| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L | L1 | Accepted-AOC Responsive in Financial bid |
| 2 | L2₹27.9 L+₹21,824.01 (0.79%)Rejected-Finance | ₹27.9 L+₹21,824.01 (0.79%) | L2 | Rejected-Finance Non-Responsive |
| 3 | L3₹28.0 L+₹28,825.21 (1.04%)Rejected-Finance | ₹28.0 L+₹28,825.21 (1.04%) | L3 | Rejected-Finance Non-Responsive |
| 4 | L4₹29.4 L+₹1.7 L (6.09%)Rejected-Finance | ₹29.4 L+₹1.7 L (6.09%) | L4 | Rejected-Finance Non-Responsive |
| Sl No | Description | Qty | Unit | Rakesh Chandra Bhardwaj L2 | Anubir Singh L4 | DINESH SINGH PANWAR L3 | R AND C CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for Structures :Excavation in foundation for cross drainage structures, Retaining walls, brest walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer-in-charge aslo including supply of all materials, labour, T&P etc. required for proper completion of work. | 109.35 | Cum. | 471.42 ₹9,278.94 | 496.23 ₹9,767.27 | 472.6 ₹9,302.16 | 400 ₹7,873.18 Lowest |
| 2.00 | Random Rubble Masonry 1:6 in cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 228.31 | Nos | 4,436.38 ₹1,82,316.35 Lowest | 4,669.88 ₹1,91,912.2 | 4,447.5 ₹1,82,773.33 | 4,447.5 ₹1,82,773.33 |
| 3.00 | Random Rubble Stone Masonry laid in Dry cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 174.85 | Cum. | 2,481.58 ₹78,103.16 Lowest | 2,612.19 ₹82,213.87 | 2,487.8 ₹78,298.92 | 2,487.8 ₹78,298.92 |
| 4.00 | HP stone filling in back of walls includings supply of all material, labour, T&P etc. required for proper completion of the work for R/W and B/W | 81.4 | Cum. | 1,128.37 ₹16,532.88 | 1,187.76 ₹17,403.06 | 1,131.2 ₹16,574.34 | 1,075 ₹15,750.9 Lowest |
| 5.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including suplu of all material,labour, T&P etc. required for proper completion of the work.as per drawings and technical specifications | 153.34 | Cum. | 5,065 ₹1,39,801.9 | 5,331.59 ₹1,47,160.2 | 5,077.7 ₹1,40,152.44 | 5,000 ₹1,38,007.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
18 May 2026, 3:00 pmClosed
Zonal Manager
C-11, Turner Road, Clement Town, Dehradun U.K-248002
Restoration work at Bunga to Kolpuri MR
2026_CCUK_147514_1
UT-03-04 Aapda
National Competitive Bid
Civil Works - Roads
Item Rate
90 days
Tharali
As per technical bid
3 documents required · 3 mandatory
₹3,540
ZONAL MANAGER ,NPCC Ltd
₹56,000
Yes
1 Jun 2026
8 May 2026
18 May 2026
8 May 2026
18 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures :Excavation in foundation for cross drainage structures, Retaining walls, brest walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer-in-charge aslo including supply of all materials, labour, T&P etc. required for proper completion of work. | 1 | Cum. | 472.6 | ₹472.13 |
| 2 | Random Rubble Masonry 1:6 in cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 0.08 | Nos | 4,447.5 | ₹355.8 |
| 3 | Random Rubble Stone Masonry laid in Dry cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 0.6 | Cum. | 2,487.8 | ₹1,492.68 |
| 4 | HP stone filling in back of walls includings supply of all material, labour, T&P etc. required for proper completion of the work for R/W and B/W | - | Cum. | 1,131.2 | - |
| 5 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including suplu of all material,labour, T&P etc. required for proper completion of the work.as per drawings and technical specifications | 0.8 | Cum. | 5,077.7 | ₹4,057.08 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD.pdf
Tender Documents • 1.57 MB
BOQ_230195.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .