Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹10,279
Closing Date
25 Jul 2026, 10:00 am
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day to day operation and maintenance of pump motor set along with electrical maintenance of different residential and non residential buildings at Belghoria PS and Housing, Khordaha PS etc under Barrackpore PC for the FY 2026-2027. (1st Call)
2026_WBPHI_5016763_1
WBPHIDCL/EE-(HQ-I)/NIT- 2(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,279
Yes
14 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
25 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pump Motor & Electrical Maintenance Work Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess) ( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge . The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works. | - | LOT | 2,00,000 | - |
| 2 | Day to day Operation of pump- motor sets and Emergent EI Maintenance works Supply of manpower for operation of pump-motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor maintenance and Supply of Manpower for Repair and Maintenance of all electrical fittings and accessories as and when required in for 1 (one) Shift per day as per direction of EIC. Belghoria PS & Housing Khordaha PS & Housing Kutighat Housing Barrackpore Police Line.
Shift Duration:- I) 10:00A.M to 6:00 P.M ( Two Number of Semi Skilled Electrician Cum Pump Operators per shift ) is to be provided by the agency (tools and tackles should be provided by the agency) Electrician Cum Pump Operators (Semi Skilled) =(1x274x2)** { Shift x Days x Man Power} ( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS )
N.B.:- Submission of " License to Electrical Contractors" By the Bidder in Mandatory.
***Electrician Cum Pump Operators may be engaged as required in the differant govt building Under Barrackpore CP. as and when asked for.*** | - | PershiftperElectrician | 572.9 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.92 MB
BOQ_5086482.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid