Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC 411 D JEEWAN PURAM BISHT DHARA BITHORIYA NO 1 HALDWANI HALDWANI NAINITAL UTTARAKHAND 263139 | NAINITAL | UTTARAKHAND | 263139 | L1 | Accepted-AOC Overall accepted as L1 | |
| 2 | L2₹6.2 L+₹69,105 (12.5%)Rejected-AOC NA | L2 | Rejected-AOC Overall disqualified | |
| 3 | Rejected-Technical BEHIND NIRMALA CONVENT SCHOOL CANAL ROAD KATHGODAM 263126 | NAINITAL | UTTARAKHAND | 263126 | - | Rejected-Technical The Bidder did not qualifies the TQR |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of SE, OandM Circle, PTCUL, Haldwani
Replacement of broken/punctured/damaged disc insulators in 132KV Bhowali-Kathgodam line under 220KV OandM Division, Haldwani
2023_PTC13_66870_1
SE(OandM)/PTCUL/HLD/49/2023-24
Open Tender
Electrical Works
Item Rate
120 days
Haldwani
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
EE, 220KV OandM Division, PTCUL, Haldwani
₹20,000
Office of SE, OandM Circle, PTCUL, Haldwani
15 Jul 2024
26 Dec 2023
27 Jan 2024
26 Dec 2023
25 Jan 2024
26 Dec 2023
10 Jan 2024
Transportation, loading and unloading of various kinds of line material such as disc insulators, fittings, tools and plants such as turn buckle, stay wire, ropes, liftys, pulleys, different tools, clamps and connectors etc. from the stores of 132KV S/s, Kathgodam to 5 different sites in line route such as Chanda Devi, Salari, Bohrakoon and several reserve forest areas through motorable roads, non-motorable roads, dense forest areas on suitable vehicle as well as on foot including head loading in hilly terrain in a total stretch of approximately 40-50 Kms. complete in all respect as per direction of engineer incharge.
Temporary earthing at R phase between tower No. 18-19, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Fixing of adequate stays including erection of turn buckle with the help of D clamp stay wire and nozzing of stay of stay wire at both ends, stringing and cutting of earth wire for proper erection work on crossarms of R phase between tower No. 18-19, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line, complete in all respect as per direction of engineer incharge.
Destringing of single phase ACSR Panther Conductor of R phase between tower No. 18-19, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line by safe opening of all clamps, connectors and fittings, lowering of damaged insulator strings with the help of pulley system and laying it properly on the ground complete in all respect as per direction of engineer incharge.
Re-stringing of ACSR Panther Conductor of R phase between tower No. 18-1, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line with the help of liftey, pulley system including all related works such as hoisting of new insulators including measuring, cutting, clamping and all work above ground level complete in all respect as per direction of engineer incharge.
Removing of temporary earthing at R phae between tower No. 18-19, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line for providing safe zone for safety of line workers complete in all respect as per direction of engineer incharge.
Removing of turnbuckle and staywire etc. after completion of disc insulator replacement work between R phase between tower No. 18-19, B phase between tower No. 20-21, Y phase between tower No. 24-25 and 27-28 and R phase between tower No. 40-41 of 132KV Bhowali-Kathgodam line complete in all respect as per direction of engineer incharge.
Transportation, loading and unloading of various kinds of line material such as disc insulators, fittings, tools and plants such as turn buckle, stay wire, ropes, liftys, pulleys, different tools, clamps and connectors etc. from different sites in line route such as Kathgodam, Chanda Devi, Salari, Bohrakoon and several reserve forest areas to the stores of 132KV S/s, Bhowali through motorable roads, non-motorable roads, dense forest areas on suitable vehicle as well as on foot including head loading in hilly terrain in a total strech of approximately 40-50 Kms. complete in all respect as per direction of engineer incharge.
JAILENDRA PRATAP SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .