| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC QTR NO 03 WARD NO 06 MAIN ROAD BAZARPERA WEST CHIRIMIRI PONDI DISTT MCB C G 497773 | WEST CHIRIMIRI | MCB | CHHATTISGARH | 497773 | L1 | Accepted-AOC As being L1 and qualifies eligibility criteria | |
| 2 | Rejected-Technical | - | Rejected-Technical Not taken for technical evaluation as not being L1 | |
| 3 | Rejected-Technical WARD NO 03 NEAR RAILWAY CENTRAL SCHOOL MANENDRAGARH 497442 | MANENDRAGARH | KOREA | CHHATTISGARH | 497442 | - | Rejected-Technical Not taken for technical evaluation as not being L1 |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
18 Jul 2024, 5:00 pmClosed
Staff Officer (EnM), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. West Chirimiri Distt. MCB (C.G.) 497773
A) Repairing of 04 nos. induction motors and 01 no. welding machine for Kurasia Colliery. B) Repairing of 07 nos. induction motors and 01 no. welding machine for Dumanhill CHP/Siding of Kurasia Sub Area.
2024_SECL_312109_1
SECL/GM/CHRM/EM/e-Tender/ 24-25/17 dtd. 07.07.2024
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Kurasia Sub Area, Chirimiri Area
As per NIT
4 documents required · 4 mandatory
₹3,200
5 Nov 2024
8 Jul 2024
19 Jul 2024
8 Jul 2024
18 Jul 2024
8 Jul 2024
8 Jul 2024 - 15 Jul 2024
Amount
Repairing/rewinding of induction motor of belt conveyor 90kW , 550V, 1480 rpm , Sl. No. KC/UG/04
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (1.1)
Labour Charges @10% of (1.1 + 1.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (1.1 + 1.2 + 1.3 + 1.4)
Painting Charges
Replacement of old damaged bearing N318
Replacement of old damaged bearing 6318
Repairing/rewinding of induction motor of belt conveyor 90kW , 550V, 1440 rpm , Make- CG, Sl. No. KC/UG/05
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (2.1)
Labour Charges @10% of (2.1 + 2.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (2.1 + 2.2 + 2.3 + 2.4)
Painting Charges
Replacement of old damaged bearing N318
Replacement of old damaged bearing 6318
Repairing/rewinding of 3 phase induction motor of LHD Machine 37kW/50HP , 550V, 1440 rpm , Make- CG, Sl. No. KC/UG/02
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (3.1)
Labour Charges @10% of (3.1 + 3.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (3.1 + 3.2 + 3.3 + 3.4)
Painting Charges
Replacement of old damaged bearing 6312
Repairing/rewinding of 3 phase induction motor of LHD Machine 37kW/50HP , 550V, 1440 rpm , Make- CG, Sl. No. KC/UG/03
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (4.1)
Labour Charges @10% of (4.1 + 4.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (4.1 + 4.2 + 4.3 + 4.4)
Painting Charges
Replacement of old damaged bearing 6312
Repairing/rewinding of Welding Machine Oil Cooled , Primary & secondary Coil 550V, 25 KVA, 600Amps , Sl. No. KC/UG/02
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (5.1)
Labour Charges @10% of (5.1 + 5.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (5.1 + 5.2 + 5.3 + 5.4)
Repairing/rewinding of 04 Nos. 15HP / 440Volts, 1440/1460/1480/1485 rpm Electrical motor
Cost of New Class B ISI Marked SE Copper Wire (11 Kg x 4 = 44kg for 04 motors)
Insulation Material Cost @15% of (6.1)
Labour Charges @10% of (6.1 + 6.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (6.1 + 6.2 + 6.3 + 6.4)
Ball bearing 6309 (1 x 4 = 04 Nos. for 04 Motors)
Repairing/rewinding of 01 No. 15HP / 440Volts, 960 rpm Electrical motor
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (7.1)
Labour Charges @10% of (7.1 + 7.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (7.1 + 7.2 + 7.3 + 7.4)
Repairing/rewinding of 01 No. 550 / 440Volts, 600 Amps Welding Machine
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (8.1)
Labour Charges @10% of (8.1 + 8.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (8.1 + 8.2 + 8.3 + 8.4)
Repairing/rewinding of 01 No. 10HP / 440Volts, 960 rpm Electrical motor
Cost of New Class B ISI Marked SE Copper Wire
Insulation Material Cost @15% of (9.1)
Labour Charges @10% of (9.1 + 9.2)
Less Scrap (-)
Testing and Supervison Charges @10% of (9.1 + 9.2 + 9.3 + 9.4)
Ball bearing 6306
Repairing/rewinding of 01 No. 15kW / 20HP, 550Volts, 2900 rpm Electrical motor
Cost of New Class B ISI Marked SE Copper Wire
Less Scrap (-)
Insulation Material Cost
Labour Charges
Repairing of Fan by CI rod
Testing and Supervison Charges @10% of (10.1 + 10.2 + 10.3 + 10.4 + 10.5)
Ball bearing 6310
Total impact of GST for the purpose of CTC
M/S SHRI SHRI THAKURJI ENTERPRISES
MODERN ELECTRICAL WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_323445.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .