| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-AOC | ₹16.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.5 L+₹2.4 L (15.0%)Rejected-AOC | ₹18.5 L+₹2.4 L (15.0%) | L2 | Rejected-AOC L2 |
| 3 | L3₹18.6 L+₹2.5 L (15.3%)Rejected-AOC | ₹18.6 L+₹2.5 L (15.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹18.6 L+₹2.5 L (15.8%)Rejected-AOC | ₹18.6 L+₹2.5 L (15.8%) | L4 | Rejected-AOC L4 |
| 5 | L5₹19.5 L+₹3.4 L (21.1%)Rejected-AOC | ₹19.5 L+₹3.4 L (21.1%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | SHOUKATHALI K L4 | MUHAMMAD RIYAS B A L3 | MUHAMMAD NOWFAL N A L5 | HEMNIKHIL K P L1 | ASHRAF C A L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00WORK | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 135 | sqm | 18.82 ₹2,540.7 | 18.82 ₹2,540.7 | 19.68 ₹2,656.8 | 9 ₹1,215 Lowest | 18.73 ₹2,528.55 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 3.6 | cum | 266.57 ₹959.65 | 266.5 ₹959.4 | 278.71 ₹1,003.36 | 150 ₹540 Lowest | 265 ₹954 |
| 1.00 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 260.93 | cum | 2,382.53 ₹6,21,673.55 | 2,365 ₹6,17,099.45 | 2,491.05 ₹6,49,989.68 | 2,000 ₹5,21,860 Lowest | 2,368 ₹6,17,882.24 |
| 1.00 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 260.93 | cum | 786.47 ₹2,05,213.62 | 786.5 ₹2,05,221.45 | 822.3 ₹2,14,562.74 | 918 ₹2,39,533.74 | 782 ₹2,04,047.26 Lowest |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 177.53 | cum | 4,132.12 ₹7,33,562.87 | 4,120 ₹7,31,411.24 | 4,320.33 ₹7,66,975.22 | 3,425 ₹6,08,029.98 Lowest | 4,100 ₹7,27,860.7 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.87 | cum | 10,852.96 ₹1,18,004.23 | 10,850 ₹1,17,972.05 | 11,347.3 ₹1,23,379.19 | 8,425 ₹91,605.03 Lowest | 10,740 ₹1,16,776.02 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 434.92 | kilogram | 116.33 ₹50,594.24 | 115.5 ₹50,233.26 | 121.62 ₹52,894.97 | 95 ₹41,317.4 Lowest | 115 ₹50,015.8 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 30.45 | sqm | 789.38 ₹24,038.99 | 789 ₹24,027.42 | 825.33 ₹25,133.77 | 640 ₹19,489.92 Lowest | 785 ₹23,905.61 |
| 1.01 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 141.75 | cum | 754.71 ₹1,06,980.14 | 745 ₹1,05,603.75 | 789.08 ₹1,11,852.09 | 600 ₹85,050 Lowest | 750 ₹1,06,312.5 |
Tender Value
₹16.9 L
EMD Value
₹42,358
Closing Date
9 Jun 2026, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Irrigation Division, Civil Station, Vidyanagar, Kasaragod-671123
GENERAL-FD-Protecting the Left bank of Uppala river at Thurthi kunnil near Bilal Masjid in Ward 11 of Meenja Grama Panchayath of Kasaragod District-General Civil Work
2026_Irrig_853746_1
IRR/IA/TR/3479/2022_5_3_2/1
Open Tender
Civil Works - Others
Item Rate
240 days
Thurthi kunnil near Bilal Masjid in Meenja GP
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,760
Yes
₹42,358
Yes
4 Jul 2026
2 Jun 2026
11 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORK | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.004 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.005 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.8 | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.009 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1442856.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1442856.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 2.40 MB
Date_corrigendum.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .