Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
7 Jan 2021, 3:00 pmClosed
SE,EDC,Rudrapur
Superintending Engineer,EDC,Rudrapur
Replacement of Bare conductor by AB Cable in Pantnagar Area under EDD,Rudrapur
2020_UPCL3_28236_1
EDC(USN)37/2020-21
Open Tender
Electrical Works
Item Rate
180 days
Pantnagar
Pl. refer tender documents.
3 documents required · 3 mandatory
₹1,180
SE,EDC,Rudrapur
₹75,000
23 Feb 2021
17 Dec 2020
8 Jan 2021
17 Dec 2020
7 Jan 2021
17 Dec 2020
Amount
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size to95sq.mm-70sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 95sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex make or other ISI mark reputed company ) with Panel Lock with key) ( As per drawing attached )
Supply of Dead End Clamps with I Hook. As per drawing and UPCL Specification.
Supply of Suspension Clamps with I Hook. As per drawing and UPCL Specification.
Supply of L.T. Bare Neutral connectors P.G. clamp, made of Aluminium 95sq.mm. to 95 sq.mm double bolt( For line to line) ( As per drawing attached )& as per UPCL specification.
Supply of Aluminium Lugs ‘O’ type size 25mm.( For connecting Cable PVC 4x25 & 4x16mm.
Supply of Half Clamp made of M.S. flate for PCC Pole 8.5 Mtr. long size 35x5sq.mm duly red oxide painted with suitable size with fitted nuts & bolts and washer . for Fixing of L.T. Distribution Board without cracks & burrs, painted by primers.
Supply of M.S. Clamp made of M.S. flate for PCC Pole 8.5 Mtr. long, size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead & Clamps assemble.painted by primers.
Supply of M.s. Clamps for PCC Pole 8.5 Mtr. long, made of M.S. flate size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm) for Suspension Clamps assemble without cracks & burrs. Painted by primers.
Supply of M.s. Clamps for SP -55 Mtr. long, made of M.S. flate size 50x6mm. with 3 Nos. Nut & Bolts ( size 65x16mm) for Dead end Clamps assembly without cracks & burrs. Painted by primers.
Supply of Stay Clamps made of M.S. flate for PCC Pole 8.5 Mtr. long, size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm) for Suspension Clamps assemble without cracks & burrs. Painted by primers.
Supply of Aluminium ug size 120mm.
Supply of L.T. Bare Neutral connectors P.G. clamp, made of Aluminium 95sq.mm. to 95 sq.mm double bolt( For line to D.Box. ) ( As per drawing attached )& as per UPCL specification.
Cartage of Small material including ABC Cable including Loading / Unloading of Small material from store centre at Haldwani approximate distance 21-50KM.
Cartage of PCC Pole 8.5 Mtr Long. Long. including Loading / Unloading from store centre at Haldwani approximate distance 21-50KM.
Cartage of STP Pole, SP -55 Long. . including Loading / Unloading from store centre at Haldwani approximate distance 21-50KM.
Cartage of Small material including ABC Cable including Loading / Unloading of Small material from Store to work site. Upto 0-1KM.
Cartage of PCC Pole 8.5 Mtr Long. Long. including Loading / Unloading from Store to work site. Upto 0-1KM.
Cartage of STP Pole, SP -55 Long. . including Loading / Unloading Store to work site. Upto 0-1KM.
Erection & grouting of STP, SP -55 for reducing span of LT, ABC line including digging of pits 900x75x650mm. Mtr.grouting stone pad and making kiciking block in E&B And with fitting of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge
Erection & grouting of P.C.C. Pole8.5 Mtr. Long ( 180 kg. W/L )for reducing span of LT, ABC line including digging of pits 0.6x0.9x2.15 Mtr.grouting stone pad and making kiciking block in E&B And with fitting of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge
Erection of stay set 16x1800mm. pit size 0.6x1.6x1.5 Mtr. as per specifications including 7/16SWG stay wire, binding, nozzling of stay with bcking filling of pit with CC 1:4:8 in bottom to pitcomplete work stay set will be provided by UPCL.as per RESPO specification & as per direction of Engineer in charge :
Erection of M.S. Earthing rod 20x2500mm.connecting support with G.I. Wire No. 6 SWG with nut and bolts.
Laying & Fixing Insulated Cable 4x16 sq.mm. as per direction of Engineer-In-Charge.
Dismentaling of Old ACAR Conductor L.T. Line including including re-rolling cartage ferom site works to JE store & upto JE store centre Haldwani ( L.T. Line ) 3 Phae 4 wire.
Dismentaling of Old ACAR Conductor L.T. Line including including re-rolling cartage ferom site works to JE store & upto JE store centre Haldwani ( L.T. Line ) 2 Phae 3 wire
Dismentaling of Old ACAR Conductor L.T. Line including including re-rolling cartage ferom site works to JE store & upto JE store centre Haldwani ( L.T. Line ) 1 Phae 2 wire
Laying, Stringing, sagging of ABC Cable3x95+1x70mm2 including fixing of Insulated,Piering Connector, Dead end clamp with I Hook, Suspension Clamp with I Hook in all complete work.
Installation and fixing of Alluminium Lug for ABC Cable at existing transformer as per direction of Engineer-In-Charge.
Removal & Re connection of exising cable of single phase service connection same.
Removal & Re connection of exising cable of LT Three phase service connection same.
Installation & Fixing of L.T.Distribution Box & Connection of L.T. consumer including all complete work.
Straighting of existing tilled PCC/rail Pole/S.T. Pole by digging earth. As per direction of Engineer-In-Charge.
Lopping & hopping of tree of branches in Line.
M/s JAY ELECTRICALS
TNK Electricals
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .