Work of Constructing Precast Compound Walls in Various Plots of A,M.Co.,Ltd. in Sardarnagar and Other Wards in the North Zone (ARC).
280179
E Tender Notice No. 18/2025-26 Tender No.114
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹3,600
Municipal Commissioner, Ahmedabad
₹2 L
6 Mar 2026
6 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Sr. Department No. of Total Amount
The technical bid shall be opened online on Dt.- 20.03.2026 at 11.00 hrs. Any change /
correction / corrigendum in respect of above work shall be placed on line. Contractors are
requested to see the website before 24 hours of submission of their tender
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for Work of
Constructing Precast Compound Walls in Various Plots of A,M.Co.,Ltd. in Sardarnagar
and Other Wards in the North Zone (ARC).
1 Name of work Work of Constructing Precast Compound Walls in Various
Plots of A,M.Co.,Ltd. in Sardarnagar and Other Wards in
the North Zone (ARC).
2 Tender Amount Rs. 2,00,00,000/- (exclusive of GST). GST will be paid
(Estimate put to Tender) extra by AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.3600.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
4 Time Limit 12 MONTHS (Excluding Monsoon)
5 Required registration Register “B” class in AMC or PWD in Govt. R&B/CPWD/AMC or
equivalent register with any other state Govt. or institutions.
6 Preliminary Average annual financial turnover during the last 3 years, ending 31st
prequalification criteria of March of the previous financial year, should be at least 30% of the
bidding firm (detailed estimate put to tender for this work.
criteria are given in the Bid Experience of work of similar nature during last 5 years
Document) • One Similar completed work costing not less than the amount
equal to 80% of the estimated tender cost OR
• Two Similar completed work costing not less than the amount
equal to 50% of the estimated tender cost OR
• Three Similar completed work costing not less than the amount
equal to 40% of the estimated tender cost
7 Solvency certificate Solvency certificate issued and valid in current year for an amount
equal to 20% of the Estimated amount put to tender.
8 Earnest Money Deposit Rs.2,00,000.00 (Demand Draft or pay order or Bank Guarantee in
(Bid security) favor of Municipal Commissioner, AHMEDABAD/) To be submitted
(1 % of Estimate put to as prescribed in 8.0 below. Demand Draft or Bank Guarantee shall be
tender) from Nationalized Bank / Scheduled Bank and valid for 120 days.(As
per AMC finance dept. circular No-5 Dt.5/5/07 & F.D. Circular No.
Dt. 7/08/2010) & attached ANNEXURE - 1 finance dept. circular No -
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager (NORTH zone) , Rajiv Gandhi Bhavan, Memco-
Naroda Road, Ahmedabad To be Submitted Physically As per N.I.T
10 Mode of sending the • Price bid should be submitted by online e-tender only and
Tender Documents Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate (One Original & One Duplicate) Each part
shall be separately duly sign & seal by contractor .
11 Last date of online Date.16.03.2025 up to 17.00 hrs.
submission of tender
12 Submission of Price Bid The Price bid shall be submitted online only. It shall not be submitted
13 Opening of Technical bid Technical Bid will be opened online as per N.I.T. in the office of
Addl. City Engineer (North Zone), Rajiv Gandhi Bhavan, Memco –
Naroda Road, Ahmedabad Municipal Corporation, Ahmedabad
14 Tender validity period 180 days from the last date of submission of Tender. it should be
valid for 180 days from the last date of online tender submission.
15 Security Deposit 5 % of Contract Value to be submitted in the form of Bank Guarantee
as per. Bank Guarantee shall be from approved list of AMC of banks
and the issuing branch of bank guarantee shall be of Amdavad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work. The Security Deposit shall
be payable in 15 days from date of receipt of LOI failing which interest
@4% per annum will be charged by AMC.
16 liquidated damages 0.1% of contract price per day from the date of delay. Maximum limit
of liquidated damages for delay in completion of work will be 10% of
the Contract Price rounded of to the neared thousand.
17 Deduction of Retention 2 % amount of each Running Bill shall be deducted as a Retention
Money from each RA Bill Money. Such retention money shall be released in the final bill of the
18 Labour welfare cess 1% Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
19 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or
parts of work major part of any amount, the contractor shall be bound to start the
work within 48 hours so intimation of work. Communication done
telephonically via SMS, via whatsapp and through letter/ E-mail shall
be considered legal and binding for the same. Contractor shall bound
to execute more than 1 work at the same time as and when required by
the department.
20 During execution of works in any case if any fatal accident (major or minor) occurs due to poor work
and poor safety precautions, then it will be completely contractor’s responsibility and compensation
for the same has to be paid by contractor. During execution of works if any news is published in
print/Electronic/Social media regarding inferior quality of work and poor safety precautions, and
due to inferior quality work any fatal injuries occurs, all the losses due to such accidents and
expenses of legal matters shall be borne by contractor.
Note: Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject
any or all the tenders without assigning any reasons thereof.
The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized
signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered
Seal and Signature of the Bidder Add.CityEngineer(North Zone)
Date: Amdavad Municipal Corporation
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 Work of Constructing Rs.2,00,00,000/- Rs.2,00,000/- 12-- MONTHS
Precast Compound Walls (Excluding
in Various Plots of Monsoon)
A,M.Co.,Ltd. in
Sardarnagar and Other
Wards in the North Zone
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand
Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable. The Details of Tender
fees shall be submit with scan copy at the time of Quoting price bid of the tender and
Physically to be submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the
Works in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have
to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addl.City Engineer (N/Z) , 1st
Floor, Rajiv Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road,
Ahmedabad-25. in the presence of bidders or their representatives who choose to attend. In
the event of the specified date of bid submission/opening being declared a holiday for the
Employer, the bids shall be received /opened on the next working day at the same place and
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FEATURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as
per N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two
separate envelope (marked as “original” and other marked as “Duplicate”) in schedule time by
RPAD/ Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer
envelope. The Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Naroda Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder.
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT
ONLY. Projects for which incomplete information has been provided will not be considered
for evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their
representatives who choose to attend on the date and time mentioned in the IFB. In the event
of specified date of bid opening being declared as a holiday for the Employer, the Tender
will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD,
the amount and validity of EMD furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied
with valid EMD will be taken up for further evaluation. In case, the Bank does not confirm
the EMD, the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity,
is accompanied by the requisite certificates, undertaking and other relevant information
specified in the bid documents and is substantially responsive to the requirement of the
bidding documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
Including the information disclosed to those present in accordance with Sub Clause
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
will not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined
to be substantially responsive in accordance with Clause 2 and qualified for award of
Contract in accordance with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule
date and time. In the event of specified date of bid opening being declared bidders who
qualify the criteria then bidder bid will be considered for opening of price bid.(Following
clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated
Bid Price, provided that such bidder has been determined to be (i) eligible in accordance with
the provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance
with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his bid
has been accepted. This letter shall name the sum which the Employer will pay the
Contractor in consideration of the execution, completion and maintenance of the Works by
the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful
Bidder has to deposit security deposit / Bank Guarantee with in 15 days after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his
bid from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder
has been announced. Any effort by a bidder to influence the Employer's processing of bids or
award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall
be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31,32 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth
vtzJtbt ytJuj /ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc
G.S.T sgt jtdw vz<tu ntug ðgt moehnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt
htFe xuLzhlwk cezekd fhJtlw hnuNu.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
Work of Constructing Precast Compound Walls in Various Plots of A,M.Co.,Ltd. in
Sardarnagar and Other Wards in the North Zone (ARC).
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for Required class
and or equivalent with specialization in road works. If contractor is not registered with
AMC in the relevant class, on award of contract he shall be required to register himself
with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as
the Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may
be required to provide evidence of the origin of materials, equipment, and services to the
satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined,
grown, produced or manufactured; similarly for equipments and from where the services are
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any
of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which
the reasons are attributable to the non-performance of the contractor, consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner
in a joint venture. A bidder who submits or participates in more than one bid for a contract
package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures
to comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to
Clause 16, bids which are not substantially responsive to the requirements of the bidding
documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder
and the Employer shall be written in the English language. Supporting documents and printed
literature furnished by the bidder may be in another language provided they are accompanied by
an accurate translation of the relevant passages in the English language, in which case, for
purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works
as described in bidding documents, based on the percentage rate amount in the Bill of
Quantities submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both
in figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for
a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified additional
period. The request and the responses thereto shall be made in writing or by fax. A bidder
may refuse the request without forfeiting his bid security. A bidder agreeing to the request
will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with Clause
( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted,
the Employer will direct him to submit the Performance Security and attend the Employer's
office on a date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to
do high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question. The Employer will declare the firm ineligible, either indefinitely or for a stated
period of time, to be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION
if it at any time determines that the firm has engaged in corrupt or fraudulent practices in
competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those
close to them, or induce others to do so, by misusing the position in which they are
placed, and it includes the offering, giving, receiving, or soliciting of anything of
value to influence the action of any such official in the procurement process or in
contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the
Borrower, and includes collusive practice among bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels and
to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and
contract without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If
the Tender volume is submitted without valid documents and without proof of eligibility
criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety
Laws.(the existing laws as well as framed from time to time). Any penalties laid due to
violation of such laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
night. During night working hours safety in charge personnel shall be provided with
florescent jackets.
The Contractor has to make all the necessary arrangements for making all the
temporary diversions for proper working at site Including traffic signages, safety cones,
traffic blinkers, barricading tapes, red and green flags etc for making easy smooth and
safe conditions for the traffic. The Contractor shall and must provide above at his own
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection
or new connection on behalf of AMC. It includes filling the necessary application to power
Supply Company, follow up and getting the supply, filling the necessary test reports to the
power supply company. All official fees Including security deposits and other expenses shall
be of initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINANCIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and
the Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments Including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as
promptly as possible as but not later than 28 days after the expiration of the period of bid
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful
bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Bank
Guarantee for an amount equivalent to 5% (five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank
guarantee as per format shall be issued from any Nationalized or RBI approved foreign
bank having net worth of more than Rs.500 Crore of Indian Operation and acceptable to
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance Department Circular
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate
8. Penalty: - 10% of the Amount For Balance work After Date of Completion or extended time
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc.
on material procurement or any other component for the works from any source shall be borne
by the contractors.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract,
or for any other cause as of the date 28 days prior to the deadline for submission of the bids,
shall be included in the rates and prices and the total bid price submitted by the bidder and the
evaluation and comparison of bids by the Employer shall be made accordingly.
10. Qualification of the Bidder
10.1 Experience of bidder
Experience of having successfully completed similar works during last 7 years ending
last day of month previous to the one in which applications are invited should be either of
• Three similar completed works costing not less than the amount equal to 40% of the
estimate put to tender.
• Two similar completed works costing not less than the amount equal to 50% of the
estimate put to tender.
• One similar completed works costing not less than the amount equal to 80% of the
estimate put to tender.
(Definition of similar works shall be as mentioned in Appendix-XI)
(Escalation factor as mentioned below shall be used to bring the value of such completed
works to the level of Prev. financial year)
Year Financial Year Enhancement Factor
Base (year of inviting 2024-2025
Sub contractors experience and resources shall not be taken into account in determining
the bidder’s compliance with the qualifying criteria.
10.2 Bid Capacity
Assessed Available Bid Capacity = (2 AN –B), where
A= Maximum value of sum of all the contracts executed in any one year during last five
years (updated to the current price level) which shall take into account the completed as
well as work in progress :
B= Value of the existing commitments and on-going works to be completed during the next
N= Number of years prescribed for completion of the works for which the bids are
Note - 1 : The statements showing the value of existing commitments and on going works as
well as the stipulated period of completion remaining for each of the works listed should
be countersigned by the Engineer-in-charge, of the firm or the relevant
division/department of the firm, not below the rank of Manager / Chief Engineer /
ExecutiveEngineer.
2.:- An affidavit duly notorized on Stamp paper of Rs.100/- showing all on going works
shall have to be enclosed while bidding the tender.
Even though the bidders meet the above criteria, they are subject to be rejected, if they
(a) made misleading or false representation in the form, statements and attachments
submitted, and/ or
(b) Record of poor performance such as abandoning the work, not properly completing
the contract, inordinate delays in completion, litigation history, or financial failures
• Sub-Contractors' experience and resources shall not be taken into account in
determining the bidder's compliance with the qualifying criteria.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be
applicable. Binding on the contractors unless specifically mentioned about it hereunder in
clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer
wherever written.
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work
of Work of Constructing Precast Compound Walls in Various Plots of A,M.Co.,Ltd. in
Sardarnagar and Other Wards in the North Zone (ARC).
OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in
Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the
heading “TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately
elsewhere in the tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given
separately elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to
that letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is
given within 10days of issuance of Letter of Intent, time limit shall be counted from that
date. If S.D is given after 15 days of issuance of letter of intent, contractor shall be finned
Rs. 200/- per day of delay and shall be deducted from contractor’s bill. In this case time
limit shall start latest by the 10th day of letter of intent, Security Deposit of 5% of tender
amount shall be deposited by pay order, demand draft, . of nationalized bank /scheduled
bank by pay order, demand draft, . of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC.
2. In case of earnest money . bounce back, contractor’s tender shall treated as cancelled and
the contractor shall not be given any tender, offer, quotation work in AMC for one year.
3. Conditional tender shall not be accepted
4. Tender validity period is 180 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and
B-1 form conditions shall be applicable. In case of controversy, Add.C.E’s decision shall
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any
service line of electric, telephone, gas, any type of service cable ,drainage or water lines
etc. In case of damage to service line, the whole responsibility of accident shall be on
contractor’s shoulder. It will be responsibility of contractor to safe guard the labours
against any accident or damage of lives. In case of police complain, Contractor shall be
held responsible for negligence. In case of soil /land collapse, contractor shall be held
responsible for not supporting the soil suffering with strutting, shuttering Contractor shall
safeguard the labour before allowing the labour to enter in excavated or other site. In case
of accident to labours, contractor shall be held responsible for police complain against
him. AMC’s staff shall be responsible for any accident at the site of the work.
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the
date of work order.
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is
put up on AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of
14. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender
item quantities. In such case contractor shall not have right to any price rise. In case of
decrease in any tender item quantity, contractor shall not ask for compensation.
16. If any construction material brought to site by contractor , is not as per specification, or
any inferior quality material brought to site, then such rejected material shall be removed
from the site within 24 hours, otherwise AMC can throw away such material at any place
and recover the amount for such removal work from contractor bill. In this case
contractor shall not be entitled for compensation.
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle
for taking material/staff from site to testing laboratory/ manufacturing site and contractor
shall be bear the cost of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become
obstruction to any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of
work/before start of work, during work and after the completion of work, with digital
camera and deposit to AMC office or transfer photograph from camera to AMC
computer. No additional cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled for any
compensation Or right
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If
item is not available in SOR, then market rate shall be derived by the Eng. dept by rate
analysis. Contractor shall not ask for the rates as per his rate analysis. This should be
clearly understood and taken in to consideration while quoting the tender by the
24. During execution of work, contractor shall take safety measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement
& instruction of Engg.- in- charge. In case of accident due to lack of protection,
contractor shall responsible for police complains, compensation etc AMC staff shall not
be held responsible for contractors negligency.
25. If instructed by AMC officials, contractor shall have to keep daily progress register and
get is signed by Ass. city Engineer. Contractor shall maintain record of daily No. of
labours, employed, work done, rectification work carried out by contractor after Eng.-in-
charge inspection & the compliance of the same. If such rectification work is not done by
contractor within 24 days the contractor shall be finned Rs. 250/- day of delay & shall be
recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of
tender or tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills
as per tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come
in to force, by State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site
requirement during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
32. Contractor shall have to register the work as per labour act & as per building safety act,
1906 with ,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner
office, Khanpur, Ahmedabad.
33. Befor quoting tender, contractor shall have to take complete information of the work after
seeing site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood
the item of works, site conditions. He should be in a position to provide labours at the
time of festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other
time of the year Contractor can not say that he has no labours due to festivals.
36. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for
this work and all the bidders are bound to follow the same, so the bidder must check
before applying for the tender.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Addl. City Engineer
Date: (North Zone)
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 xuLzhhle jtgft<
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuL÷ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu.
dJobuLxlt btLg ftuLx[[tfxhu y.Bgw.ftuvtuo.btk btLg ftuLx[[tfxhtule gtœebtkk hSMxu[Nl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Keltkk «btKvºtle MJ«btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s
ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<,
ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17, <t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMx[uNl Ve,
heLgwyj Ve <&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath
yluJvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb
fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu,
gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt bubtuhuLzbbt sKtJuj «btKu le hnuNu.
3: xuLzh Jujezexe rvhegz ( 180 ) rœJm mw^ele hnuNu.
4: xuLzh Ve ylu R.yub.ze.
4 y: xuLzh Ve zebtLz z[tVx &e aqfJJtle hnuNu. œhuf xuLzh œeX yjd xuLzh xuLzh Ve ChJtle hnuNu. xuLzh Ch<e
JF<u yluoMxble ChJtle hnuNu. ytuAe hfble xuLzh Ve,R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj)
4 c: xuLzh mt&u bwfJtbt ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhkxe/zebtLz z[tVx MJefthJtbtk ytJNu.
œhuf xuLzh œeX yjd R.yub.ze ChJtle hnuNu. R.yub.ze hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb btxu
htu¾zt, zebtLz z[tVx, cukf duhkxelt MJYvbt <&t Yt. 1 fhtuz &e Wvhle ykœtS< hfblt ftb btxu R.yub.ze le
hfb btºt zebtLz z[tVx, vu ytuzoh fu cukf duxhelt MJYvbtk ytvJtle hnuNu. yLg ftuR he<u Chuj R.yub.ze. btLg
htFJtbtk lnek ytJu ylu xuLzh hœct<j XhNu.
4 f: xuLzh Ve <&t R.yub.zele hfblt ze.ze vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlw ltb <&t btuctRj lkch ylu
vtxeo ftuz yJ~g jFJtltu hnuNu.
4 z: cukf duhkxe btºt ybœtJtœ Nnuhle s MJefthJtbt ytJNu.
4 R: ytuAe hfble xuLzh Ve, R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
5 y: xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Che xuLzh ztu¾gwbuLxm vh< fhJtlt hnuNu.
5 c: fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhJuj
l ntug <u ftuLx[txh©eyu xuLzh ChJt lne.
5 f: ftuLx[ftxhtuyu xuLzhbt cukflw ltb,Ft<t lkch ,btRfh lkch, mhltbw ,btu.lkch,vtxeo ftuz ,RbuRj ytRze MvÐ
5 z: yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvhtuf< mhltbu YcY/hSMxh yuze./Mvez vtuMx/ fwheyh &e rlg< mbg
bgtoœtbt btufjJtlt hnuNu.mekdj xuLzh ftuve/mne fgto Jdhle ftuve hœ fhJtbt ytJNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt. xuLzh Chlthu yt he<u cl<e hfb vK Ftltbtk
ltuk^Je ylu hfbltu fwj mhJt¤tu bwfJtu.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
3) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7) xuLzhbt stu ftuR mw^tht J^tht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju œeJmu rlg< JucmtRx y&Jt Jtuzo
fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu ytJe
ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh
Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh
ybtLg dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu
ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
xuLxhhu ctujvtuWLx vul lt cœju Ntne Jt¤e vul &e Chujt xuLzh <whk< s ybtLg dKJtbkt ytJNu.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk bwfuj
Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt
xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu.
ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu
nff œtJtu fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s
œuJtlwk Au <uJtu &R NfNu lrn.
8 R: xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu
<ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth
mhCh fhJtbtkk ytJNu.
xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg
htFJtbtkk ytJNu.
10 y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY
&guj dKJtbt ytJNu. <&t <u mbg œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
10 c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk
ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt
rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10 f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu suxjt rœJm ftbdehe btuze vqhe fhuj ntug <uxjt
rœJmle vulÕxe xuLzh hfb (fhth rfkb<) lt 0.1 % bwsc «r< rœJm bwsc xuLzhbtk bkswh &guj mbgbgtoœt
ctœlt FhuFh ctfe ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
11 y: awfJKe xuLzh Chuj œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mrJom-ftbdehe,
Jes¤e, htugÕxe Jduhu <btb Faoltu <&t sYh sKtg ðgthu ht<vt¤elt ftblu jd<t J^thtlt Faoltu mbtJuN &Nu
ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu lnekk. xuLzh Chlth
Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe <u ctkk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje
btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu
œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt
<ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK ò<lt ctk^ftblt
bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «Joðbtl rlgb bwsc fhJtbt ytJNu. <&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb (xuLzh bwsclwk vubuLx + yu¾Mx[t
ytRxb) Wvh 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt
cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
(2) xuLzh Vtubolwk CtJvºtf
(3) MvuNeVefuNl
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
(2) xuLzh Vtubole ylwmwra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atso
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJtle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 : atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule
mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR
btKmlt òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegtœ &tg <tu <ule sJtcœthe vK
ftuLxtfxhle hnuNu. CuFz ^me l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu
<u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu. Bgwrl.ftuvtuohuNlltu ftuRvK MxtV
ytlt btxu sJtcœth hnuNu lrn. Btswhtultu rJbtu vK W<thJtu.
17 : bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm
jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u
ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu. yLg&t
<ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt
ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t
xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu
25: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ rM&<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awfJKe fhJtbtk ytJNu.
26: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe
ftuLx[tfxhle hnuNu.
27: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
28: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt
sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu
29: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu
bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu
Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
30: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt
31: vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth vtzJtbt
ytJuj/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc G.S.T sgt jtdw vz<tu
ntug ðgt mœhnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt htFe xuLzhlwk cezekd fhJtlw
32. mefgwhexe zevtuÍex / vVtuobLm duhxele hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb,ze.ze ,cukf duhkxelt
MJYvbt <&t Yt.1 fhtuz &e Wvhle ykœtS< hfblt ftb btxu mefgwhexe zevtuÍex / vVtuobLm duhkxele hfb btºt
ze.ze.,vuytuzoh, cukf duhkxe lt MJYvbt ytvJtle hnuNu. zebtLz z[tVx / cukf duhkxe ‘‘ Bgwrl.frb§h©e ybœtJtœ
’’lt ltbltu ytvJtltu hnuNu.
33.ybœtJtœ Bgwrlrmvj ftuvoutuhuNl Bgwrlrmvj frbNlh©ele muLx[j yturVm mh¾gwjh lk 41 bwsc xuLzhhyu
ltufheœt<t <hefu hSMxu[Nl Vhrsgt< fhtJJtlw hnuNu.
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft<
je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le
ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
TECHNICAL SPECIFICATIONS
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter
and other deleterious material which will either weaken the mortar or concrete or cause
efflorescence or attack the steel in R.C.C Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled
water. Comparison shall be made by means of standard cement tests for soundness, time
of setting and mortar strength as specified in I.S.269-1976. Any indication of
unsoundness, change in time of setting by 30 minutes or more or decrease of more than
10 per cent in strength of mortar prepared with water sample when compared with the
results obtained with mortar prepared with distilled water shall be sufficient cause for
rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise
interfere with the hardening of concrete during curing or those which produce
objectionable stains or other unsightly deposits on concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag
cement as per I.S. 455-1976.
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed
10% of cement used in the Mix. The mixture of pigment shall be properly grounded to
have a uniform colour and shade. The pigments shall have such properties to provide for
durability under exposure to sunlight and weather.
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free
from injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali,
salts organic matter, loam, mica or another deleterious substance and shall be got
approved from the Engineer-in-charge. The sand shall not contain more than 8 percent of
silt as determined by field test. If necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not
The sieve analysis of coarse shall be as under:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand
shall be as under:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent adhesion of mortar Grit
shall generally be cubical in shape and as far as possible flaky elongated pieces shall be
avoided. It shall generally comply with the provisions of I.S. 383-1970. Unless special
stone of particular quarries is mentioned, grit shall be obtained from the best black trap or
equivalent hard stone as approved by the Engineer-in-charge. The grit shall have no
deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to
used to built up the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to
VII) 1963, as per instructions of the Engineer-in-charge. The necessity of test will be
decided by the Engineer-in-charge. The necessity of test will be decided by the Engineer-
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and
sand as may be specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill
shall be used for preparation of lime mortar. The slaked lime shall be placed in the mill in
an even layer and ground for the 180 revolutions with a sufficient water. Water shall be
added as required during grinding (care being taken not to add more water) that will bring
the mixed material to a consistency of stiff paste. Thoroughly wetted sand shall then be
added evenly and the mixture ground for another 180 revolutions.
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used
up , covering it by tarpaulin or open sheds.
10.4. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used
on the day on which it is prepared. But in no case mortar made earlier than 36 hours shall
be permitted for use.
MATERIAL TESTING Frequency AND Acceptance Criteria AS BELOW
Sr Test Frequency of tests Code for Acceptance Samplling
No testing Criteria Point
a Initial Setting Time 50-100 T – 2 sample Not less than
Final Setting Time 100-200 T – 3 sample IS 4031 part 5 Not more than
IS:12269 600 minutes Site/Plant
200-300 T – 4 sample
300-500 T – 5 sample
500-800 T – 6 sample
810-1300 T – 2 sample
b Fineness by sieve One Sample (Each IS 4031 part 1 90% passed
sample as above) & 2 IS:12269 from 90 micron Site/Plant
c Consistancy One Sample (Each IS 4031 part 4 Above 30%
sample as above) IS:12269
Compressive One Sample (Each IS 4031 part 6 for OPC&PPC Site/Plant
d strength sample as above) IS:12269 on seven day
on twenty eight
a Silt Content by 2 Test / Season IS:383,IS:2386 Up to 3% Site/Plant
b Silt Content by 2 Test / Season As per CPWD Max 8% Site/Plant
c Fineness modulus 2 Test / Season IS:2386,Morth Specification as Site/Plant
d Seive Analysis 2 Test / Season IS:383,IS:2386 As IS-383 Site/Plant
e Water absorption 2 Test / Season IS:383,IS:2386 Less than 3% Site/Plant
f Moisture content 2 Test / Season IS:383,IS:2386 Site/Plant
g Specific gravity 2 Test / Season IS:383,IS:2386 Site/Plant
h Bulk density 2 Test / Season IS:383,IS:2386 Site/Plant
3 Coarse Aggregate
for Building work
a Sieve Analysis 2 Test / Season Is:2386,IS:383 As per relebant Site/Plant
b Impact value 2 Test / Season Is:2386,IS:383 45% Max by Site/Plant
c Flakiness Index Rendom Is:2386,IS:383 35% Max value Site/Plant
as per morth cl
d Elongation Index Rendom Is:2386,IS:383 35% Max value Site/Plant
as per morth cl
e Crushing value 2 Test / Season Is:2386,IS:383 45% Max by Site/Plant
f Moisture content 2 Test / Season Is:2386,IS:383 As per required Site/Plant
g Water absorption 2 Test / Season Is:2386,IS:383 Less than 3% Site/Plant
h Specific gravity 2 Test / Season Is:2386,IS:383 As per standard Site/Plant
a Efflorescene 1 Test / 50000 nos IS 1077/3495 Moderate Site
b Water absorption 1 Test / 50000 nos IS 1077/3495 Less than 20% Site
c Compressive 1 Test / 50000 nos IS 1077/3495 Min. Avg Site
strength 35kg/cm2 &
d Dimension 1 Test / 50000 nos IS 1077/3495 As per standard Site
5 Cement Concrete As Per IS 456-2000 IS 456 Grade Design -
Cubes Ordinary Cube
and Controlled Compressive
Concrete Strength at
Work M3 - no of M10 =
51m3 & above = M35 =
Add sample for each
50 m3 part there of
TMT bars 1 test / 40 MT IS 1786 Fe-500
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
Item Excavation for foundation upto 1.5 mt. depth Including sorting out stacking of useful
material & disposing of excavated stuff upto 50 mt. lead Loose or soft soil
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat
etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed.
The materials so obtained shall be property of the Government and be conveyed and
stacked as directed. within 50 M. lead. The roots of the trees coming in the sides shall
be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all
parts of the work. Contractor shall supply laborers, materials, etc. required for setting
out the reference marks and bench marks and shall maintain them as long as required
The excavation in foundation shall be carried out in true line and level and shall have the width
and depth as shown in the drawings or as directed. The contractor shall do the
necessary shoring and shutting or providing necessary slopes to a safe angle, at his own-
cost. The payment for such precautionary measures shall be paid separately if not
specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be
allowed for bringing it to level, if mistake or any other reason excavation is made.
deeper or wider that shown on the plan or directed. The extra depth or width shall be
made up with concrete of same proportion as specified for the foundation concrete at
the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or
leveling the ground in layer Including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work
to a place as directed with lead upped 50 M. and all lift.
Measurement shall be given on Cmt. basis.
Item Conveyance charge of earth murrum, building rubbish, manure, garbage, sludge,
excavated rock,fly ash, aggregates of any kind etc.comp up to 5 km.
The rate shall be for a unit of Cmt. Number
Item Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 hand broken
stone aggregates 40 mm nominal size) and curing complete including cost of form work
in Foundation and plinth
1.0. Materials: 1.1. Water shall conform to M-l. Cement shall conform to M-3. Sand shall
conform to M-6. Stone aggregate 40 mm. nominal size shall conform to M-12.
2.0. 2.1.General: 2.1.1. Before starting concrete bed of foundation treaches shall be cleared of
all loose materials, levelled, watered and rammed as directed.
2.2. Proportion of Mix : 2.2.1. The Proportion of cement, sand and coarse aggregate shall be
one part of cement, 3 parts of sand, 6 parts of stone aggregates and shall so measured by
2.3. Mixing : 2.3.1. The concrete shall be mixed in a mechanical mixer at the site of work.
Hand mixing may however be lowed for smaller quantity of work if approved by the
Engineer-in-charge. When hand mixing is permitted by the Engineer- in-charge in case of
break-down of machineries and in the interest of the work, it shall be carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the
mass is uniform in colour and consistency. However such cases 10% more cement than
otherwise required shall have to be used without any extra cost. The mixing in
mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall
be sufficient to produce a dense concrete of required workability for the purpose.
2.4. Transporting & Placing the concrete :
2.4.1. The concrete shall be handled from the place of mixing to the final position in not more
than 15 minutes by the method s directed and shall be placed into its final position,
compacted and finished within 30 minutes of mixing with water i.e. before the setting
1.4.2. The concrete shall be laid in layers of 15 cms. to 20 cms.
2.5. Compacting: 2.5.1. The concrete shall be rammed with heavy iron rammers and rapidly
to get the required compaction and allow all the interestices to be filled with mortar.
2.6. Curing : 2.6.1. After the final set, the concrete shall be kept continuosly wet, if required
by ponding for a period of not less than 7 days from the dale of placement.
2.7. Mode of measurement and Payment:
2.7.1. The concrete shall be measured for its length breadth and depth, limiting dimensions to
those specified on plan or as directed.
2.7.2. The rate shall be for a unit of one cubic metre.
Supply of Double Tee Precast/Prestress Panel of Concrete Grade M-40 with size 2000mm X
1990 mm X 50 mm with tee col.of size 150 X 150 X 50 mm.
The rate shall be for a unit of one RUNNING metre.
Erection of Double Tee Precast/Prestress Panel of Concrete Grade M-40 with size
2000mm X 1990 mm X 50 mm eith tee col.of size 150 X 150 X 50 mm.
The rate shall be for a unit of one RUNNING metre.
Providing and laying controlled cement concrete M.200 and curing complete including the cost of
formwork and reinforcement for reinforced concrete work in (A)Foundations,footings,
Base of columns and Mass concrete
(A) Foundations, footings, base of columns, and mass concrete.
(B) Walls from top of foundations/level upto floor two level.
(C) Slabs, landing shelves, Balconies, lintels, beams, girders, and cantilever, upto floor two level,
(D) Columns, pillars, posts, and struts upto floor two level
(E) Staircase upto floor two level.
(F) Vertical and horizontal fins upto floor two level.
1.0. Materials : 1.1. Water shall conform to M-l. Cement shall conform to M-3. Sand shall
conform to M-6. Grit shall conform to M-8 Coarse aggregate shall conform M-12 B.
2.1 The relevant specifications of item No. 5.4.1. of ordinary concrete shall be followed
except that the concrete mix shall be designed from preliminary tests, the proportioning
of cement and aggregates shall be done by weight and necessary precautions shall be
taken in the production to ensure that the required work cube strength is attained and
maintained. The controlled concrete shall be in grades of M-100, M-150, M-200, M-250,
M-300, M-350, & M-400, with prefix controlled added to it. The letter ‘M’ refers to mix
and numbers specify 28 days works cube compressive strength of 150 mm. cubes of the
mix expressed in Kg./Cmt.
2.2 The porportion of cement, sand and coarse aggregates shall be determined by weight,
the weight batch machine shall be used for maintaining proper control over the
porportion of aggregates as per mix design.
The strength requirements of different grades of concrete shall be as under:
Grade of Concrete Compressive strength of 1 5 cms. 28 days, conducted in accordance
cubes in Kg./Cmt. at with I.S. 516-1959.
Preliminary test
Min. Work test Min.
In all cases, the 28 days compressive strength specified in above table above be the
criteria for acceptance or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, lies in between the strength
of any two grades specified in the above table, such concrete shall be classified in for all
purposes-as concrete belonging to the lower of the two grades between which its
3.0. Workmanship :
3.1. The proportions for ingradients chosen shall be such that concrete has adequate
workability for conditions prevailing on the work in question and can be properly
compacted with means available except where it can be shown to the satisfaction of the
Engineer-in-charge, that the supply of properly graded aggregate of uniform quality can
be maintained till the completion of work. Grading of aggregate shall be controlled by
obtaining the coarse aggregates, in different sizes and beingint hem in the right
proportions as required. Aggregate of different sizes shall be stocked in separate stock
piles. The required quantity of material shall be stock piled several hours, preferably a
day before use. The grading of coarse and fine aggregate shall be checked as frequently
as possible, the frequency for a given job being determined by the Engineer-in-charge to
ensure that the suppliers are maintaining the uniform grading as approved for samples
used in the preliminary tests.
3.2. In porportioning concrete, the quantity of both cement and aggregate shall be
determined by weight. Where the weight of cement is determined by accepting the
maker’s weight per bag a reasonable number of bags shall be weighted separately to
check the net weight. Where cement is weighted frombulk stocks at site and not by bags,
it shall be weighted separately from the aggregates. Water shall either be measured by
volume in calibarated tanks or weighed. All measuring equipments shall be maintained in
clean, and serviceable condition. Their accuracy shall be periodically checked.
3.3. It is most important to keep the specified water cement ratio constant and at its correct
value. To this end, moisture content in both fine and coarse aggregates shall be
determined by the Engineer-in-charge, according to the weather conditions. The amount
of mixing water shall then be adjusted to compensate for variations in the moisture
content. For determination of moisture, content in the aggregates, I.S. 2389 (Part-III)
shall be referred to. Suitable adjustments also be made in the weights of aggregates due
to variation in their moisture content. Minimum quantity of cement used in concrete
shall not be less than 220 Kg./M 3 in plain concrete and not less than 250 Kg/M3 in
reinforced concrete.
4.0. Mode of measurement and payment:
4.1. The relevant specifications item No, 5.4.1. shall be followed except that the controller
concrete R.C.C. work for work as specified in item shall be measured under this item. The
rate excludes cost of form work.
4.1. The rate shall be for a unit of one cubic metre.
Distempering in 2 coats with oil bound distemper of approved brand and manufacture and of
required shade on wall surface to give an even shade over and including a primer coat with
distemper primer of approved brand, thoroughly brushing the surface free from mortar
dropping and other foreign material and also inclusive of preparing the surface
even and smooth etc. complete, as directed.
The rate shall be for a unit of one sq. metre.
Providing & Fixing Structural steel work ( Confirming to IS 4923-1997) riveted, bolted or welded in builtup
for all type sections, in framed work, including cutting, hoisting, fixing in position and applying a priming
coat of approved steel primer all complete as per the structural designs and directions of Engineer in
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE
BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS
AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE
FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( North Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the term and conditions of tender for the work of Work of Constructing Precast Compound
Walls in Various Plots of A,M.Co.,Ltd. in Sardarnagar and Other Wards in the North
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to
pay to Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his
first written demand, without demur without delay and without the necessary of a previous of
judicial or administrative procedures and without the necessity of a previous of judicial or
administrative procedures and without the necessity to prove to the Bank the defects or short
comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect
during the period that would be taken for the acceptance of tender. However unless a demand of
claim under this guarantee is made on its in writing on or before the (Date to be specified will
not be less than 180 days from the stipulated date of receiving the tender) we shall be discharge
from all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .As per ANNEXURE –
Seal and Signature of the Bidder Addl. City Engineer (N.Z)
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for Work of Constructing Precast
Compound Walls in Various Plots of A,M.Co.,Ltd. in Sardarnagar and Other Wards in the
North Zone (ARC).
.as specified in the tender by the Ahmedabad Municipal Corporation.
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
have agreed to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we
the_ ______________________Bank provided the following Performance Bank, Guarantee by
way of these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in
Rs. _ __________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided
so as to ensure and indemnify the AMC for full and proper performance of the contract by
the _______________________________Bank hereby indemnify the AMC for all losses and /
or damages to the road surface which would be laid or resurface by
M/s.________________________ and such PERFORMACE GUARANTEE would include any
damage to hot mixes, dense bituminous macadam asphalt, concrete, seal coat, concrete blocks,
road markings, signage, steel structures which may be suffered by the AMC as a result of
defective production of mixes, because of poor workmanship, or at all, by way of this bond, we
the _________________________________Bank agree and promises that in the eventuality of
the contractors M/s. __________________________________________not repairing or
remeding the Problem, loss or damage to the road surface we shall indemnify and pay the AMC
such expenses, losses and damages that may be incurred by the AMC, as a result of the AMC
getting the work done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to
whether any losses or damages to the project have taken place or not and / or whether the work
suffers from poor workmanship or not will be taken by the Commissioner of AMC and on the
Commissioner's decision regarding such losses or damages or defect whatsoever being so
notified by the AMC to us, We shall immediately take steps and ensure that
M/s.__________________________________ faithfully and diligently carry out the necessary
remedial steps to the full satisfaction of the Commissioner of the AMC. The opinion of the
Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of
arriving at such decision as aforesaid it will be open to the Commissioner of the AMC in case he
so desires, to delegate this power to subordinate like the city Engineer to take appreciate decision
and the decisions referred to above will be deemed to be properly take and as if taken by the
Commissioner of the AMC. In the eventually of M/s.______________ not taking
remedial action to the almost satisfaction of the Commissioner of AMC. The AMC will be
entitled to get the work done itself or from sources. On the Commissioner of the AMC notifying
to us the total expenses incurred for this purpose. We hereby expressly have under taken to pay
the AMC the said amount forth with and in any case not less than 7 days from taken to pay the
AMC the said binding the amount indicted by the Commissioner of the AMC and our obligation
to pay such amount will be continuing of the AMC and our obligation irrespective of any dispute
of differences that may arise between us and M/s. _____________________________ of
3. The contract value is Rs. __________________________. This PERFORMANCE
GURANTEE is limited to 5% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of
five years and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such
completion that to us. In case, no such completion it is notified, this performance guarantee will
be a valid from five years from the date of execution of this agreement. The Performance
Guarantee will come into effect from such completion date. In case however, the contract of
several parts it will be opened to the Commissioner to indicate separate completion dates for
separate part and to simultaneously indicate a break up of the contract value equivalent to the
separate part. In which case the PERFORMANCE GUARNATEE to extent of the different
completion dates. It is expressly understood that the considering this period of five years and one
month, the date by which the Corporation, intimate the Bank about the losses, damages or
problems as the case may be, shall be considered as long as such intimation is within a period of
five years and one month from the completion date. We the ___________________ Bank will be
liable, irrespective of whether the remedial actions or lack thereof has taken place after the
period of the five years and one month.
5. We _________________________________ Bank agree that the PERFORMANCE
GUARANTEE which is continuing guarantee will be binding, and enforceable against us
irrespective of any difference / disputes between the AMC and M/s.
and irrespective of any change or variation or execution time or any forbearance or waiver made
or grant by the AMC to M/s.___________________________________.
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he
Commissioner of AMC whose decision in the matter will be final. In case any resource to any
court of law is necessitated, the appropriate Civil Court in the Ahmedabad along will have
Date: Signature of Contractor
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
____________________________________________ (here in after called “the Contractor”) of
the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor,
____________________________________________ and has accepted the bid by the
contractor for the execution and completion of such works and the remedying of any defects
therein at a contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the
Works and remedy any defects therein in conformity in all respects with the provisions of the
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such other
sum as may become payable under the provisions of the Contract at the times and in the manner
prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this Agreement
to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
STATEMENT NO.-1
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Year Name of Employer Value of the Reasons/Details for Remarks showing
Project Project (`) litigation/arbitration Present Status
(1) The bidder shall furnish separate table for individual project.
(2) The above information shall be supported with necessary documents otherwise the same shall
be treat as null and void.
(3) A consistent history of arbitration awards? Judgments against the applicants or any partner of a
joint venture may result in disqualification for proposed work.
(1) If the details of litigation History is hidden by the applicant and later on it comes to knowledge
of the employer the bidder shall be disqualified for the proposed work and other appropriate
actions shall be taken against the bidder.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
LIST OF KEY PERSONNEL TO BE DEPLOYED ON THIS CONTRACT WORK
S.No. Personnel Qualification
1 Site Engineer BE Civil 5 year Exp.
2 Surveyor ITI or Dip. Civil 2 year Exp.
3 Quality Engineer Dip. Civil 3 year Exp.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No 114 Volume 1.pdf
Tender No.114 Volume 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .