Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.4 LAccepted-AOC | ₹94.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹95.1 LRejected-Finance | ₹95.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹96.6 LRejected-Finance GRAM MANELA PO GHAGHAS DWARAHAT | ALMORA | UTTARAKHAND | 263601 | ₹96.6 L | L3 | Rejected-Finance L3 |
| 4 | L3₹96.6 LRejected-Finance | ₹96.6 L | L3 | Rejected-Finance L3 |
| 5 | L4₹97.1 LRejected-Finance | ₹97.1 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | TANUJA TRADERS L1 | Hitesh Bhatt L2 | Surendra Singh Mehta L9 | Mahesh Chandra Sanwal L10 | Bharat Singh Adhikari L5 | Ganesh Mehta L4 | Gopal Singh Bagadwal L6 | kamal verma L3 | Dalip Singh L8 | Jeevan Singh Mehra L3 | GOLJU CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 291.17 | cum | 188.6 ₹54,914.66 | 175.5 ₹51,100.34 | 176.47 ₹51,382.77 | 214.94 ₹62,584.08 | 193 ₹56,195.81 | 180 ₹52,410.60 | 192.8 ₹56,137.58 | 187.52 ₹54,600.20 | 195.99 ₹57,066.41 | 187.52 ₹54,600.20 | 190 ₹55,322.30 |
| 2.00 | Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 110.53 | cum | 142.02 ₹15,697.47 | 130.4 ₹14,413.11 | 141.19 ₹15,605.73 | 161.85 ₹17,889.28 | 145 ₹16,026.85 | 160 ₹17,684.80 | 145.17 ₹16,045.64 | 141.2 ₹15,606.84 | 147.58 ₹16,312.02 | 141.2 ₹15,606.84 | 145 ₹16,026.85 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 36.92 | cum | 4,935.81 ₹1.8 L | 4,820.6 ₹1.8 L | 5,311.05 ₹2.0 L | 5,625.09 ₹2.1 L | 5,058 ₹1.9 L | 5,400 ₹2.0 L | 5,045.5 ₹1.9 L | 4,907.53 ₹1.8 L | 5,129.2 ₹1.9 L | 4,907.53 ₹1.8 L | 5,300 ₹2.0 L |
| 4.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) | 41.05 | cum | 5,297.55 ₹2.2 L | 5,550 ₹2.3 L | 5,576.37 ₹2.3 L | 6,037.35 ₹2.5 L | 5,428 ₹2.2 L | 4,800 ₹2.0 L | 5,415.28 ₹2.2 L | 5,267.19 ₹2.2 L | 5,505.12 ₹2.3 L | 5,267.19 ₹2.2 L | 5,500 ₹2.3 L |
| 5.00 | P/L in position RCC 1:1.5:3 excluding the cost of c/shuttering finishing and reinf All work upto plinth level(in foundation) | 75.07 | cum | 6,554.34 ₹4.9 L | 6,550 ₹4.9 L | 7,052.62 ₹5.3 L | 7,469.64 ₹5.6 L | 6,716 ₹5.0 L | 7,200 ₹5.4 L | 6,699.99 ₹5.0 L | 6,516.77 ₹4.9 L | 6,811.14 ₹5.1 L | 6,516.77 ₹4.9 L | 7,100 ₹5.3 L |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:6 (1 cement : 6 c/sand). | 42.71 | cum | 5,167.86 ₹2.2 L | 5,450 ₹2.3 L | 5,681.62 ₹2.4 L | 5,889.55 ₹2.5 L | 5,295 ₹2.3 L | 5,500 ₹2.3 L | 5,282.7 ₹2.3 L | 5,138.24 ₹2.2 L | 5,370.34 ₹2.3 L | 5,138.24 ₹2.2 L | 5,200 ₹2.2 L |
| 7.00 | R.C.C work 1:1.5:3 in wall plinth and string courses column pillars piers abutments posts & struts etc upto floor five levelex. Cost of c/shuttreing, finishing and reinf. | 24.09 | cum | 7,863.79 ₹1.9 L | 7,800 ₹1.9 L | 8,645.57 ₹2.1 L | 8,961.97 ₹2.2 L | 8,058 ₹1.9 L | 8,500 ₹2.0 L | 8,038.55 ₹1.9 L | 7,818.73 ₹1.9 L | 8,171.91 ₹2.0 L | 7,818.73 ₹1.9 L | 8,000 ₹1.9 L |
| 8.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) beams,s/shades, shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | 105.8 | cum | 8,336.61 ₹8.8 L | 8,350 ₹8.8 L | 9,067.89 ₹9.6 L | 9,500.81 ₹10.1 L | 8,540 ₹9.0 L | 8,800 ₹9.3 L | 8,521.87 ₹9.0 L | 8,288.83 ₹8.8 L | 8,663.25 ₹9.2 L | 8,288.83 ₹8.8 L | 8,500 ₹9.0 L |
| 9.00 | Centering and shuttering i/c strutting propping etc and removel of form for foundations footings bases of columns etc for mass concrete. | 197.36 | sqm | 284.14 ₹56,077.87 | 300 ₹59,208 | 282.48 ₹55,750.25 | 323.82 ₹63,909.12 | 291 ₹57,431.76 | 140 ₹27,630.40 | 290.46 ₹57,325.19 | 282.51 ₹55,756.17 | 295.28 ₹58,276.46 | 282.51 ₹55,756.17 | 300 ₹59,208 |
| 10.00 | Centering and shuttering i/c strutting propping etc and removel of form for Suspended floors roofs landings balconies and access platform. | 411.33 | sqm | 500 ₹2.1 L | 625 ₹2.6 L | 667.94 ₹2.7 L | 765.69 ₹3.1 L | 688 ₹2.8 L | 340 ₹1.4 L | 686.8 ₹2.8 L | 668.02 ₹2.7 L | 698.19 ₹2.9 L | 668.02 ₹2.7 L | 680 ₹2.8 L |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
26 Jun 2024, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
The work of developing the required basic facilities at GIC rangel, selected as a cluster school
2024_RES_72473_1
313 Dated 11-06-2024
Open Tender
Civil Works - Buildings
360 days
Raingal
The work of developing the required basic facilities at GIC rangel, selected as a cluster school
2 documents required · 2 mandatory
₹4,720
4000 D.H. and 720 GST No.
₹2.3 L
4 Feb 2026
19 Jun 2024
27 Jun 2024
19 Jun 2024
26 Jun 2024
19 Jun 2024
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid