Tender Value
₹42.0 L
EMD Value
₹42,000
Closing Date
8 Jun 2026, 6:00 pm3d left
Chief Executive Authority, Surat Urban Development Authority, Surat.
CR to various Roads of T.P & D.P Schemes in kamrej taluka under surat urban devlopment area. (2nd attempt)
310327
SUDA /CB/04/2025-26
Open
Civil - All
Surat
3 documents required · 3 mandatory
₹1,770
Chief Executive Authority, Surat Urban Development Authority, Surat.
₹42,000
1 Jun 2026
1 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
Name of Work:- CR to various Roads of T.P & D.P Schemes in kamrej taluka under surat urban
devlopment area. (2nd attempt)
Memorandum showing items of work to be carried out
1) The Schedule B shall be read in conjunction with the Instruction to Bidders, General and Special Conditions of Contract, Scope
of Services and Specifications.
2) The quantities given in the Schedule B are estimated and provisional and are given to provide a common basis for bidding. The
basis of payment will be actual quantities of work ordered and carried out and valued at the rates and prices tendered in the
Schedule B, where applicable and otherwise at such rates and prices as the Engineer may fix within the terms of Contract.
3) The rates and prices tendered in the Schedule B shall, except in so far as it is otherwise provided under the contract, include all
equipment, construction plant, labour, supervision, materials, erection, maintenance, testing of input material delivered, profit,
taxes and duties together with all general risks, liabilities and obligations set out and implied in the Contract. The Contractor shall
provide all the equipment related to the project.
4) The percentage in schedule ‘B’ must be given in words and figures.
Item Quantities Item of work Estimate Rates Unit Total Amount
Item Quantities Item of work Estimate Rates Unit Total Amount
No. estimated but In figure In words according to
may be more Rs. Ps. estimated
1 or 2less 3 4 5 6 quantities
1 712.91 Box cutting the road surface to proper slope and 109.41 Rupees One cum
camber for making a base for road work Hundred Nine
including removing the excavated stuff and And Paise Forty
depositing on the road side slope as directed One Only
upto 50Mt.lead.
2 475.28 Construction of compacted layer of required 778.71 Rupees Seven cum
thickness with granular sub base of river bed Hundred Seventy
material (Grade-III) by providing close graded Eight And Paise
material as per gradation of MOST from Seventy One Only
available and approved source and location of
river bed collecting at stack yard for screening
and maintaining gradation by mixing required
size if required carriage of a mix material to
work site spreading uniform layers.
3 475.28 Providing, laying, spreading and compacting 1302.90 Rupees One cum
graded stone aggregate to wet mix macadam Thousand Three
(WMM) in two layer as per specification and Hundred Two And
drawing including premixing the Material with Paise Ninety Only
water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in
uniform layers with paver in sub- base / base
course on well prepared surface and compacting
with vibratory roller to achieve the desired
density as per MORT&H fifth revision clause-
4 2327.95 Providing and applying Bituminous Prime coat 124.23 Rupees One SQ M
on wet mix macadam surface with mechanical Hundred Twenty
sprayer using Bitumen emulsion SS1 Grade @ Four And Paise
7.5 kg/10 per sqm Including preparing surfaces Twenty Three
by brushing with wire brushes for removing Only
caked mud, all loose dirts, heating the bitumen
etc complete as per specification clause 502 of
MoRT & H fifth Revision.
5 274.00 Providing and laying compacted 50 mm thick 4978.29 Rupees Four MT
dense graded bituminous macadam in One layer Thousand Nine
with batch mix plant producing an average Hundred Seventy
output of 60 tonnes per hour, tack coat at the Eight And Paise
rate of 2.50 kg/ 10 m2 of Bitumin grade RS-1, Twenty Nine Only
Bitumen Grade VG-30 in mix at the rate of
minimum 4.50% or as per design mix, using
crushed aggregates of grading -I, premixed with
bituminous binder and filler, transporting the
hot mix to work site, laying with a approved self
propelled paving machine equipped with an
electronic sensing device paver finisher with
sensor control to the required grade, level and
alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction as per MORTH specification
clause No. 505 complete in all respects.
6 134.00 Providing and laying 25 mm thick Semi Dense 5201.50 Rupees Five MT
Bituminous Concrete with B.T. aggregate as per Thousand Two
MORTH gradation asphalt grade VG-30 for Hundred One And
mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of Paise Fifty Only
total mix including heating and mixing the
aggregate and asphalt by continuous of batch
mix plant and hot laid process laying with paver
finisher and consolidation with roller as per
MORTH specification to achieve desire density,
including cost all materials equipments, tools
and plants, oil, kerosene, firewood, labour
charges etc. complete using contractor's own
machineries drum mix plant and paver finisher
7 107.00 Providing and Laying 20 mm thick mix Seal 5235.41 Rupees Five MT
Surface for patch work (paver patta) using B.T. Thousand Two
stone aggregate chips at the rate of 0.66 Hundred Thirty
cum/M.T. as per gradation of MORTH and Five And Paise
emulsion for tack coat at the rate of 2.50 Forty One Only
Kg/Sqm and asphalt VG-30 for mixing at 5.09%
(i.e.50.90 kg./M.T.) of total mix heating & mixing
by continuous batching of drum mix plant and
transporting, spreading, laying the same by
paver finisher and consolidation with vibratory
power roller including cost of fuel, kerosene,
lubricant, labour charges etc. comp. using
contractor's own drum mix plant, necessary
equipments, tools and plants etc. complete.
8 2327.95 Providing and applying asphalt painting by 69.69 Rupees Sixty Nine SQ M
mechanical sprayer on B.T. surface using And Paise Sixty
bitumen grade Vg-30 at the rate of 5.00 kg/10 Nine Only
Sq.m & spreading stone dust @ 0.03 cumt./10
Sqm on painted surface including operating cost
of contractor own equipment, fuel, lubricants,
carting of required materials all labour and
material cost, preparing surface by brushing
with mechanical broom/compressed air and
finally fanning the cleaned surface with gunny
bags to remove all loose dirts etc. complete.
9 42.00 Providing services of Hydraulic Excavator with 1040.30 Rupees One Hour
fuel as per instruction given by Engineer in Thousand Forty
charge in suda area. And Paise Thirty
10 20.00 Providing services of male/female labour for 636.50 Rupees Six Each/
various work including earthwork,jungle cutting, Hundred Thirty day
road side dressing work, clearing waterway of Six And Paise Fifty
CD works, etc with all necessary tools Only
equipments with fuel and transportation
complete and as per instruction by Engineer in
Rupees Forty One Lakh(s) Ninety Six Thousand Four Hundred Forty Seven And Paise Eight Only
I/We am/are willing to carry out the work at _______ % above/below ( percent should be written in figures
and in words) of the estimated rates mentioned above. Amount of my / our tender works out as under.
*Estimated amount *Estimated amount
put to tender 4196447.08 put to tender
Deduct ___ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- All work shall be carried out as per public work department hand book and other specifications of Division
Note 2:- or as directed
Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and hold
Note 3:- goodContractor
The for work under all condition,
shall exhibit a boardsite, moisture/
Government etc No. BDG/ 3277/ 1657/ N Dated
Note 4:- 26/1/1997 S (M.GUJ) with detailed specification and details of work
The Contractor is solely responsible to bare all applicable taxes and amount
i.e. G.S.T. etc. andinvolved at site
Department without
entertain any contractor representation to reimburse any financial burden due to applicable taxes i.e.
Signature of Bidder Executive Engineer
Surat Urban Development Authority
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02-01-SBD.pdf
02-02-Technical Specification.pdf
02-03-Schedule-B.pdf
Download all tender documents and submit your bid