| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.1 CrAccepted-AOC | ₹47.1 Cr Quoted ₹46.4 Cr | 1 | Accepted-AOC LOWEST BIDDER |
| 2 | 2₹56.4 CrRejected-AOC 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹56.4 Cr | 2 | Rejected-AOC L 2 BIDDER |
| 3 | 3₹103.3 CrRejected-AOC NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹103.3 Cr | 3 | Rejected-AOC L 3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
17 Mar 2022, 1:00 pmClosed
SE Fuel
DCRTPP Yamuna Nagar
ARC for O and M of CHP in DCRTPP Yamuna Nagar
2022_HBC_209635_1
02/CHP/2021-22
Open Tender
Miscellaneous
1095 days
DCRTPP Yamuna Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹50 L
16 Aug 2022
24 Feb 2022
21 Mar 2022
25 Feb 2022
17 Mar 2022
25 Feb 2022
Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Crusher, Stacker Reclaimer, Weighbridges etc. The work also includes cleaning/ sweeping. Maintenance of Coal Handling Plant equipments such as Wagon Tippler, Conveyor System, Pulleys/ Idlers, Crusher, Stacker- Reclaimer etc. The work also includes mtc of Electrical, C & I, Lifts, AC and Ventilation System, including railway demurrage charges, Deployment of Stone Pickers for picking of stones, shales and other foreign material from running conveyors, Shifting, Segregation & Weighment of +250mm stones, Services of OEM of CHP Mechanical, Electrical and C&I system, Online Coal Sampler cum Analyzer, Lifts installed in CHP, painting of structure & equipments in CHP, rewinding & repair of motors upto 10 KW rating, repair of rollers for conveyor system, horticulture development & pollution control in CHP area and Fabrication of MS grizzly for WT/ERH & bunkers in CHP as per Detailed Scope of Work Annexure-IIIA & B.
Operation of equipment for feeding coal to the bunkers of Unit-I
Operation of equipment for feeding coal to the bunkers of Unit-II
Operation & Maintenance of Heavy Machinery equipments such as Bulldozers, Loaders, Cranes, Dumpers and Excavators, including repair charges as per detailed scope of work Annexure-IIIC.
Operation & Maintenance of Diesel Locomotives. This also includes provision of Loco operators and Shunt men. Including repair charges as per detailed scope of work Annexure-IIIC.
Upkeep/ Maintenance of Marshaling yard IIIE.
Operation & Maintenance of Mill Reject System of Unit-I including manual evacuation of mill reject by poking and cleaning of mill reject from mill area and loading & unloading and Shifting of mill reject by means of tractor- trolley/ trucks Annexure III D.
Operation & Maintenance of Mill Reject System of Unit-II including manual evacuation of mill reject by poking and cleaning of mill reject from mill area and loading & unloading and Shifting of mill reject by means of tractor- trolley/ trucks Annexure III D.
Charges per MT for Collection and preparation of coal samples from coal rakes at DCRTPP Annexure-IV. Tentative Qty. per annum is 17,21,400 MT calculated on the basis of coal rakes received yearly considering 3800 MT coal per rake
Lubricants and Spares for running of all Heavy Machinery equipments as per scope of work at Annexure-IIIC which mainly includes Loaders, Dozers, Excavator, Dumper and Locomotives etc and all type of Welding Electrodes, all type & size of Nut-Bolts, washers and Rollers for conveyors.
Diesel charges per coal rake for first year it will be included of taxes, handling charges and storage charges etc .Note:- (Total average 453 rake per annum received as per actual and total average 206 KL per annum diesel consumed as per actual cost considered at present day rates of diesel i.e. approx 90 Rs. per litre). Diesel Per Rake comes out to be 455 Ltr considered for calculating annual financial implication. However, firm will be paid monthly charges on the basis of actual number of rakes received in that month. Annually rakes received may be more or less.
Total Amount for First Year
Total Amount for Second Year
Total Amount for Third Year
AKA Logistics Private Limited
RENGA ENGINEERING WORKS INDIA PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf