Government. | 60.75 | Per Cubic Metre | 164.9 | ₹10,017.68 |
| 2.01 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate includes octroi,royality,Malkana,Toll tax, GST or any other taxes imposed by the Government. | 882.35 | Per Cubic Metre | 597.8 | ₹5,27,468.83 |
| 3.01 | Providingand laying Mechanically mixed and vibrated concrete for plain/reinforced concrete nominal mix 1:4:8 ( one cement is to four sand is to eight graded crushed stone aggregate 40 millimeter (forty millimeter) nominal size in or under water and curing complete for 14 (fourteen) days, in open foundations for all type of structures and the like drain etcetera including pumping or bailing out water (surface and sub soil water) dewatering for alldepths and any quantum of water including removal of slush which may arise at the time of laying under water complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 or as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate includes octroi,royality,Malkana,Toll tax, GST or any other taxes imposed by the Government. | 2.26 | Per Cubic Metre | 5,735.4 | ₹12,962 |
| 4.01 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundations for all types of structure complete of plain cement concrete grade M-10 (M Ten) nominal mix 1:3:6 (one cement :Three sand :Six graded crushed /broken stone aggregate 40 mm (Forty Milimeters) nominal and below size in or under water including curing complete, pumping or bailing out water ,dewatering removal of slush as required at site which may arrisen at the time of laying under water complete for all heights/depths including the cost of form work, as per drawings and technical specifications Clause 802, 803, 1202 & 1203 and as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals .The rate including of octroi, royality, Malkana, tolltax, or other taxes imposed by the government. | 51.79 | Per Cubic Metre | 7,023.2 | ₹3,63,731.53 |
| 5.01 | Providing and laying mechanically mixed and vibrated concrete for plain/ cement concrete in Sub Structure for all type of structure complete using plain cement concrete grade M-15 ( M fifteen) design mix with cement contents not less than 275 kg (two hundred seventy five kilograme) per cubic metre in or under water including curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying under water complete for all heights/ depths including the cost of form work in abutments as per drawings and M.O.R.D. technical specification section 800, 900 and 1200, and as per the direction of Engineer-in-Charge including carriage of material within all leads , lifts and other incidentals .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 84.97 | Per Cubic Metre | 7,486.4 | ₹6,36,119.41 |
| 6.01 | Providing and laying concrete for plain/ reinforced Cement concrete 1:2:4 (One Cement : Two Sand : four crushed stone aggregate) 20mm Nominal Mix, P.C.C. grade M-20 (M-Twenty) in open foundations complete as per drawing and technical specifications clause 802, 803,1202 & 1203 including carriage of materials with in all leads, lifts and other incidental .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 0.25 | Per Cubic Metre | 8,259.4 | ₹2,064.85 |
| 7.01 | Providing and laying mechanically mixed and vibrated concrete for plain/ cement concrete in Type A (concrete Cradlie ) Bedding laying concrete cradle bedding with plain cement concrete grade M-15 ( M fifteen) with cement contents not less than 250 kg (two hundred Fifty kilograme) per cubic metre in or under water including curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying under water complete for all heights/ depths including the cost of form work in abutments as per drawings and M.O.R.D. technical specification section 800, 900 and 1200, and as per the direction of Engineer-in-Charge including carriage of material within all leads , lifts and other incidentals .The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 1.36 | Per Cubic Metre | 7,078 | ₹9,626.08 |
| 8.01 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row 900mm.Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 7.5 | Per Running Metre | 9,125.7 | ₹68,442.75 |
| 9.01 | Providing and laying Mechanically mixed and vibrated concrete for plain / reinforced concrete nominal mix 1:5:10 ( one cement is to five sand is to ten graded crushed stone aggregate 40 millimeter (forty millimeter) nominal size in or under water and curing complete for 14 (fourteen) days, in open foundations for all type of structures and the like drain etcetera including pumping or bailing out water (surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying under water complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification Clauses 802,803,1202 and 1203 or as directed by the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate includes octroi,royality,Malkana,Toll tax, GST or any other taxes imposed by the Government. | 1,731.35 | Per Cubic Metre | 5,472.2 | ₹94,74,293.47 |
| 10.01 | Backfilling behind retaining wall/breast wall complete as per drawing and technical specification clause 1204.3.8 in granular material within all leads and lift of material as per direction of Engineer-in-Charge and other incidentals. The rate is including royality, Malkana,Toll tax, GST or other taxes imposed by the Government. | 265.75 | Per Cubic Metre | 1,417.3 | ₹3,76,647.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.58 MB
Tendernotice_2.pdf
PDF • 0.44 MB
Biddocument.pdf
Tender Documents • 4.98 MB
BOQ_217434.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .