| 1 | L1₹1.5 CrAccepted-AOC KADUMKEERIYIL SHOPPING COMPLEX THAMARASSERY KOZHIKODE 673573 | KOZHIKODE | KOZHIKODE | KERALA | 673573 | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹27.9 L (18.6%)Rejected-AOC REENA NIVAS EDAPPARA KANDIYIL KIZHAKKUMURI KAKKODI KERALA | KOZHIKODE | KERALA | 612906 | ₹1.8 Cr+₹27.9 L (18.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.8 Cr+₹28.2 L (18.9%)Rejected-Finance | ₹1.8 Cr+₹28.2 L (18.9%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 Cr+₹28.8 L (19.2%)Rejected-Finance | ₹1.8 Cr+₹28.8 L (19.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.9 Cr+₹36.6 L (24.5%)Rejected-Finance | ₹1.9 Cr+₹36.6 L (24.5%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.7 Cr
EMD Value
₹1 L
Closing Date
20 Mar 2024, 4:00 pmClosed
Executive EngineerTransmission Division
Transmission Division, KSEBL, Munduparamba, Malappuram, Kerala - 6765 09
Site leveling and construction of retaining wall and compound wall in connection with construction of 110kV Substation, Thiruvali
2024_KSEB_657535_1
TDM-05/2023-24
Open Tender
Civil Works - Others
Item Rate
240 days
Thiruvali
The participating contractor/firm must have exeperiance in similar works atleast one work of above Rs.2.7 Cr.with annual turn over of about Rs.2.7Cr.in 3yrs,shall be solvent for minimum of Rs.1.62Cr
10 documents required · 10 mandatory
₹8,850
Yes
₹1 L
Yes
OFFICE OF THE EE,TRANSMISSION DIVISION MALAPPURAM
24 Aug 2024
13 Feb 2024
27 Mar 2024
13 Feb 2024
20 Mar 2024
13 Feb 2024
13 Feb 2024 - 15 Mar 2024
20 Feb 2024
Amount
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited
Filling with department earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-incharge.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
'Supplying and laying 75mm PVC pipes in line and levels as per the direction of departmental officers at site
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
White washing two or more coat with white cement to give an even shade for newly plastered area
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
akr constructions
K K CONSTRUCTIONS
MUNEER P P
BASIL MATHEW
YES YEM CONSTRUCTION
ABDU RAHMAN P
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .