Chief General Manager (Thermal)
REMOVAL AND RE-ERECTION OF AIR PRE HEATER TUBES IN UNIT-2 & 3 BOILER DURING AOH-2027-28
353118
SLPP/MECH/BLR/APH/U2 AND U3/2027-28
Open
Power/Energy Projects/Products/Services
Works
Surat
₹2,950
Gujarat Industries Power Company Limited
₹70,000
16 Oct 2026
16 Oct 2026
16 Oct 2026
5 Nov 2026
16 Oct 2026
Contract period 12 Months from the date of actual commencement of work
EMD Rs 70,000.00 by RTGS or Demand Draft payable at SBI, Nani
Naroli or Bank Guarantee in favor of GIPCL from approved
Banks mentioned in this tender in subsequent clauses.
Cost of tender document / tender Rs. 2,950.00 by RTGS only in favor of GIPCL payable at SBI,
fee Nani Naroli.
Availability of online e-Tender On website: http://etender.gipcl.com and
https://gipcl.nprocure.com
Downloading of online tender 16/10/2026 to 05/11/2026 up to 17:30 Hours.
document from websites
Last date of online submission of 05/11/2026 up to 17:30 hrs. on website:
Bid https://gipcl.nprocure.com
Submission of EMD, Tender fee On or before last date of online BID submission during office
and other supporting documents hours at Surat Lignite Power Plant, Nani Naroli, Dist. Surat.
for technical Bid in physical form.
E-Reverse Auction Will be informed by GIPCL to all qualified Bidders,
1. Amendment / corrigendum of the tender document, forms, schedules, etc... may be done
any time by the GIPCL during the period of publication of tender in the website. The
Bidders are required to visit the website regularly till the last date & time of Bid
2. GIPCL reserves the right to reject any or all the tenders or split the work among the
Bidders without assigning any reason thereof.
3. The Bidders are required to quote the rate strictly as per the terms and conditions
mentioned in the tender document, adhering to technical specifications as well.
4. The Bidders are required to submit their Bids online only through the website
http://gipcl.nprocure.com/
5. The EMD, Tender fee & other supporting documents are to be submitted in physical form
only at the following address: -
Chief General Manager - (Thermal)
Gujarat Industries Power Company Limited
Surat Lignite Power Plant
At Village: Nani Naroli, Taluka: Mangrol,
Dist.: Surat-394 110, Gujarat.
E-Mail: [email protected]
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
INSTRUCTIONS TO BIDDERS
1. PLANT SYNOPSIS
Gujarat Industries Power Company Limited (GIPCL) (henceforth be named Company/GIPCL), is a
Premier Power Utility in the State of Gujarat with an installed capacity of 1184.4 MW comprising of
various conventional and renewable projects.
GIPCL commissioned its first power project ; a 145 MW gas based combined cycle power plant in
1992 at Vadodara. It expanded its capacity 165 MW Naptha and gas based Combined Cycle Power
Plant at Vadodara in 1997. GIPCL has commissioned 1MWp Distributed Solar Power Projects at
two locations in Gujarat viz. at Village: Amrol, Dist.: Anand and at Village: Vastan, Taluka Mangrol,
Surat Lignite Power Plant (SLPP) with four units of 125 MW capacity each is located at Village: Nani
Naroli, Taluka: Mangrol, District: Surat in Gujarat. GIPCL has also operating its own captive Lignite
and Lime Stone Mines close to the Power Plant. The Power Plant is based on Circulating Fluidized
Bed Combustion (CFBC) technology for the Boilers, where Lignite is burnt along with Lime Stone in
the Combustor of the Boiler.
It commissioned 5 MW solar power station at SLPP in 2012. Also, GIPCL has commissioned 1MWp
Distributed Solar Power Projects at two locations in Gujarat viz. at Village: Amrol, Dist.: Anand and
at Village: Vastan, Taluka Mangrol, Dist.: Surat.
GIPCL has successfully commissioned a 2 x 40 MW Solar Project in 2017 as well as a 75 MW Solar
Power Project in 2019 at Gujarat Solar Park, Village Charanka, Dist.: Patan. GIPCL has also
successfully commissioned 112.4 MW wind farms at different location of Gujarat. The Company has
commissioned the 100 MW Solar Project at the Raghanesda Solar Park, Banaskantha, Gujarat on
The Company has also been allotted land for development of a 2375 MW Renewable Energy Park
at Khavda in the Kutch district of Gujarat.
Surat Lignite Power Plant (SLPP) is accessible by road from Kim and Kosamba, which are on
Mumbai-Ahmadabad highway. From Kosamba, SLPP is around 32 KM, out of which 27 KM is part
of the National & State Highway and balance 5 KM is District Road. From Kim, SLPP is around
KM, out of which 13 KM is the State Highway and balance 5 KM is District Road. The nearest Broad
Gauge Railway Line is at Kim, which is around 21 KM from the SLPP. Surat is approximately 50 KM
from the SLPP. Location Map for SLPP is as under.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
The Company intends to award Contract for Removal and re erection of Air Preheater tubes in Unit-
2 and Unit-3 during annual overhauling 2027-28 of 4 x 125 MW CFBC Units and is therefore inviting
open tenders online through n-procure system from experienced & resourceful contractors.
2. SCOPE OF WORK
2.1 The scope of work broadly covers replacement of tubes of following blocks of TAPH:
Tube size in mm Total nos. of
Sr. No. Unit Description
OD X Length X Thickness tubes.
1 UNIT-2 SA Bottom Block 50.80 X 7090 X 2.08
2 SA Bottom Block 50.80 X 7180 X 2.08
PA Intermediate
4 FBHE module 50.80 X 7180 X 4.50
Total nos. of tubes to be replaced in Unit-2 and Unit-3
* MOC of Tube: ERW Pipe as per ASTM A 423 Gr. A
2.2 Detailed Scope of work for Replacement of tubes.
2.2.1 Mobilization:
• Mobilization of all resources required for the work of APH Tube replacement in
Unit-2 and 3 boilers during overhauling of respective units.
• Mobilization of skilled and unskilled manpower along with necessary tools, tackles
at site well in advance.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
• Contractor shall maintain adequate manpower throughout the execution of work
as per actual work progress so as to complete the work in all respect within the
schedule given in this tender.
• In case overhauling of the both the units are taken at the same time then work in
both units shall be carried out parallelly.
• GIPCL will give intimation regarding commencement of shutdown of the unit at
least 12 days before the date of shutdown. For pre-shutdown activities, contractor
shall mobilize minimum manpower as mentioned hereunder at least 05 days
before the date of commencement of shutdown. The balance manpower required
during shutdown as mentioned hereunder shall be mobilized within two days of
• Contractor shall arrange sufficient numbers of tube expansion machines, welding
generators, gas cutting sets, grinder machines, lifting devices, scaffolding
materials, consumables etc. in good working condition and with back up
arrangement so as to avoid delay due to non-availability of any equipment.
• All the lifting tools and tackles must have valid certifications from Gujarat approved
competent person/agency. All the certificates shall be submitted to GIPCL safety
dept. before commencement of the work. Use of lifting tools and tackles without
submitting valid certificate to GIPCL safety dept. is strictly prohibited.
• All the electrical appliances/machines must equip with tested ELCB and without
broken wires/jointed wires etc.
• Contractor has to ensure the medical check up of their all workmen at GIPCL OHC
before engaging them in to the work.
2.2.2 Pre-shutdown activity:
• Minimum manpower to be deputed for pre-shutdown activities for each unit shall
be strictly as per following.
Minimum Manpower Deputation for Pre-shutdown Activities for each unit
Sr. NO. Category Nos. of Manpower
1 Site In charge
2 Site Supervisor
Total Minimum Manpower
Pre-shutdown activities include.
a) Erection of necessary scaffolding/platform for cutting and removal of duct as per
the requirement for accessing the tubes for removal and insertion.
b) Removal of insulation with cladding from duct.
c) Shifting of APH tubes from GIPCL warehouse to site.
d) Proper lighting arrangements for illumination. Please note that for working
inside duct, only 24 V lighting fixtures is allowed.
e) Proper industrial grade extension board with ELCB protection shall be used for
connecting hand tools / equipment.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
f) Contractor has to arrange for checking of all electrical hand tools / equipment by
GIPCL Elect. Dept. before use. Any hand tools / equipment found in use without
checking by GIPCL Elect. Dept will be seized.
g) Pre-shutdown activities shall be essentially completed before commencement of
AOH of respective unit as per instruction of EIC.
Note: Ensure isolation and permit to work from EIC every day before starting the work and
strictly follows the safety rules and ensure use of required PPE’s while working at site.
2.2.3 Activities during Shutdown:
• Minimum Manpower to be deputed per TAPH block for shutdown activities of
APH Tube replacement work shall be strictly as per following.
Minimum Manpower Deputation per TAPH block for Shutdown Activities
Sr. No. Category Nos. of manpower Remark
1 Site In charge 1 no. One Site in-charge per unit per day
2 Site Supervisor 2 Nos. (1 for each shift) (2X12 hrs Shift)
3 Mech. Fitter 2 Nos. (1 for each shift)
4 Rigger 4 Nos. (2 for each shift)
5 Helper 20 Nos. (10 for each shift)
6 Gas Cutters 14 Nos. (7 for each shift) Shall be arranged during tubes cutting
and duct cutting work
7 Welders 12 Nos. (6 for each shift) Shall be arranged during tube welding
and duct welding work
8 Expanders 8 Nos. (4 for each shift) Shall be arranged during tube
• Contractor shall timely mobilize Minimum Manpower with requisite skill,
experience and knowledge of the work as indicated hereabove. Deployment of
manpower shall be within two days after commencement of shutdown as per
intimation given by GIPCL.
• Contractor shall execute the work strictly on round the clock basis in 2X12
Important Note:
1. The schedule of manpower deployment will be decided jointly after award of work order
and before AOH of respective unit. Contractor has to ensure manpower deployment
as per agreed schedule.
2. The manpower indicated hereabove (and as per Annexure-A) shall be minimum
manpower, which is to be mobilized at site and work shall be executed on round the
clock basis (2X12 hr shift) as per above minimum manpower allocation. It is to be noted
that deputation of above referred manpower does not relieve contractor from his
responsibility of completing the work within prescribed time schedule in all respect.
3. If actual work progress as well as deputed manpower is not adequate to match the
schedule, then in such case, contractor has to augment additional required manpower
so as to complete the work within prescribed schedule without any delay.
4. It will be sole responsibility of contractor to complete the work within prescribed
schedule without any delay. GIPCL reserves the right to take suitable actions in line
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
with terms and conditions of tender / work order in case contractor fails to take
necessary actions to make up the delay OR not responding to GIPCL's instruction in
this regard. This will be treated as failure of contractor to perform and GIPCL reserves
right to get the balance work done with other available agency at the risk and cost of
contractors as per terms and condition of the tender.
Bidder shall submit Annexure -A (given in Section-F of this Tender document)
duly signed and stamped as a token of acceptance of all the terms and conditions.
• Detailed work activities:
a) Cutting of the ducts to create access for tube removal and insertion.
( i ) For Unit-2 SA Bottom block – Cutting and welding of SA Air duct of Approx. Size
11.0 mtr X 3.0 meter – (One layer), PA Duct of Approx. Size 11.0mtr X 3.0 meter –
(Two layer) and Back pass duct – as required with Approx. Size 11.0mtr X 3.0 meter
– (One layer) all at Approx. 17 -meter elevation. All related fabrication work for making
platform shall be in bidder’s scope. Alternatively, tube replacement work will be
allowed by cutting of center baffle plates at flue gas path. (Without cutting of SA, PA
and back pass duct plates). In this case accurate cutting and re-welding of baffle plate
will be required at each and every tube location and both side of the baffle plates.
Contractor has to made arrangement for platform to rest the above ducts plates as
well as stacking of tubes in above both case.
In above both options, opening in flue gas side casing plates need to be cut of
sufficient size to enable removal the old tubes as well as insertion of new tubes for
alternate option.
(ii) For Unit-3 SA Bottom block – Cutting and welding of SA Air duct of Approx. Size
12.00 mtr X 3.00 meter – (One layer), PA Duct of Approx. Size 12.00 mtr X 3.00 meter
– (Two layer) and Back pass duct – as required with Approx. Size 12.00 mtr X
meter – (One layer) all at approx.18 - meter elevation. All related fabrication work for
making platform shall be in bidder’s scope. Contractor has to made arrangement for
platform to rest the above ducts plates as well as stacking of tubes
( iii ) For Unit-3 PA Intermediate block – Cutting and welding of PA Air duct of Approx.
Size 12.00 mtr X 3.00 meter – (One layer) at approx. 26 -meter elevation., All related
fabrication work for making platform shall be in bidder’s scope. Contractor has to
made arrangement for platform to rest the above duct plates as well as stacking of
( iv ) For Unit-3 FBHE-4 Module tubes – Cutting and welding of FBHE Air duct of
Approx. Size 3.0mtr X 3.0 meter – (One layer) at 30.00-meter elevation. Contractor
has to made arrangement for platform to rest the above duct plate as well as stacking
of tubes. All related fabrication work for making platform shall be in bidder’s scope.
Also opening in flue gas side casing plates need to be cut of sufficient size to enable
removal the old tubes and insertion of the new tubes. The old tubes are in coil design
(U-tubes). These tubes to be removed by cutting. After cutting of the tubes new
straight tubes to be installed and all the tubes shall be welded with tube sheet at both
ends. (Total 600 joints) The air Duct at rear side shall be fabricated with similar design
at front side duct and as per instruction of EIC. (Approx. Fabrication in MT is 2.00 MT)
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
• Locking and unlocking of duct MEJ to be done as per site work requirement during
cutting of the ducts.
• If bidder decides to engage suitable crane for lifting of tube bundles and other
materials, the hiring of crane shall be in bidder’s scope.
• Bidders are requested to visit the site to understand the exact location of
block and arrangement required for replacement of the tubes of respective
blocks and FBHE module.
b) Erection of the scaffolding with require railing and supports and making a proper and safe
arrangement to execute the tube replacement work for respective blocks.
c) Temporary sheltering shall be provided as per requirement to enable parallel working in
d) Lifting of APH tubes from ground floor to the required height depending upon the location
of APH Block. Contractor shall have to make his own arrangement for lifting device as
per suitability of site. Contractor has to prepare safe platform for stack up the tubes at
respective block for ease of insertion. (Required steel for making platform will be issued
e) As this is CFBC boiler with primary fuel of lignite and limestone addition is done to remove
sulfur from flue gas, chocking of fly ash in APH tubes observed in the form of hard/loose
condition. Normally 20 to 30% of flue path area observed with chocking depending up on
the location of the block. Contractor has to arrange to remove the chock up for cutting of
the tubes. Bidders are advised to visit the site for understanding nature of chocking and
any type of clarification in this regard before participating in the bid.
f) Cut and remove all the tubes of PA /SA blocks without damaging the tube sheet/tube
sheet holes and stack at scrap yard as per the direction of EIC. (Tube may be cut using
gas cutting set). GIPCL will not allow use of LPG cylinder for gas cutting. All the
scrap tubes to be sent for weighing at weigh bridge and then stack at scrap yard as pe
instruction of EIC. Contractor has to submit all the weighment slips for scrap disposal to
g) Repairing / replacement of the Tube sheet of both sides. Due to insertion of dummy and
replacement of the tubes in past, some of the tube sheet holes are damaged, which are
to be repaired before tube insertion. If expansion of tube with such damaged holes is not
possible, then welding shall be done to ensure leak proof joint as per instruction of EIC.
Also, welding of tube needs to be done in top, bottom and adjacent column of partition
plates tubes where expansion is not possible due to space constrain. The Approximate
welding to be carried out at tube to tube sheet is as per detail mentioned here under.
Sr. No. Block Approx. nos. of tubes to be welded
1 Unit-2 SA Bottom Block 1200 nos.
2 Unit-3 SA Bottom Block 1200 nos.
3 Unit-3 PA Intermediate 1000 nos.
4 Unit-3 FBHE Module 300 nos.
Note: Above mentioned quantum of tube welding is indicative only. Actual nos. of the
tubes required to be welded may increase or decrease depending on actual
condition. GIPCL will not entertain any additional claim on account of change
in welding of number of APH tubes. Bidder has to carry out welding of all the
tubes as per actual work requirement. Welding shall be done using E6013
electrodes of 2.5 mm dia. Acceptable make of electrode shall be Ador, ESAB, D&H
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
h) Clean all the tube-holes in tube plate and repair the tube sheet plate, if required.
i) Flue gas side – TAPH tubes support plate (Baffle plate) Straightness to be checked and
corrected, if required. Also, repairing of partition plate (3nos.) if required in each block.
j) Removal and re-insertion of diverter plate provided in the inner side of APH Block at air
side as per requirement.
k) You have to offer inspection of APH block after completion of removal of tubes and all
preparatory work and take clearance form GIPCL EIC for insertion of new tubes.
l) Insertion of new tubes shall be done in sequential manner without damaging the tubes.
m) After insertion, expand the tube at both ends so as to ensure leak proof joint.
n) To ascertain the correct expanding torque, you have to carry out mock test in presence
of EIC and ensure the required torque for complete and adequate expansion of tubes.
Wherever tube holes are uneven then welding shall be done to ensure leak proof joint.
o) After completion of tube expansion, ensure the leak-proof joint by suitable test.
p) Re-erection and fit up of all duct walls, which are previously cut for tube replacement and
full welding of the same. Two runs of welding shall be applied on each side of duct walls.
In case old ducts plates are damaged and not usable, fabrication, fit up and full welding
of new plate as per original arrangement and as per instruction of EIC.
q) All the inside stiffeners (wall to wall) and partition plates of the ducts shall be restored as
per original arrangement with full welding. If required additional stiffeners shall be
provided for sufficient strengthening of the duct as per instruction of EIC.
r) All the outside stiffeners of the ducts shall be restored as per original arrangement. If
required additional stiffeners shall be provided for sufficient strengthening of the duct as
per instruction of EIC.
s) Approximate quantum of additional strengthening work shall be – 4 to 5 MT per block
based on site requirement.
t) All the welding work (except tube joints) shall be carried out with E-7018 electrode with
proper pre-heating of electrode in oven and following all standard engineering practices
required for quality welding. Acceptable make of welding electrode Shall be ADOR,
u) All the welders deployed for the work shall be qualified and well experienced for structural
welding work to ensure welding quality.
v) Tube leak test and duct pressure test (on no load and with full load of unit) will be carried
out after completion of tube replacement work. All the defects identified during tube leak
test and duct pressure test shall be attended immediately as per the instruction of the
EIC. It is contractor’s sole responsibility to demonstrate healthiness of the ducts without
any bulging or leakage up to full load operation of unit and as per satisfaction of EIC.
w) Application of insulation and cladding sheet on all the ducts as per original arrangement.
x) Removal of all scaffoldings and temporary platforms as per instruction of EIC.
y) Removal of all scraps and debris and ensure cleaning of site (i.e. all working platforms
as well as ground level). All Scraps (Old tubes, insulation, damaged cladding sheets,
packing material, damaged duct parts etc.) shall be disposed at designated location at
scrap yard after proper weighment of all the scrape. Weighment slips for scrap disposal
shall be submitted to EIC. Loading/unloading of scrap and vehicle for shifting of the
scraps shall be in contractor’s scope. Insulations material required to be disposed at
designated site in mines area which is approximately 6 KM from plant area.
z) If any fabrication related requirement arises for replacement of the tubes then it is in the
scope of contractor.
aa) Removal of any obstructions observed during the tube replacement work shall be in the
scope of contractor.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
The scope of work mentioned hereabove is neither exhaustive nor limited to above
mentioned activities only. Any job / activity, which is necessary for satisfactory
completion of above-mentioned APH Tube replacement work shall be part of scope of
work of this tender.
Bidders are requested to visit the site to assess quantum of work, site conditions,
approach available for work, pre-shutdown arrangements needed and for any further
clarification for this job before participating in bid.
2.3 The bid submitted by the bidder not covering the total scope of work and services as detailed
out in the tender document shall be liable for rejection.
2.4 Quantum of job mentioned against all items in the price bid are indicative only & may vary
as per site requirement & not to be construed as maximum or guaranteed quantity. The
quantities shown in the price bid are approximate quantities for the contract period and they
may vary as per job requirements.
2.5 All the miscellaneous activities pertaining to specific work to be executed for satisfactory
performance is in the scope of contractor in his quoted rates.
3. GENERAL INSTRUCTIONS
3.1 The Bidders who are interested in participating in the tender must read and comply with
the instructions and the terms and conditions contained in the tender documents.
3.2 The bids shall be filled in by the bidder clearly, neatly and accurately. Any alteration,
erasures or over-writing would be liable to make the tender invalid unless the same is
neatly carried out and attested over the full signature of bidder. The decision of the
Company to interpret the information and rates filled in by the bidder shall be final and
binding on the bidder.
3.3 The Bidders are requested to make themselves fully conversant with the General
Conditions of Contract, Special Conditions of Contract, Technical Specifications, site
conditions, safety and health aspects and norms to be observed, etc. while submitting their
bids so that no ambiguity arises in these respects subsequent to submission of the Bids.
3.4 Before quoting the rates, the Bidder should go through the specifications, scope of work
etc. and get himself fully conversant with them. The bid should include cost of mobilization
and cost to adhere to all safety norms as described in the tender. No relaxation or request
for revision of quoted/accepted rates shall be entertained subsequent to the opening of bid
on account of mobilization or Safety costs.
3.5 Bidder has to submit all the information and details required in the bid document. Failure
to furnish all the information as per required bid documents or submission of a bid
containing deviations from the contractual terms and conditions, specifications and
requirements shall be rejected.
3.6 The bids shall be submitted within the time frames set out in the Notice Inviting Tender
(‘NIT’) and bids submitted thereafter shall not be accepted and considered.
3.7 The tender documents shall not be transferable.
3.8 The Bidders are expected to examine all instructions, forms, terms and specifications in
the bid documents and to get fully acquainted themselves with all the conditions and
matters which may affect the subject matter of the work/tender or the cost thereof. If any
Bidder finds any discrepancies or omissions in the specifications and documents or any
doubt in true meaning or interpretation of any part, he shall seek necessary clarifications
in writing or during pre-bid meeting if required.
3.9 Conditional offers shall not be considered and liable to be rejected.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
3.10 The Company reserves the right to extend the deadlines for submission of the bids by
giving amendments.
3.11 During evaluation of bids the Company may, at its discretion ask the bidder (s) for
clarification of their bid. The request for clarification and the response shall be in writing
and no change in prices or substance of the bid shall be sought, offered or permitted.
3.12 The Company reserves the right to amend/ modify the bidding documents at any time prior
to the deadline for submission of bids, either at its own discretion or in response to the
clarification requested by a prospective Bidder. In such case, the Company may in its
discretion extend the deadline for submission of bids in order to facilitate the prospective
Bidders for incorporating the effect of the amendment in their bids.
3.13 The Bidders shall bear all costs and expenses associated with the preparation and
submission of their respective bids, to attend meetings or conferences, if any, including
any pre award discussion with the successful Bidder, technical and other presentations,
etc. and the Company shall not be liable for any expense thereof.
3.14 If the successful Bidder is a joint venture, formed of two or more companies, the bidder
along with the partners shall accept joint and several responsibilities and liabilities for all
obligations under the Contract.
3.15 Timely and satisfactory completion of the work and strict adherence to the allotted time
frames for jobs shall be the essence of the contract.
3.16 The Company reserves the right to qualify/disqualify any applicant without assigning any
3.17 The Bidder shall be disqualified if any untrue statement or misrepresentation is made in
the bid forms, attachments and other supporting documents submitted by the Bidder.
It is advisable for all interested bidders to visit the site/plant after downloading the tender copy
to understand the actual working conditions, compliance related to labour, safety etc. before
submitting their offer. Failing which, any consequential liabilities arising will be to bidder’s
account. The bidders shall examine the site of works and its surroundings at his own
responsibility. The bidders shall collect information that may be necessary for preparing the bid
and entering into a contract. All costs and liabilities arising out of the site visit shall be at bidder’s
The bidder is deemed to have examined and understood the tender document, obtained his own
information in all matters whatsoever that might affect the carrying out the works expressly
mentioned or works which may have to be carried out to fulfill his contractual obligation within
the scheduled rates and to have satisfied himself to the sufficiency for his offer.
The submission of tender by a contractor implies that he has visited the site and read these
instructions, conditions of the contract etc. and has himself aware of the scope, nature of works
& specifications of the works to be done, General & Special Terms and Condition. GIPCL will
not, therefore after acceptance of contractor’s rate, pay any extra charges for any other reason
in case the contractor is found later on to have misjudged the site conditions.
Any error in description or quantity or omission in the contract document shall not vitiate the
contract or release the contractor from executing the work comprised in the contract according
to scope of works, magnitude of the works, requirement of materials, equipment, tools& tackles,
labour, etc. Contractor has to complete the work in accordance with the contract documents
irrespective of any defects, omissions or errors that may be found in the contract documents.
BIDDER shall inspect the site, examine and obtain all information required and satisfy himself
regarding matters such as access to site, communication, transport, working condition including
constraint of work place, confined area, quantum of dusting, running equipment, importance of
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
work, round the clock working conditions, safety requirements, temperature of fresh drained hot
bed material and associated risks, right of way, high flood level in River, flow of water during
monsoon/dry season in the River/Nallah, the type and number of equipment and facilities
required for the satisfactory completion of work, the quantity of various items of the work, the
availability of local labour, availability and rates of material, local working conditions,
uncertainties of weather, obstructions and hindrances that may arise, etc which may affect the
work or cost thereof, before submission of his Bid. Ignorance of site conditions shall not be
accepted by the GIPCL as basis for any claim for compensation
The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the Engineer.
5. ELIGIBILITY CRITERIA
The following criteria will be adopted for qualifying the Bidders for consideration of the Bid for
the further proceeding.
1. Bidder should possess minimum three years (03) of experience during last seven (07) years
in similar nature of jobs - for the replacement of TAPH tubes in CFBC/PF boiler (lignite or
coal fired boiler) with capacity of 70 MW and above. Proof to be attached.
2. Bidder should produce evidence of having experience of successfully completed identical
nature of works as defined hereunder during last seven (07) years ending last day of the
month previous to the one in which tender is invited, satisfactory progress of ongoing works
etc. along with certified copies of documentary evidence preferably photo copies of work
experience from the clients. The experience should be either of the following:
Bidder should have executed minimum
A. One work of identical nature, each costing not less than Rs. 41.73 Lakh excluding GST.
B. Two work of identical nature, each costing not less than Rs. 27.82 Lakh excluding GST.
C. Three work of identical nature, each costing not less than Rs. 20.86 Lakh excluding GST.
Bidder should specifically mention fulfilling of above criteria in his offer along with details of work
orders & work completion certificates issued by clients.
3. Tender fee: The tender fee shall be paid through online mode in form of RTGS only.
4. EMD: The EMD shall be accompanied in the form of DD/RTGS or Bank Guarantee given
by Bank as described in subsequent clause no.
5. Bidder shall submit Annexure – A regarding terms and conditions duly stamped and signed.
6. Bidder should have separate Employees Provident Fund code number towards registration
of firm with RPF commissioner.
7. The bidders worked at GIPCL-SLPP in the past but performance of work not found
satisfactory or failed to perform as per scope of work and terms and conditions of work order
then in such case GIPCL reserves the right to reject the bid and such bidders shall not be
allowed to participate in the bidding process. GIPCL’s decision will be final in this regard.
8. Attested copies of relevant documents duly signed & seal on each & every page shall be
submitted. GIPCL may verify the documents, experience certificates issued by concern
authority. After opening of technical Bid, if any required attested documents found missing
in the Technical Bid submitted by the Bidder, the tender inviting authority may inform to that
Bidder by E-mail to submit the missing required documents within stipulated time limit. If
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Bidder/Bidders fail to submit within stipulated time, their Bid will be declared technically
disqualified and no further correspondence will be entertained.
9. Bidder should have average annual turnover of Rs. 20.86 lakh during last three financial
years (2023-24, 2024-25 & 2025-26). Bidder shall furnish annual audited financial statement
duly certified by/froma qualified Chartered Accountant, being a member of the institute of
chartered accountants of India for the last three financial years to demonstrate the financial
healthiness of the company. The balance Sheet AND Profit and Loss Account must be in
the name of the company. Any type of MOU for this purpose will not be entertained.
10. The Bidder has to submit INCOME TAX Permanent Account Number (PAN), & GST
registration number. Copies of the same shall be submitted.
11. The net worth of the bidder should be positive as evidenced from audited accounts of last
financial year. (F.Y.:2025-26)
12. In case Bidder is a Consortium/Joint deed of undertaking of company, the above
requirements/credential of consortium leader/bidder shall be considered unless otherwise
specifically mentioned in the tender.
13. If Bidder or its Partner(s) or Director(s) is /are/was Black Listed / Deregistered / Stopped or
banned from dealing in the past by any Govt, of Gujarat Undertakings / Depts. / Authorities
and Govt. of Gujarat supported companies / undertakings / organizations, Bid of that party
may be liable to be rejected. Bidder agrees and undertakes to accept decision of GIPCL in
this regards as final and binding on the Bidder without any demur and that no further
correspondence shall be done in this regard at any stage. Bidder shall have to submit
“Declaration for Contractual Litigations” as amended in Annexure / Form attached.
14. Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of Safety
Laws and Regulations” as amended in Annexure-F attached.
• If any Major Violation of any safety law(s) / Rule(s) is / are found during the. Preceding
Three (3) years, Bid of that party will be liable to be rejected. Bidder agrees and undertakes
to accept decision of GIPCL in this regards as final and binding on the Bidder without any
demur and that no further correspondence shall be done in this regard at any stage.
• If any of the details submitted in the prescribed Annexure / Form to the Bid is/are found to
be false, incorrect at any time in future, then the Contract awarded to that Bidder / Contractor
shall be liable to be terminated forthwith without any notice / correspondence and Bidder
agrees and undertakes to accept decision of GIPCL in this regards as final and binding on
the Bidder without any demur and that no further correspondence shall be done in this
regard at any stage. Further, Performance / Security Deposit will also be liable to be
forfeited. Any dues to GIPCL from the Bidder / Contractor shall be recovered from the
pending bills or any other dues payable to the Bidder / Contractor, if any or otherwise
through any other recourse available under the Laws.
The Bidder shall submit all the evidences, documents, attested copies of work orders &
work completion certificates etc… as a proof with EMD &Tender Fee and also provide the
requisite details online for meeting the prequalification requirements. GIPCL will verify the
experience, performance, capability & strength of Bidders, independently for executing the
job. GIPCL may visit the site & consult the owner of the industry/property where similar job
is executed by the Bidder. GIPCL reserves the right to accept/cancel/reject any/all Bids
without assigning any reason thereof. The tenders of qualified Bidder/Bidders shall only be
considered for further evaluation.
7.LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to the Bid
exchanged by the Bidder and the Company, shall be written in the English language. Any
printed literature furnished by the Bidder, written in another language shall be accompanied
by an English translation for the purpose of interpretation of the Bid.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
8.TENDER FEE AND EARNEST MONEY DEPOSIT (EMD)
8.1 An EMD of Rs. 70,000/-and Non refundable Tender fee Rs. 2,950/- (Rupees Two
thousand nine hundred fifty only) shall accompany with Bid. Tender fee shall be
submitted through RTGS only in favor of Gujarat Industries Power Company
8.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in
favor of Gujarat Industries Power Company Limited from any Schedule Public
Sector Bank or Schedule Private Sector Bank as per Performa of BG enclosed
with this e-tender.
8.3 Alternatively, The EMD & Tender Fee may also be submitted through RTGS/online
mode of payment by the bidders as per the details given below:-
Name of account holder: Gujarat Industries Power Company Limited
• Name of Bank: State Bank of India
• Address of Bank: Utility Building, Nani Naroli, Taluka Mangrol,Dist. Surat.
• IFSC code: SBIN0013423
8.4 In case EMD is paid in the form of BG, the same shall be valid for a period of
days after the due date for submission of the bid.
8.5 The EMD of the successful bidder will be returned after payment of Security Deposit
by successful bidder.
8.6 The earnest money deposit will be refunded to the unsuccessful BIDDER as soon
as the tender is finalized and after award of LOI/Work Order.
8.7 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees
and EMD should be submitted to GIPCL.
8.8 No interest shall be payable on EMD.
8.9 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance
or (ii) withdraws his tender before the validity date of the tender.
8.10 SCHEDULE OF EMD:
EMD &Tender fee and Address for Submission:
other documents dully CGM – (Thermal)
signed to be submitted in GUJARAT INDUSTRIES POWER CO. LTD.,
physical form On or before (Surat Lignite Power Plant)
last date of online BID Village – Nani Naroli, Taluka – Mangrol
submission during office District – Surat 394 110, Gujarat
hours at Surat Lignite Phone : 02629-261063 (10 lines)
Power Plant, Nani Naroli, Fax : (02629) 261073 /
Dist. Surat. e-mail: [email protected]
9. SUBMISSION OF BIDS
A: MODE OF SUBMISSION
The bids shall be submitted online at the GIPCL e-portal within the dates specified in the
NIT along with the details of tender fees and EMD in two parts as under:
(a) Techno-commercial Bid without price.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Note: Tender fee and EMD shall be submitted in physical form with clearly mentioned
BID No.: SLPP/MECH/BLR/APH/U2 AND U3/2027-28 for ‘’Removal and re-
erection of Air Preheater tubes in Unit-2 and 3 during annual overhauling
(a) Techno-commercial Bid without price:
The tender document duly signed in all pages without price bid along with
Techno-commercial deviations, if any, shall accompany the bid. The following
Information shall be provided in the techno commercial bid:
1. Details of Eligibility Criteria as per attached annexure-I
2. Schedule of deviation (Annexure-J) Technical as well as commercial, if any.
3. Annexure – A
The following supporting documents shall also be submitted along with EMD & Tender
Fee in physical form:
1. The tender documents dully signed in all pages without price bid along with techno-
commercial deviations, if any.
2. Proof of experience meeting the minimum eligibility criteria
3. Performance certificate issued by clients.
4. Previous work order copies.
5. Details of present work order (if any)
6. Turn over for the last three years, audited annual accounts/financial statements i.e.
profit and loss account and balance sheet duly certified by a practicing CA will be
required as per Annexure-I.
7. P.F Number and Allotment Letter.
9. GST registration number/certificate copy.
1. Price Bid shall be submitted only in soft form through e- portal system.
Note: Estimate includes cost of all manpower, supervision, equipments,
vehicles, consumables, tools & tackles, transportation, Safety statutory
compliance, mobilization etc...
2. Goods &Service tax shall be paid extra at actual as per prevailing rates as declared
by Central Government on submission of documentary evidence.
3. The quantities shown in the price Bid are approximate for the contract period and
may vary as per job requirement.
4. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
5. The Bidder shall fill the Bid documents with utmost care in consonance with the
instructions contained in the Bid documents.
B: METHOD OF TENDERING/SIGNATURE ON BIDS
(i) The Bid must contain the postal address like name, residence and place of business
of the person or persons submitting the Bid and must be signed and sealed by the
Bidder with his usual signature. The name of all persons signing the documents shall
also be typed or printed below the signature on each page.
(ii) Bid by a joint venture/partnership firm must be furnished with full names of all
partners and be signed with the partnership name, followed by the signature and
designation of one of the authorized partners or other authorized representative(s).
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
A certified copy of the power of attorney authorizing such partner or representative
shall also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the
Corporation/Company i.e. by the President/Managing Director/Secretary or other
person or persons authorized to Bid on behalf of such Corporation/Company. A
certified copy of the board resolution/power of attorney authorizing such partner or
representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the firm.
(v) Erasures or other changes in the Bid Documents shall be initialed by the person
signing the Bid.
(vi) Bids not conforming to the above requirements of signing shall be disqualified.
10. MODIFICATION AND WITHDRAWAL OF BIDS
a. The Bidder may modify or withdraw the bid prior to the deadline prescribed for
submission of bids.
b. No Bid shall be modified subsequent to the deadline for submission of Bids.
c. No Bid shall be withdrawn in the interval between the deadline for submission of Bids
and the expiration of the period of bid validity.
11. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the bid
and till official intimation of award/rejection made by the Company to the Bidders.
b. While the Bids are under consideration, Bidders and / or their representative or other
interested parties are advised to refrain from contacting by any means, the Company.
The Engineer, if necessary, will obtain clarifications on the Bids by requesting for
such information from any or all the Bidders, in writing as may be necessary. The
Bidder will not be permitted to change the price or substance of the Bid after the Bid
has been opened.
12. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and eighty
(180) calendar days from the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications shall
constitute an agreement that the Bidder shall have no cause of action or claim,
against the Company for rejection of his Bid. The Company shall always be at liberty
to reject or accept any Bid or Bids at his sole discretion and any action will not be
called into question and the Bidder shall have no claim in that regard against the
13. OPENING OF BIDS
13.1 The GIPCL will open the Technical Bid/price Bid, as the case may be, in presence
of Bidder's representatives whenever such a procedure has been specified.
Otherwise the tender will be opened by the authorized officers of GIPCL.
13.2 Preliminary Examination:
13.2.1The Company will examine the Bids for any computational errors, for sureties
furnished by bidder, for authentication of documents submitted and completeness
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
13.2.2 Arithmetical errors will be rectified on the following basis:
(a) If there is a discrepancy between the unit price and the total price that is obtained
by multiplying the unit price and quantity, the unit price shall prevail and the total
price will be corrected & will be binding to the bidders
(b) If there is a discrepancy between the Total Bid Amount and the sum of total prices,
the sum of total prices shall prevail and the Total Bid Amount will be corrected &
will be binding to the bidders.
14. EVALUATION & COMPARISON OF BIDS
14.1 GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest
evaluated Bid in conformity with the specifications of the tender documents.
14.2 The Technical Bids will be examined for minor matters regarding qualification of
bids. Subsequent to correspondence with the respective bidders, the decision of
Tender Committee will be final.
14.3 All responses to requests for clarifications shall be in writing and shall be presented
to the Company through e-mail or in a sealed envelope on or before the given date
requested by the Company. If the Technical clarifications sought by the Company
do not reach the Company on or before due date, the Bid will be rejected.
14.4 The comparison of all the Bids shall be carried out with reference to the scope of
work as per the technical specification. Any deviation/omission shall be evaluated
at highest quoted price of the deviation/omission quoted by any of the Bidder. In
case a separate price (for omission) is not given by any other Bidder, a reasonable
price of the same shall be taken & the same shall be binding to the Bidders.
14.5 The commercial deviation, if any, shall be loaded to bring all the Bids at par. The
loading shall be carried out at an interest rate of 2% above PLR of SBI.
14.6 A Bid to be substantially responsive shall be one which on evaluation confirms to
all the terms, conditions and specifications of the Bid documents without any
material deviation or reservation.
14.7 For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of the
(b) Which limits in any substantial way and in a manner inconsistent with the Bid
documents, GIPCL’s right or the Bidder’s obligations, under the contract, or
(c) Whose rectification would affect unfairly the competitive position of other
Bidders presenting substantially responsive Bids.
15. RIGHT OF REJECTION OF TENDERS
15.1 GIPCL reserves the right to accept or reject any Bid or to cancel the Bidding process
and reject all Bids at any time prior to award of contract, without thereby incurring
any liability to the affected Bidder or Bidders or any obligation to inform the affected
Bidder or Bidders regarding the same.
15.2 Any Tender without EMD and Tender fee will be treated as non responsive and
shall be rejected at the outset & no further correspondence shall be entertained
regarding this.
15.3 GIPCL reserves the right to debar any Bidder from participation in future Bids if
such Bidder has quoted an abnormally low rate in the Bid document/price Bid.
15.4 The bidders worked at GIPCL-SLPP in the past but performance of work not found
satisfactory or failed to perform as per scope of work and terms and conditions of
work order then in such case GIPCL reserves the right to reject the bid and such
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
bidders shall not be allowed to participate in the bidding process. Decision of GIPCL
would be final for deciding about poor performance in execution of such past
16. AWARD OF CONTRACT
16.1 GIPCL will award the contract to that bidder whose quotation has been
determined to be substantially responsive and evaluated as the lowest quotation in
conformity with the requirements of the specifications and documents contained
herein, provided further that the bidder is determined and evaluated to be qualified
to perform the contract satisfactorily.
16.2 The successful bidder shall be intimated of his selection through the Letter of Intent
or Letter of Award/ Work Order which shall be sent to him through e-mail, courier,
fax or registered mail.
16.3 GIPCL reserves the right to cancel/short close the contract (with notice period of
Fifteen days) during the contract period without assigning any reason.
16.4 GIPCL reserves the right to split the contract quantity between vendors
17. CONTRACT PERIOD & COMPLETION SCHEDULE :
17.1 The contract will be for a period of one year from the date of actual Commencement of
operation of the contract as stated in the Work Order (‘Contract Period’).
17.2 GIPCL reserves the right to extend the Contract Period up to three months on the same
rates and terms and conditions without any price escalation and entering into any new
17.3 The said Contract Period can be extended if mutually agreed upon by both the parties up
to one year and in such a case a revised work order shall be issued at the same rates and
terms & condition or at negotiated rates acceptable by both parties i.e. the Company & the
COMPLETION SCHEDULE :
Schedule for completion of job is as below:
• For Unit-2: Work shall be completed within 19 calendar Days for Unit-2 SA bottom
block from the date of handing over of work front and APH block shall be offered for Air leak
test for tubes and duct pressure test at no load of unit.
• For Unit-3: Work shall be completed within 22 calendar Days for Unit-3 SA bottom,
PA intermediate block and FBHE-4 module tubes from the date of handing over of work
front and APH block shall be offered for Air leak test for tubes and duct pressure test at no
• Any observations/ corrections required as per air leak test shall be attended within one day
period as per instruction of EIC.
• As per above, all work shall be completed in all respect within 20 days time for Unit-2 and
within 23 days time for Unit-3 including correction time. Any delay in completion of work
beyond above time limit will attract liquidated damages as per Clause No. 18 hereunder.
• Contractor has to arrange sufficient manpower to carry out the tube replacement work
round-the-clock basis. (in 2 shifts of 12 hours)
• The pre-shutdown activity period is excluded from above completion time.
• The said work shall be carried out in Unit-2 and Unit- 3 boiler during annual overhaul planned
tentatively in between the month of June– 2027 to Dec -2027. However, it may differ
depending upon actual requirement of site.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
• The basic considerations and the essence of the ‘contract’ shall be the strict adherence to
the time schedule for performing the specified ‘works’. Contractor has to mobilize required
number of manpower along with necessary tools, tackles, PPEs.
• In case of delay in executing the contract by contractor, GIPCL reserves the right to engage
another contractor and complete the balance job at the risk and cost of the contractor.
• In case of delay in execution of work by contractor and contractor is not able to augment
manpower / resources to make up the delay, GIPCL reserves the right to deploy additional
manpower and resources of third party engaged by GIPCL at RISK and COST of the
contractor to avoid generation loss on account of delay in work.
• In such condition, Contractor shall have to cooperate and agree to deploy the manpower /
resources as proposed by GIPCL and get the work done from such additional manpower and
resources. Contractor shall have to engage the additional manpower and resources along
with his own manpower in such a manner that work can be completed in least possible time
to make up the delay.
• Contractor shall also have to accept the cost / rates as given by GIPCL ( either as per
GIPCL’s respective work order /ARC or as per rates claimed by third party ) and the same
shall be binding to contractor. Actual cost for deployment of such additional manpower and
resources shall be recovered from the invoice of contractor along with 10 % overhead
• GIPCL Shall carried out certification of the manpower and resources deployed by third party
and it will be considered for recovery as mentioned above and contractor shall have to accept
• The additional manpower deployed by GIPCL shall be at sole discretion of GIPCL. However,
such manpower shall work under direct control and supervision of contractor. It will be sole
responsibility of contractor to get the work done and ensure the quality of work as per tender
• Deployment of additional manpower and resources by third party through GIPCL is only to
expedite the work to reduce generation loss and GIPCL does not take any guarantee for skill
/ quality of manpower. GIPCL will not entertain any issues regarding quality of manpower,
their work output and recovery of cost by GIPCL.
• Deployment of additional manpower and resources of by third party through GIPCL does not
absolve contractor from his responsibility to complete the work in all respect as per tender
specification and execution of work will be sole responsibility of contractor only.
18. Liquidated Damage (L.D.) –
• Completion time is the essence of the Contract.
• In the event of contractor fails to complete the entire job within 20 days for Unit-2
and within 23 days for Unit-3 (Including air leak test) as indicated in Clause No.17
hereabove, LD of 3.00% of Executed work value (Including GST) will be deducted
from bills for each day delayed beyond the prescribed time schedule. However, the
total amount of the LD shall not exceed 15.00% of the executed value (Including
total amount of the LD shall not exceed 15.00% of the executed value (Including
• If the contractor has not performed as per the terms and condition of the work
order/tender and fails to complete the work in prescribed time limit and if overall
delay in the work of respective unit is more than five days, such contractor will be
debarred from the future tender participation at GIPCL for three (03) years of the
period from the date of execution of work of respective units.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
19. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILITY OF MANPOWER
1. The Contractor shall deploy suitably qualified and sufficient manpower for timely &
satisfactorily execution of the works under the contract.
2. The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled manpower
separately to properly complete the job in given/scheduled time.
3. The Contractor shall depute its own workmen/labor with proper identification to enter the
plant premises after ensuring that the jobs are scheduled.
4. At the time of deploying manpower, the Contractor shall strictly comply all the applicable
labor laws/Acts norms including but not restricted to the age of the workers, women
workers and shall also ensure that a police verification and security check for all the
workmen/labor engaged at the GIPCL site is done and necessary documents regarding
the same shall be submitted to the GIPCL’s authorized representative/officer-in-charge.
Any default in complying with the same or any misrepresentation regarding compliance
of the same shall compel GIPCL to initiate appropriate civil or criminal proceedings
regarding the same.
5. The Contractor shall also comply with the safety requirements and provide his
workmen/labor with safety equipment like helmets, masks, gum boots, a uniform and
other necessary PPEs for properly undertaking the operations involved under this
contract. Following are also to be issued:
6. Safety shoes
7. Goggles / face shield.
8. Ear plug / Ear muff.
9. Hand gloves like electrical hand gloves / cotton hand gloves / Chemical hand gloves
10. Contractor shall nominate /authorize senior experienced person in writing as site in
charge to co-ordinate with GIPCL engineer and who shall bear overall responsibility for
performance of the contract. Such person shall remain always available at site or site
office allotted to the contractor at SLPP site. Contractor has to submit the authority letter
and documentary proof for the same.
11. The Contractor shall appoint a supervisor who shall co-ordinate with GIPCL’s Engineer
In - Charge for daily entrusted job. They have to maintain daily records dully signed for
the works carried out and duly certified by Engineer-In-Charge. The Contractor in co-
ordination with the Engineer-In-Charge shall ensure the availability of adequate
manpower to carry out the job satisfactorily on a daily basis. As per the instruction of
Engineer-In-Charge they have to allot the work and execute the same in specified time
12. During execution of the works, one or more jobs may be required to be done
simultaneously and the Contractor shall mobilize additional resources accordingly.
13. During emergency or similar situations, the Contractor shall be required to mobilize
resources as per need within the period of 04 hours as directed by GIPCL. If the
contractor fails to mobilize sufficient manpower to complete the job in time, GIPCL will
execute the job through other agency at the risk and cost of the contractor with 10%
supervision charges& the same will be recovered from the Contractor’s bill.
14. During working in high risk area like hot lines of steam/ water/ oil the workman must wear
a suitable safety apron, safety belt, safety hand gloves and goggles. It is the
contractor’s/contractor’s supervisor’s responsibility to ensure it without fail.
15. During execution of the work, the contractor has to enhance the site manpower as per
the requirement to ensure the timely completion of work. The work is to be carried out
round the clock. Contractor should mobilize sufficient number of manpower and execute
the work in all shifts with independent manpower. Contractor should not continue the
same manpower for more than 12 hours.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
16. Accommodation of contractor's manpower is not allowed in the plant premises.
Contractor has to make his own arrangement for the accommodation and conveyance of
B: TOOLS & TACKLES:
All tools and tackles required to execute the contract are in the scope of the contractor.
The contractor should ensure that tools and tackles are in healthy & working condition.
All consumable items would be in the scope of the contractor.
Note: If work is suffered due to want of sufficient manpower, tools & tackles,
vehicles, equipments and/or required consumables then 25% of the total job cost
will be levied as a penalty for each and every instance.
(i) For proper execution of the work as per the scope, the contractor is required to maintain
sufficient quantity of tools & tackles with tractors & hydraulic trolleys in good working
condition at site as per day to day work load and emergency situations to complete the
work in stipulated time.
(ii) Arrangement for lighting at the work spot has to be made by the contractor. He has to
arrange all lighting equipment such as power cable, hand lamps. The contractor has to
take prior approval for taking electrical power supply. The contractor should keep hand
lamps of 24Volt for confined space and sufficient quantity of 240 Volt and halogen lamp
for other area ensuring safety at work place
(iii) Pin sockets of IS standards should be used for all connections. For any accident take
place & any damage to the equipment and/or injury to human due to carelessness in
loose connection, contractors will be held responsible & liable for any recovery/actions.
20. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the
contract to any other party or agency
21. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding Documents,
may notify the Company before one week of last date of submission of online Bid, in
writing or by E-mail at the GIPCL's mailing address [email protected] as indicated in
the 'Invitation to Bids'. The GIPCL's response (including an explanation of the query) will
be sent in writing or by E-mail to all prospective Bidders who have received the Bidding
22. TIME SCHEDULE
The basic considerations and the essence of the 'Contract' shall be the strict adherence
to the time schedule for performing the specified 'Works'.
23. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATION
The Bidder is required to carefully examine the specifications and documents, all the
conditions and matters work wise & cost wise. If any Bidder finds any discrepancies or
omissions in the specifications and documents or is in doubt for any meaning of any part,
he shall request in writing for an interpretation/ clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
All the payments against the work order shall be in Indian currency and payable through
cheque/RTGS only.
25. POINTS TO BE CONSIDERED DURING QUOTING ONLINE PRICE BID
a. The schedule of rates shall be read in conjunction with Instructions to Bidders, General
conditions of contract, Special conditions of contract and Technical specifications.
b. The quantities given in the schedule of rates are estimated and will be made as per actual
work carried out as per the rates of work order.
c. The method of measurement of completed work for payment shall be in accordance with
the method of measurement specified in the tender.
d. No separate amount shall be payable for use of auxiliary equipment incidental to or in
day to day operation in the course of fulfillment of contractual obligation of the vendor.
Note: Interested bidders are requested to submit the online tender at least two days in
advance from the due date set for on line submission of bid in order to avoid non
participation of e-tender due to probable technical problem in e-tender system.
The quantities specified are estimated and for tendering purpose only. Payment will be made,
based on actual work done as certified by Engineer-in-charge of GIPCL.
Quantities of individual items may be revised during the course of contract period based on site
requirement. Contractor shall not be entitled for any compensation on ground of such alteration
in scope of work. GIPCL reserves the right to operate or increase/decrease quantities in each
item or omit any item included in Schedule of Quantity at his discretion. Contractor shall have no
claim, whatsoever, on grounds of loss of anticipated profit etc. on account of the same.
After commencement of the work, GIPCL, for any reason may not require to be carried out the
whole/part of the work as specified in the tender, the ENGINEER-in-charge shall inform the fact
for thereof to the CONTRACTOR and contractor shall have no claim for any payment or
compensation whatsoever on account of any profit or advantage which he might have derived
from the execution of the work in full but which he did not derive in consequence of the full
amount of the work not having been carried out nor shall he have any claim for compensation
by reason of any change having been made in the original specifications and instructions which
shall involve any curtailment of the work as originally contemplated.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
Sr. No Description
01. Tender documents are available only in electronic format and same can
be downloaded from the website https://www.nprocure.com and
https://gipcl.nprocure.com and It can also be viewed from Company’s
website www.gipcl.com.
02. Price bid should be submitted online through the website
https://gipcl.nprocure.com only. No physical submission of price bid will
be entertained as it should be furnished on-line only.
03. Bidders who wish to participate in online tenders will have to procure /
should have legally valid Digital Certificate (Class III) as per Information
Technology Act-2000, using which they can sign their electronic bids.
Bidders can procure the same from any of the license certifying Authority
of India or can contact (n)code solutions- a division of GNFC Limited, who
are licensed Certifying Authority by Government of India
04. All bids should be digitally signed. The bidders are required to contact at
the below mentioned address for detailed training on on-line tendering and
also for requirement.
(n) Code Solutions - A division of GNFC Ltd.
403, GNFC Infotower, S.G Road,
Bodakdev, Ahmedabad – 380054 (Gujarat, India)
E-mail: [email protected], website: www.nprocure.com
Interested bidders are requested to submit the online tender at least two days in advance
from the due date set for on line submission of bid in order to avoid non-participation.
REVERSE AUCTION:
1) GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
2) E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders
(rounded to the next higher whole number) from the total bids received OR (b)
Minimum three (03) lowest bidders, whichever is higher, shall be invited for participation
in e-Reverse Auction through n-procure platform.
3) Opening Price, Detrimental value and duration for the e-Reverse Auction shall be
informed to the qualified bidders before start of e-Reverse Auction.
4) After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract
5) To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
https://e-auction.nprocure.com
6) In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required
for participating in online e-reverse bidding, then the Bidder can contact the following
office for assistance or training: that the bidder shall be allowed to participate the e-
Reverse Auction.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding e tendering
registration process.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
GENERAL CONDITIONS OF CONTRACT
1. CONTRACT SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE
As a Contract Security/Performance Bank Guarantee, the successful Bidder, to whom the work
is awarded, shall be required to furnish a Performance Bank Guarantee (PBG)/Contract security
deposit (SD) in favor of Gujarat Industries Power Company Limited of an equivalent amount of
ten percent (10%) of the “Contract Price excluding GST” from any Schedule Public Sector Bank
or Schedule Private Sector Bank in the format attached in SECTION-F, and it shall guarantee
the faithful performance of the 'Contract' in accordance with the terms and conditions specified
in these documents and specifications. Contract security deposit/PBG shall be submitted strictly
within twenty one days (21 days) from the date of LOI or work order, whichever is earlier. In
case contractor fails to submit PBG as per above GIPCL reserves the right to cancel the work
order and his EMD will be forfeited.
The PBG/ Security Deposit shall be valid up to retention period of four months from the contract
completion date. The Guarantee amount shall be payable to the Company in Bidder's home
currency without any condition whatsoever.
GIPCL reserves the right to forfeit Performance Bank Guarantee (PBG)/Contract security
The Performance Bank Guarantee (initial security deposit) will be returned to the
Vendor/Contractor without any interest at the end of the ‘Retention Period' after completion of
contract and on fulfilling contractual obligations throughout the retention period. However, any
delay in submission of SD will result in equivalent late release of entire SD after guarantee
Bid security/EMD should be refunded to the successful bidder on receipt of Performance
The Bank List to obtained PBG from the banks is as below:
• All Nationalized Banks
• Kotak Mahindra Bank
• IndusInd Bank
• Karur Vysya Bank
2. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of contractor or any
other reasons attributed to contractor the decision of Engineer-in-charge regarding the
amount of recovery shall be final and binding subject to a maximum of 10% of contract
value. Recovery will be affected from the monthly bills and/or security deposit.
(ii) If the contractor fails to execute the work as per directions of Engineer (I/c) within the
time frame given in work order and as per day to day instructions by Engineer-in-charge,
GIPCL shall get the work done by third party at the risk & cost of the contractor with 10%
additional overhead charges of GIPCL.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
3.DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses that GIPCL may have paid, for which, under the contract the
contractor is liable, shall be recovered by the GIPCL. The contractor shall pay all such claims
within 15 days of claim failing which the same shall be deducted from the bills of contractor.
4. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule and in case
contractor fail to complete the job, GIPCL shall recover from his bill, Security Deposit and /
or whatsoever for expenses incurred to complete the job with additional 10% overhead
In case if contractor’s services are not found satisfactory with respect to mobilization, time
bound completion of work, workmanship & safety (OHSAS policy of GIPCL) then GIPCL has
right to terminate the contract at any time by giving him 15 days advance notice without
assigning any reason and will make the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages after giving
15 days advance notice to the contractor if any of the following events occur –
i. Contractor is adjudged as insolvent.
ii. Major contractual violation or failure to perform as per terms and condition of the tender
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per requirements of the
iv. Contractor has neglected or failed persistently to observe or perform any of the acts,
matters or things, which as per the contract are to be observed and performed by the
v. Contractor repetitively violating the safety norms for more than three incidents.
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality of job.
viii. GIPCL reserves the right to terminate the contract without giving any reason whatsoever
and forfeit the PBG.
5. FAILURE & TERMINATION
• If the CONTRACTOR after receipt of written notice from the GIPCL/ ENGINEER
requiring compliance, with such further drawings and / or the GIPCL /ENGINEER
instructions fails within seven days to comply with the same, the GIPCL /ENGINEER
may employ and pay other agencies to execute any such work whatsoever as may
be necessary to give effect thereto and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL on a certificate by the
GIPCL/ENGINEER as a debt or may be deducted by him from any money due or to
become due to the CONTRACTOR.
• If the contractor fails to execute the work or fails to mobilize the resources and
equipments as per directions of GIPCL / ENGINEER within the time frame given
and/or violating the GIPCL’s safety rules & regulations, ENGINEER/ GIPCL shall get
the work done by third party at the risk & cost of the CONTRACTOR with additional
10% overhead charges of GIPCL and all costs incurred in connection therewith shall
be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt or may
be deducted by him from any money due or to become due to the CONTRACTOR.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
• If contractor fails to perform as per the terms and condition of the work order/tender
and fail to complete the work within the prescribed time limit in the execution of work
in first Unit, then GIPCL reserves the right to get the work of other Unit with other
available agency.
6. SETTLEMENT OF DISPUTES
a. Any disputes or difference of opinion between parties arising out of the contract to the extent
possible shall be settled amicably between the parties. If amicable settlement cannot be
reached all the disputed issues shall be resolved through arbitration before a Sole Arbitrator
appointed by Managing Director, GIPCL according to the provisions of The Arbitration &
Conciliation Act-2019, as amended from time to time. The place of arbitration shall be at
Vadodara/ Surat or any other place within state of Gujarat.
b. Work under the contract shall be continued by the contractor during arbitration proceedings
unless GIPCL shall order suspension thereof or any part thereof in writing or unless the
matter in such work cannot possibly be continued unless the decision of the Arbitration
proceedings is obtained.
7. INTERPRETATION CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification, the
decision of Chief General Manager (Thermal) -GIPCL will be final and binding on the
8. EMPLOYEE’S COMPENSATION INSURANCE
Contractor shall take all risk Insurance Policy to cover all his workmen/employees, staff
applicable under the Employee Compensation Act 1923 or any amendment thereof as also
insurance cover for third party liability. The contractor shall keep the GIPCL indemnified
from all liabilities arising out of his action in pursuance of this contract. The E. C. Policy
should be obtained from Baroda/Surat Jurisdiction (As per Work Location) and shall be
assigned to GIPCL. EC policy should cover the specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his workers.
9. STATUTORY REQUIREMENTS
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules, orders and
notifications whether central or state or local as applicable to him or to this contract from time to
time. These Acts/Rules include without limitation of the followings.
1. Contractor shall be solely responsible and shall fully comply with all the provisions of all the
labor laws applicable such as the Minimum Wages Act, 1948, Contract Labor (Regulation
& Abolition) Act 1970, Factories Act, 1948, Payment of Bonus Act 1965, Employees
Provident Fund and Miscellaneous Provision Act 1952, Industrial Dispute Act
Workmen Compensation Act 1923, Payment of Gratuity 1972, Interstate Migrant Workmen
Act 1979, Equal Remuneration Act with Rules, Order and Notifications issued/made there
under from time to time.
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present of future applicable to the
contractor from time to time for performing the contract job.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
2.1 The Contractor shall provide and be responsible for payment of Wages, Salaries, Bonus,
Social charges, Insurance, Food, Accommodation, Transport, Medical and Canteen
facilities and other statutory privileges and facilities to his personnel as per
law/rules/regulations and orders of the Central Government, State Government, Local
Authorities or other authorities as are in force from time to time. All employees of the
Contractor shall be employee of the Contractor.
2.2 The contractor shall have a valid license obtained from Licensing Authority under the
Contract Labor (Regulation & Abolition) Act-1970 at the time of execution of the contract
covering all his employees working at SLPP site and furnish the same failing which GIPCL
may terminate the contract at its sole discretion.
2.3 The Contractor shall at the time of execution of the contract have a EPF Code Number
obtained from the Authorities concerned under the Employees Provident & Miscellaneous
Provisions Act, 1972 and remit contributions in respect of the employees employed by him
at SLPP Site to the P.F office concerned every month failing which GIPCL will recover from
the outstanding payment to the contractor from GIPCL.PF code of Gujarat region should be
2.4 The Contractor shall maintain all records/registers required to be maintained by him under
various labor laws mentioned above and produce the same before the Statutory Authorities
whenever required.
2.5 The Contractor shall also submit periodical reports / returns to the various statutory
authorities such as the Contract Labour (Regulation & Abolition) Act-1970, Employees
Provident Fund Act etc. Under intimation to HR&Admn.Dept.
2.6 The Contractor shall not pay less than the Minimum Wages notified by the Government from
time to time to his employees of corresponding categories.
2.7 The Contractor shall be responsible for payment of overtime wages to his workmen, if any,
in case they are required to work beyond the prescribed hours under law as per applicable
2.8 The contractor shall take Workmen Compensation Insurance Policy for all his employees
working at GIPCL. The contractor shall indemnify the company against any liability due to
any work injury or accident to any of its employees.
2.9 The Contractor shall in the event any of his workmen / employee sustains any injury or
disablement due to an accident arising out of and in the course of his employment, provide
necessary medical treatment and pay compensation as applicable, required under the
Workmen’s Compensation Act,
2.10 If any of the persons engaged by the Contractor misbehave with any of the officials or the
Company or commit any misconduct with regard to the property of the Company or suffer
from any serious communicable disease, the Contractor shall replace them immediately.
2.11 The Contractor shall not engage / employ persons below the age of 18 years. Employment
of women shall be strictly according to applicable laws.
2.12 GIPCL will have right to deduct and disburse the claims of the individual / parties being a
principal employer on any account whatsoever in relation to their employment with the
contractor. The Security deposit will be released to the contractor at the end of the
contractual tenure subject to an undertaking by the contractor that in the event any of his
workmen or the heirs of workmen puts up a claim for recovery of money due to him from
the contractor before the appropriate authority under the I.D.Act 1947 or under any other
labor laws or for compensation under the Workmen’s Compensation Act, 1923 and the
appropriate authority has given a direction for making payment the contractor will meet the
same or indemnify GIPCL if in the event GIPCL pays it as Principal Employer.
2.13 The contractor shall make payment of wages to his employees on fixed date within the
period specified under the applicable Law, in presence of representative of the company.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
He will submit a true copy of wage sheet, attendance register and P.F. remitted challans on
monthly basis to HR&A dept. for verification and record.
2.14 The Contractor shall provide Safety items / kits to his employees such as safety shoes,
goggles, ear plugs, hand gloves, safety belts etc., if any, required under the law.
2.15 The contractor shall conduct pre-induction and periodic medical checkup of his workmen as
per applicable laws.
2.16 The contractor shall be solely responsible for any accident caused to his workers and should
adhere to all rules / regulations as per labor laws of Government and other statutory laws
2.17 The contractor should register himself under the Contract Labor Act, Employee
Compensation Act and PF Act (Code no. to be mentioned) and submit the copy of
registration certificate and should possess the same from the date of commencement of
work, failing which the contract is liable to be cancelled. The E.C. Policy copy should be
submitted to the GIPCL before commencement of the work and Labor License should be
obtained within one week from the date of issue of form-V. Contractor should apply for Form-
V immediately after receipt of LOI. A copy of Labour License shall be submitted to GIPCL,
HR & A Department.
2.18 Contractor shall have to insure his workmen /supervisors etc. under Group Insurance
2.19 The Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund Act, All
Labor Laws Act in respect of employees engaged by him for the work and shall have to
maintain necessary records. In case any amount becomes due to be payable by him to his
employees or to the Government under the above rules, regulation, Acts, GIPCL reserves
the right to recover the same from the running bill of the contract.
2.20 Documentary evidence of deposit of PF paid shall have to be produced by the contractor
along with the next bill.
2.21 Records as per the provisions of various statutory Acts will have to be maintained by the
contractor and submitted as and when required.
2.22 All employees of contractor should maintain due discipline and respect local sentiments.
GIPCL reserves the right to direct the contractor to remove any such person who does not
comply with it.
2.23 The list is indicative in nature and not an exhaustive one. Any
amendment/alteration/Notifications or addition to the existing Law or a new statute shall
automatically and immediately become applicable.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the payment
as per the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the provisions of
Contract Labour Act, 1970 and maintain necessary records and registers under the said
3. Contractor shall submit a copy of each of the registration certificates with respect to
Employees Provident Fund and Employee Compensation Act within one week time, from
the date of award of this contract.
4. Contractor’s employees, agent or sub-agent shall not smoke or light anything within the
premises of the GIPCL and carry match box / lighter or any other explosive and /or
inflammable material inside the plant.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour Laws etc.
6. Contractor shall issue an appointment order to each casual labourer stating therein the
nature of job to be performed by him and fix time for which the concerned labourers are
likely to be deployed. Contractor shall also issue a temporary identity card specifying the
period for which the labourer has been deployed.
7. Contractor is fully liable for the persons engaged by him for above work; however, GIPCL
reserves the right to deduct any amount legally justified towards any liability not fulfilled.
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment of the
9. If the contractor fails to complete the allocated job within specified time frame, GIPCL shall
get the work done by third party at the risk and cost of contractor. .
10. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act
enforced from time framed by the government such as Factory Act, Employee
Compensation Act, payment of ‘Wages Act’, Minimum Wages Act’, Provident Fund Act,
Payment of Bonus Act, Labor Law Act, maternity benefit act in respect of employees
engaged by him for the work and shall have to maintain necessary records. In case any
amount becomes due to be payable by him to his employees or to the Government under
the above rules, regulation, Acts.
11. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party workmen
due to any act omission / indiscretion on your part while undertaking the work and
contractor shall fully abide by the statutory requirements of the employee's compensation
act. GIPCL shall not be liable for any compensation due to accident, death or injury to any
of contractor’s workmen or any third party due to negligence, act or omission on your part.
Necessary illumination at works area will be provided by GIPCL. However, work specific
lighting should be arranged by contractor.
13. NIGHT/SUNDAY/HOLIDAY SHIFT
The contractor shall depute qualified and adequate resources in night
shift/Sunday/holidays for any emergency job, which may come up at night/Sunday/holiday.
14. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL which
are at present in force and which may come into force during the pendency of the contract.
Any violation of any rules and regulations will entail immediate termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required test
certificates as per the Factory Act 1948 and the state factories rules has to be submitted
to safety Dept. Safety Dept. Will check the certificates and if found okay, then only materials
will be allowed to enter inside the plant. Material inward gate pass will be made only after
certification from Safety Dept. Security Dept. will inform to Safety Dept., as & when such
tools and tackles brought at the gate for making entry in the maintenance site.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
The contractor has to submit the list of required safety gears along with safety equipments
available with him to safety Dept. Safety Dept will check for quantity and quality of the
safety gears and then allowed permission of work. Poor quality material will not be allowed
to take inside the Plant. If quantity of required safety equipments is not satisfactory,
contractor will not be allowed to carry out the work using such safety gears inside the Plant
15. GENERAL SAFETY CLAUSES
1. The Contractor shall observe and comply, with regard to his workmen working at the
SLPP site, the safety norms as per the safety operating standards.
2. The Contractor shall ensure that his workmen are informed and trained regarding the
safety standards to be adopted while operating within the SLPP Plant & Mines premises
and the Contractor shall brief them regarding the same and use of the Personal
Protective Equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his
workmen immediately on execution of the work and the contractor shall ensure that his
workmen wears the protective equipments at all times during the work operation. Brand
name for safety shoe & safety helmet shall be suggested by safety representative of
Sr. No. Model Company Specifications
01. Tough Hat, HP-TH Sure Safety
02. V-Gard MSA ISEA Z89.1-2009
03. PN 521 - Shelmet Karam
Sr No. Model Company Specifications
01. Acme Fabrik plast Co. SSTEELE (Strom) – Double
02. Acme Fabrik plast Co. TRIMAX(Adjacent) – Double
03. Worktoes Warren Worktoes - Warren Plus
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots, full
body safety uniform and belts, safety net etc. shall be issued and used as per the job
requirements. Safety helmet shall be of YELLOW COLOUR ONLY. Contractor will
procure safety shoes & safety helmet from a reputed company with at least 12 months’
guarantee and shall produce the guarantee certificate and IS standard certificate to the
safety department. Contractor should purchase safety shoes of reputed brands. Safety
shoes will be issued every year. IS certificate and guarantee certificate must be obtained
from the vendor and submitted to the Safety department. Safety shoes should be heat,
water, oil and chemical resistant, having an anti-slippery sole of 15298- 2002 make.
5. It is the duty of contractor to ensure that his workmen are wearing required PPEs as per
work requirement. Contractor should ensure that their workers are wearing Safety
helmet, safety shoes, dust mask, goggles, ear plug etc. at all times when they are at work
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
throughout the contract period. The contractor has to maintain the PPE issue registers
with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same.
Replacement shall be made immediately.
7. The contractor shall be responsible for providing first aid or emergency medical help and
treatment to his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of required
quality, GIPCL will issue the required PPEs to contract workers and back charge the
same with 25% overhead charges of GIPCL.
9. All lifting tools and tackles shall be duly certified by competent person in conformity with
the statutory requirements and certificate in form no. 10 as per rule 60 of Gujarat
Factories Rules, 1963 and section 29 of the Factories Act, 1948 shall be submitted every
year before using such tools and tackles. In case of purchase of new lifting tools and
tackles, form no. 10 as per the said rules shall be submitted before they are taken into
use. All lifting tools and tackles shall be of reputed make having International
manufacturing standard and shall be maintained in proper and workable condition.
10. The Contractor shall nominate one Safety Officer with required qualification for
supervising the daily job/ shutdown jobs for observing and maintaining the safety aspects
at site. He is solely responsible for any safety measures during maintenance work. He
has to ensure that all the workmen working at site are equipped with essential PPE’s and
proper safety arrangement is made at the SLPP site.
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks, D-
shackles, wire ropes, winch machines, Mobile crane, Hydra etc. shall be offered for
inspection with all above statutory test certificate before using at site for any work. They
should use all tools and tackles only after certification by GIPCL representative/safety
12. When working at height, working on ceiling or roof covered with fragile materials, full body
harness safety belt, ladders and crawling boards shall be used to prevent accident.
Further, during working on height, contractor should arrange proper scaffolding of still
pipes, safety net, full body safety belt, fall arrestor system etc. Advice and instructions of
engineer in charge/ safety in charge shall be strictly complied with in this regard. All
necessary safety precautions shall be taken by the contractor to prevent accident and
personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting torch,
on DA cylinders and on O2 cylinder. Cylinder caps also required for handling the cylinders
at the work at height area. Gas cylinders shall be transferred through gas cylinder trolley
only with cylinder cap and stored up right (vertical) position only. All gas cylinders shall
be hydro tested / certified as per gas cylinder rules 2004. Gas cylinders shall be stored,
handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested as
per Government approved RTO guidelines. All Vehicles must be parked in Parking space
designated by GIPCL. If any vehicle is found inside the plant premises other than the
parking area such vehicles shall be handed over to Security dept. and their entry shall
be cancelled for movement inside the plant premises with immediate effect.
15. All electrical equipment shall be in good condition and free from any defect. Electrical
tools &equipments i.e. welding machine, grinding and drill machine etc. may be checked
by the electrical engineer of the contractors regularly, every six month at least and report
to be submitted to concerned HOD and safety depts.
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets to
prevent falling and spreading of sparks and hot material on and around the work area.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Contractor will procure and use such items. ELCB / RCCB shall be provided with rating
of 9-30 milli amperes on welding machine and all portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form
(S-II) and near miss report within time limit as specified in forms, if any accident, Incident,
near miss occurred while working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and above)
should appoint / nominate one qualified safety officer and he shall be responsible for
addressing all the safety related aspects of execution of contract jobs and he will in close
co ordination with safety officer of SLPP and attend all safety related meeting such as
safety committee, on job safety training etc. Where the contractual man power is less
than 50, the site in-charge of the contractor will act as a safety officer and he will perform
all the duties of safety officer as mentioned above.
19. No loose connection / joints allowed in electrical cables during performance of any kind
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is required
as per RTO guidelines.
22. The Contractor’s nominated safety officer shall be imparted regular on-job safety training
like tool-box talk etc. and submit a record of such training in safety dept, respective dept
and HR&A dept. T
23. The Contractor shall comply all the new requirements related with safety as informed by
the HOD / Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows:-
The Contractor & Contract workmen shall strictly adhere to Safety standards / Guidelines
as per practices. The list provided below is an indicative list to explain the principles
behind safety practice. If the contract workmen fail to comply with safety standards as
per category A, B & C below, penalty shall be levied on the contractor as per the table
mentioned below:
Category Classific Examples / Cases Penalty
PPEs Working without helmet, shoes, safety
A Rs. 100/- per instant.
Related belt, gloves etc.
Failure to adhere to HSE
guidelines/plans, careless attitude in
• Rs. 500/- per instant
material handling, Machine being used
with damaged machine guard, unsafe
electrical work – workout plug
• After three incidence. Per
top/improper electrical joints/cables
incidence Rs. 2500/-.
lying on ground, electrical equipment
B Work working without proper earthling,
Instructio machine being used without machine
n Related • Continuous unsafe acts will
guard, Welding machine without
disqualify the contractor from
incidence ELCB / RCCB of proper
further participation in tender
rating, Gas cylinder without test
certificate, Cylinder cap, NRV /Flash
back arrester, Cylinder trolley etc.
Unsafe working practices at height
more than 3 Meters.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Working without permit non-
compliance with permit conditions like
hot work, height work etc. as
applicable, lifting tools and tackles
being used without third party
inspection certificates in form no. 9/
as per Factory Act - 1948 etc.
• Suspend the entry gate pass
Unsafe Breach of safe practices by a particular for one week.
Practices person repeatedly for three times. • After two suspensions his
gat pass will be cancelled
General Electrical Safety Rules and Regulations:
Electrical safety
➢ All the electrical apparatus including welding machine (either 3-phare or single phase)
should be provided with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO) of 30mA
➢ Bidder should ensure periodic checking of ELCB provided in their electrical apparatus.
➢ Bidder should ensure that there should not be any joint in the power supply cable of any
machine. All cables should be in good condition with no bare insulation or frayed wires
➢ Any power supply switchboard/extension boards brought by Bidder should have ELCB
of 30mA rating and it should have sockets along with 3-pin plug
➢ Any type of cable brought by Bidder should not have any joint and should be of sufficient
capacity for the respective job.
➢ Bidder to bring their own 24V rating portable hand lamps along with cable of (apparatus
should be having 230V / 24V transformer) for the temporary lighting arrangement
required at site for the respective jobs.
➢ Bidder should bring sufficient qty no. of temporary light fixtures (230V or 24 V as per
requirement of job/contract) , extension boards, cables to draw supply from nearest
➢ Hand-held and portable machines shall be equipped with a built-in switch to switch off
power in case of emergency
➢ Bidder to ensure healthiness of their electrical equipment whenever brought to GIPCL
site and get them tested / verified by GIPCL Electrical Department representatives before
➢ Bidder to ensure - All portable electric apparatus shall be regularly examined, tested and
maintained to ensure that the apparatus and leads are in good order.
➢ Only three-core cable shall be used for single phase operated tools with the third core
connected to earth.
➢ Ensure that all metallic portable appliances are provided with 3 pin plug and socket
connections with third pin be connected to the ground terminal where ever possible. Also,
the metal work of the apparatus is effectively earthed.
➢ All cables and connections should be sound and of adequate capacity and properly
insulated while using any welding machine and other power connections.
➢ The earthing arrangements should be properly made with earthing clamps or a bolted
terminal while using any welding machine
➢ Electric holders when not in use, should be placed on an insulated hook or the holders
should be fully insulated while using any welding machine
➢ Whenever the welder stops or leaves work for any appreciable time, the power supply to
welding machine shall be effectively disconnected while using any welding machine
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
➢ GIPCL will provide either single phase OR 3-phase 3 wire power supply from the nearby
point at job site. Bidder to supply the required cable between GIPCL power supply point
to equipment brought by Bidder for the specified job. Further, if Bidder’s equipment
requires 3-ph 4 wire supply then they should derive 3-ph 4 wire supply from GIPCL 3-ph
3 wire supply system by incorporating sufficient capacity transformer. Like for hydro jet
cleaning system, mixer machine, induction heating machine, SR machine etc., GIPCL
will provide 3-ph 3 wire power supply.
➢ Cable between welding machine to GIPCL power supply point should have cable TOP
plug towards GIPCL power supply point of Make BALS having rating as 63 Amp.
➢ Contractors not following above electrical safety points at any point of time are liable to
penalty and their machine/ apparatus shall be seized by GIPCL.
Penalty so levied against the contractors and company employees will be used during the
observation of National Safety Day.
The contractor, workmen following good safety practices in their work area
continuously will be rewarded / honored on National safety day.
16. REJECTION OF WORK:
If, as a result of inspection, examination or testing, the GIPCL’s Representative/Engineer
decides that any materials, work or workmanship is defective or otherwise not in accordance
with the Contract, the GIPCL/Engineer/ GIPCL’s Representative may reject such plant,
materials, work or workmanship and shall notify the CONTRACTOR promptly, stating his
reasons. The CONTRACTOR shall then promptly make good the defect and ensure that
the rejected item complies with the Contract. If Contractor failed to rectify the rejected work
or workmanship, GIPCL/Engineer reserves the right to deduct or withhold amount against
rejected work or Workmanship. CONTRACTOR shall not entitle for any claim or release of
hold payment until rectify the defect up to satisfactory of GIPCL. If Contractor failed to rectify
any such defective work or workmanship, GIPCL reserve the right to rectify at risk and cost
of the CONTRACTOR and deducted by the GIPCL from any amount due, or to become
due, to the CONTRACTOR’s dues.
If the GIPCL/Engineer/GIPCL’s Representative requires such materials, work or
workmanship to be retested, the tests shall be repeated under the same terms and
conditions. If such rejection and retesting cause the GIPCL additional costs for the traveling
and lodging costs of GIPCL/Engineer’s personal for attending the retest, such costs shall
be recoverable from the CONTRACTOR by the GIPCL and may be deducted by the GIPCL
from any amount due, or to become due, to the CONTRACTOR.
17. GENERAL TERMS AND CONDITIONS:
a. All tools & tackles, labors, equipments, vehicles, tractors, etc… to execute the contract
are in the scope of the contractor. The contractor should ensure that tools & equipments
are in healthy condition.
b. The decision of the Engineer-in-charge shall be final and binding on the contractor for
defining the terms and condition included in this contract.
c. If the work is not found satisfactory, Engineer-in-charge reserves the right to take suitable
d. Contractor shall depute Location/Package wise full time independent experienced site-
in-charge and two nos. of independent site supervisors at site (Defined by user
department in respective tender). They shall co-ordinate with GIPCL engineer and shall
bear overall responsibility of contract including joint measurement, billing etc. Such
person shall function from site office of contractor at SLPP.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
e. Contractor shall also nominate one safety supervisor at site and shall submit nomination
of safety supervisor in writing before commencement of contract. Safety supervisor shall
arrange small safety talk on every day morning or whenever required with all workers
working under this contract. He shall coordinate with concern department’s Engineer-in-
charge on daily basis and report daily observations, tool-box talk records etc. The work
shall not be allowed without deploying safety supervisor and a penalty equal to Rs.
1,000/- per day absent of safety supervisor shall be levied from Contractor.
f. Contractor shall strictly follow the existing work permit system of the GIPCL and any
future revisions.
g. The contractor has to take EC insurance policy for their workmen. The contractor has to
submit labor license and PF account number to the Engineer-in-charge before start the
h. The contractor has to do the job timely. GIPCL shall not compromise in delay. In case of
delay of work without any valid reason, the GIPCL reserves the rights to carry out the
work by deploying other agencies at the risk & cost of contractor with additional 10%
overhead charges.
i. Contractor shall mobilize the resources as per need within the period of twenty four hours.
If the contractor fails to mobilize sufficient resources to complete the job in time, GIPCL
will execute the job through other agency at the risk and cost of the contractor with
additional 10% overhead charges.
j. Contractor should mobilize all resources for efficient & smooth execution of contract
within seven to fifteen days from the date of issue of Letter of Intent/Work Order.
k. The prices / item rates quoted shall remain firm till completion of the contract and any
agreed extensions thereafter and shall not be subject to any escalation, idle charges for
labor, machinery, overhead expenses etc… due to any reason whatsoever. No price
escalation / idle charges shall be entertained due to delay in work on unavailability of
work front, non-issue of work permit, holding of work permit for any reason, unavailability
of contractor’s supervisor, unavailability of contractor’s safety supervisor, violation of
safety rules, unsafe act by any of contractor’s worker, negligence & ignorance of safety
& quality instructions of GIPCL Engineer-in-charge or any other reason whatsoever.
l. Contractor must fulfill all the safety regulations and to take safety measures to avoid
hazards. Contractor shall arrange all standard adequate healthy safety PPEs like but not
limited to approved quality safety shoes& safety helmets, standard dust masks, safety
goggles, etc… as required and shall use exclusively under this contract for all the time
during working at specified locations failing which, the Engineer-in-charge may hold the
work and will take necessary action including penalty as decided. If the contractor
repeatedly violates safety rules/regulations (more than three successive incidents),
Engineer-in-charge may take necessary action against the contractor, including
appropriate financial penalty) and/or termination of contract.
m. One or more jobs may be required to be done simultaneously and contractor shall
mobilize additional resources accordingly.
n. Timely completion of all jobs and works shall be the essence of this Contract. Contractor
should closely monitor each activities and complete the jobs as per the time given by and
under the supervision of the Engineer-In-charge and shall ensure that sufficient
manpower is deployed for the same.
o. The contractor has to complete the works as per the planning schedule and their
respective supervisor has to interact with Engineer In Charge for PTW (Permit to work),
work instruction, Return of permit.
p. The contractor has to submit daily reports showing work carried out with details of
available manpower, tractors etc.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
q. Any job other than the listed jobs in work order shall be executed by the contractor on
instruction from GIPCL and payment shall be made to the contractor on respective item
r. The Government of India has enacted the Micro, Small and Medium Enterprises
Development Act, 2006 (the “Act”) and the Act has come into force from October 2,
The Bidder shall confirm whether your organization is registered under the Micro, Small
and Medium Enterprises Development Act, 2006. If your organization is registered under
the Act, please specify the category i.e., Micro Enterprise, Small Enterprise or Medium
Enterprise under which it is registered and kindly attach a copy of your registration
s. The Bidder shall provide details of registration along with copy of the registration
certificate issued by the District Industries Centre/Department of Industries, etc of the
respective State Government. It is to be noted that large scale industries and trading
firms have been excluded from the purview of the Act.
t. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001:2011 (EnMS) certified
company, and GIPCL gives extreme importance to maintain these global standards.
Contractor shall be required to observe these standards while working with GIPCL.
Contractor should ensure that his workmen/labour work in accordance with them.
18. CONTRACTOR’S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a qualified
experienced site-in-charge of the works with adequate experience in handing of jobs of this
nature and with the prior approval of the GIPCL / ENGINEER. Such in-charge shall be
constantly in attendance at the site during working hours. During CONTRACTOR’S
supervisory engineer absence during working hours, if unavoidable, and also beyond
working hours, when it may be necessary to give directions, orders may be given by the
ENGINEER / GIPCL and shall be received and obeyed by the CONTRACTOR’S
superintendent or Foreman who may have charge of the particular part of the work in
reference to which orders are given. If requested to do so, the ENGINEER /GIPCL shall
confirm such orders in writing. Any directions, instructions or notices given by the
ENGINEER / GIPCL to him, shall be deemed to have been given to the CONTRACTOR.
The representative of the CONTRACTOR shall have all necessary powers to receive
materials from the GIPCL, issue valid receipts for the same, engage labour or purchase
materials and proceed with the work as required for speedy execution.
None of the CONTRACTOR’S Superintendents, engineers, supervisors or labour should be
withdrawn from the work without due notice being given to the GIPCL / ENGINEER; further
no such withdrawals shall be made if in the opinion of the GIPCL / ENGINEER such
withdrawals will jeopardize the required pace of progress / successful completion of the
The CONTRACTOR shall employ in or about execution of the work only such persons as
area careful, skilled and experienced in their respective trades, and the GIPCL shall be at
liberty to object to and require the CONTRACTOR to remove any person employed by the
CONTRACTOR in or about execution of works who in the opinion of the ENGINEER
misconducts himself or is incompetent or negligent in the proper performance of his duties
and all such persons shall not again be employed upon the works without the prior
permission of the GIPCL.
Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire or employ
any employee of the other party except by mutual consent.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
19. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND CLEAN-
All loose materials, wastage, packing materials, cut pieces or other matter of an offensive
nature shall not be deposited on the surface, but shall at once be carted away by the
CONTRACTOR to some pit or place provided by him away from the site of work and
approved by local authorities. As a part of the work included in this contract, the
CONTRACTOR shall completely remove and satisfactorily dispose of all temporary works
to the extent directed. He shall tear down and dispose of all temporary works, shall remove
or grade, to the extent directed, all plant and equipment, shall satisfactorily dispose off all
rubbish resulting from the operations under this contract and shall do all work necessary to
restore the territory embraced within the site of his operations to at least as good order and
conditions as at the beginning of the work under this contract.
20. FACILITIES TO BE PROVIDED BY GIPCL
A. The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point. Further distribution to be done by
contractor at their cost. All type of conveyance is in contractor scope.
b. Quarter(s) for supervisor/ engineers on chargeable basis in GIPCL’s township Narmada
guest house at discretion of GIPCL if available.
c. Industrial Canteen facility on chargeable basis for workmen.
d. Workshop facility as available at site only. However, contractor may visit the workshop
to ensure the existing facility. For the facilities other than available, contractor has to
carry out the job outside at their own cost.
e. First aid facilities as available on chargeable basis.
f. If required Hydra(crane) would be provided for material loading/unloading/ shifting
purpose on chargeable basis as per availability of Hydra.
g. Accommodation of contractor's manpower is not allowed in the plant premises.
Contractor has to make his own arrangement for the accommodation and conveyance
of his manpower.
Apart from the above, no other facilities shall be provided by GIPCL.
B. GIPCL shall also conduct an orientation program appraising the workmen regarding
Safety norms and measures to be observed during work operations at the plant site.
21. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be fully
conversant with modern practices and should be able to carry out works independently of
large thermal power plant. The contractor shall therefore be required to engage qualified/
experienced personnel to undertake the work as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records and maintain
c. All the work measurements shall be jointly recorded in a measurement
sheet/register/relevant documents by the contractor / authorized representative of the
contractor and the Engineer-in-charge. The measurements shall be clearly written indicating
date of measurement, location, reference to drawings, if any, and jointly signed.
d. The Contractor shall be required to furnish satisfactory job completion report to GIPCL. The
submission of report should be on daily basis, the monthly bill payment shall be released
based on the certified reports of the works.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
e. Inspection of work will be done by Engineer in Charge or his authorized representative. If the
work is not found satisfactory engineer in charge reserves the right to take suitable action
and shall be binding to the contractor.
22. PUBLIC HOLIDAYS
The Contractor shall be responsible for giving benefit to all his employees, employed in
whatsoever capacity, 09 Public/Paid holidays and the same shall be notified in advance and
due communication thereof shall be made to the Management.
23. BENEFIT PAYABLE IN CASE OF ACCIDENT OCCURRING OUTSIDE PREMISES OR
BEYOND THE COURSE OF EMPLOYMENT
The Contractor shall provide an insurance coverage (Medical + Death Benefit) for sum of
Rs. 01/-Lakh to all his workmen/labour deployed at GIPCL-SLPP site for the accident taking
place anywhere outside the Company premises or at any place when the workman is not in
course of his employment.
24. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without
incurring the penalty in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other Party
in writing of such conditions and the performance shall be suspended as per mutual
For the purposes of this clause, ‘Force Majeure’ means an event beyond the control of the
Party and not foreseeable by the Party and shall include events of floods, explosions, riots,
wars, hurricane, epidemics, any other Act of God, quarantine restrictions, terrorism,
government actions and provided always that such acts result in the impossibility of the
further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all actions,
proceedings, claims, demands, losses, costs, damages and expenses whatsoever which
may be brought against or suffered by GIPCL which it may sustain, pay or incur as a result
of or in connection with the performance/ purported performance/ non-performance of the
contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any direction or
order is issued by court at any point of time the contractor shall comply with and implement
such direction or order whether passed at the time of award of contract or during the
pendency of contract. Further, the Contractor shall indemnify the GIPCL against all
consequences arising and affecting GIPCL owing to the compliance of the orders by the
26. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the Courts
at Baroda/Surat shall have jurisdiction regarding the same.
27. Where any portion of the General Condition of Contract is repugnant to or at variance with
any provisions of the Special Condition of Contract, then unless a different intention
appears, the provision of the Special Conditions of Contract shall prevail to the extent of
such repugnancy of variance.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
SPECIAL CONDITIONS OF CONTRACT
1. TERMS OF PAYMENT
A. Conditions of Payment:
The contractor shall raise the invoice in duplicate in respect of the work performed or
completed along with the documents as hereinafter provided. On receipt of the invoice
complete in all respects and with all the said documents, the payment for the supply and for
the work executed shall be made within 21 days thereafter as per the following terms of
(i) 100% of bill along with 100% taxes shall be released against the work executed
duly certified by GIPCL Income Tax (IT) will be deducted at source from bills as
per the rules in force.
(ii) Security deposit at 10% of contract value excluding GST shall be submitted as
per clause no.: 1 of Section-C.
(iii) GST shall be paid along with bills after fulfillment of following terms.
(a) Submission of copy of registration certificate issued by GST Authority (to
be furnished only once).
(b) Citing the Goods and service Tax Registration no. And the date of issue
of registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on the
(d) The contractor shall be required to submit the proof of payment of GST of
previous month/quarter, as may be applicable as & when demanded by
GIPCL/Owner/company.
(e) The Bidder shall inform the GIPCL in the event of its registration
certificate is cancelled or discontinued for whatsoever reason.
(f) The vendor shall also mention on their invoice the HSN/SAC code as
applicable under the GST laws under which GST is levied and a self
certified authentic third party evidence (www.cbic-gst.gov.in) shall be
adduced, one time , to that effect by the vendor.
(g) Final Bill shall be submitted along the Indemnity Bond and “No Claim No
Arbitration” certificate as per format given in Annexure – K & Annexure - E
(iv) While making running account payment, the following deductions may be made
by GIPCL, if applicable:
1. Cost of materials issued, if any, by GIPCL and to the extent consumed in the
2. Security deposit recoverable if any.
3. Advance on materials / work progress advance payments, if any.
4. LD/Penalty for delayed delivery, penalty for delayed execution of work,
recovery of charges for the work done by other contractor due to delay or any
other reason, if applicable
Any other dues recoverable by GIPCL from the contractor under the contract.
(V) The Contractor shall include all his claims in the Final Bill (within four months)
submitted by him and accordingly the final bill submitted by the Contractor shall be
deemed to be inclusive of all and whatsoever the claims that the Contractor may
have from GIPCL. The Contractor shall not be entitled to claim any amounts which
are not mentioned in the Final Bill and the Contractor shall be deemed to have
waived any claims not mentioned in the Final Bill and shall not be entitled to recover
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
the same from GIPCL subsequent to the submission of the Final Bill on any account
and GIPCL shall stand absolved of all its liabilities in respect of any such claims not
raised by the Contractor in his Final Bill.
B. Validity and Uniformity of Rates
The rates shall be valid for a period of the Contract Period and shall remain unaltered
during the entire Contract Period.
1.1 FAILURE DURING EMERGENCY
During any emergencies, contractor shall have to carry out the work by deploying additional
force within twenty fourhours notice period failing which GIPCL reserves the right to carry
out this work by engaging other party. The expenditure occurred due to such situations, the
Contractor will be held responsible & the same will be recovered from the Contractor’s
monthly bill / any other pending bills along with 10% overhead charges. For repetitive failure
of such work for more than two incidents, GIPCL reserve the right to terminate the entire
contract by forfeiting all pending dues, Security Deposit & other retention money, if any,
after giving 15 days notice to the contractor & this will be binding to the contractor.
1.2 SCOPE OF CONTRACTOR
1. All tools & tackles, tractors, required vehicles to execute the contract will be in the scope
of the contractor. The contractor should ensure for healthiness/working conditions of
tools, tackles & vehicles.
2. All consumable items like cloth, cotton waste, kerosene, gas, diesel, lubricants, etc will
be in the scope of the contractor.
3. All safety/PPEs required during work at site are to be arranged by the contractor.
4. The Contractor shall have to provide necessary facilities including accommodation for
their labor at their own cost.
5. If required , the contractor has to arrange JCB, cultivators, breaker machines & tractor
with trolleys for lifting/shifting the materials of their own.
6. Contractor has to depute their full time experienced overall site-in-charge & independent
Location/Package wise supervisors for work execution as per specification
and for day to day work planning & coordination with respective department’s Engineer-
in-charge, to obtain day to day Location/Package wise work permits, to get daily location
wise work supervision, to record Location/Package wise joint work done
reports/measurements/trip certification, to prepare Location/Package wise separate bills,
to prepare & apply Location/Package wise manpower gate pass, to maintain
Location/Package wise statutory & legal compliance records, etc…
1.3 TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the acts of the
GIPCL, or if defects not readily detected by proper inspection shall develop before the final
completion and acceptance of the whole work, the CONTRACTOR shall forthwith make
good, without compensation, such damage or defects in a manner satisfactory to the
ENGINEER / GIPCL. In no case shall defective or imperfect work be retained even if
contractor followed all technical specifications. GIPCL will not compromise for quality of
materials, works & workmanship.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
The CONTRACTOR shall remain liable under the provisions of this clause notwithstanding
the passing by the GIPCL of any certificate, final or otherwise or the passing of any
1.4 DAILY DIARY AND PROGRESS REPORT:
A daily diary register will be kept in the ENGINEER’S office. The CONTRACTOR will supply
all detailed information every day at 9:00 hours for the day preceding and the diary will be
jointly signed by the ENGINEER and the CONTRACTOR’S representatives, every day in
token of its correctness. A works instruction book, serially numbered will also be kept in the
ENGINEER’S office and all day to day instructions will be given in that book. The
CONTRACTOR’S representative shall report every day to see these instructions and sign
them at the bottom in token of his having seen them.
The CONTRACTOR shall provide all information regarding procurement of materials and
progress of work, as is required by the ENGINEER for compiling the weekly progress
reports. This information shall be provided by contractor at 9:00 hours every Monday, for
the preceding week.
2. PRICE & RATES
The rates quoted by the Bidder in the online Price Bid shall be inclusive of cost of all labor,
supervision, cost of safety supervisor, shifting, transportation, loading, unloading,
equipment, all tools & tackles, safety equipments& PPEs, Royalties, Rents, GST, Stamp
Duties, Central or State Government or Local body or Municipal Taxes or Duties, Turn over
Tax, Work Contract Tax, and / or any other duty / tax, levied by the Central, State
Government or other Public bodies etc…and such other costs that are not specifically
mentioned herein but will be incurred by the contractor for the satisfactory and timely
completion of the work. The quoted rates shall be deemed to include for everything
mentioned in the specification, all leads & lifts, contractor’s overheads & profits for due
performance of the work under this contract and such other costs that are not specifically
mentioned herein but will be incurred by the contractor for the satisfactory and timely
completion of the work. The rates shall also include cost for mobilization / demobilization of
manpower, equipments, materials, etc...
The rates shall be firm for entire contract period and also during extension, if required and
shall not be subject to any escalation in prices, idle charges for labor, machinery, overhead
expenses etc. No price escalation / idle charges shall be due to any reason whatsoever.
The prices / item rates quoted by Bidder shall remain firm till completion of the contract
period and any agreed extensions thereafter and shall not be subject to any other
escalation, idle charges for labor, machinery, overhead expenses etc. No price escalation /
idle charges shall be payable due to delay in work by contractor or due to non-availability of
work front by GIPCL or any reason whatsoever.
The price/rate quoted by CONTRACTOR shall be considering mobilization of all required
manpower, tools & tackles, materials, equipment for timely and satisfactory completion of
all scope of work.
The value and/or quantum of work may be increased or decreased depending upon day to
day requirement. However, item rates remains unchanged and the payment shall be made
as per the actual quantity executed as informed & certified by GIPCL representatives.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
3. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 07 days from the time the intimation
given by GIPCL.
b) Contractor shall provide required separate & independent site supervisors who will be
responsible for supervision and execution of job in specified time with respect to quality,
specifications, site preparations, safety, coordination with GIPCL, issue of work permits,
joint measurements, etc... The supervisors shall coordinate with the Engineer-in-charge of
GIPCL for proper execution of the job.
c) The resources required for execution of above jobs will vary from time to time, hence
contractor shall mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him for the work at
4. QUANTITY OF WORK
The estimated quantities of work required to be carried out by the contractor are as given in
the Section-E (Schedule of Quantity). Estimated and shall vary according to the exigencies
of work at site. However, the rates quoted by Bidder shall remain firm irrespective of any
variation in estimated quantities. Contractors shall engage required nos. of labors along with
required tools & tackles as per work load and emergency situations throughout the contract
period to perform his contractual duties.
In case, contract quantity/amount exhausted before completion of contract period, GIPCL
reserve the rights to increase the quantities or contract amount for successful completion of
entire contract period. Contractor shall responsible to complete the particular job up to entire
satisfaction of Engineer-in-charge. The item rates remain firm & unchanged till completion
of the contract and any agreed extensions thereafter and shall not be subject to any
escalation, idle charges for labor, machinery, overhead expenses etc… for any reason
whatsoever. The quantum of work of individual item may be up to any extent depending
upon requirement. However, item rate remains unchanged. Under this contract, contractor
has to execute all work as per the Plant requirement.
5. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the
company will be applicable for this contract. The same is enclosed herewith. Bidders are
advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at variance with
any provisions of the special conditions of contract, then unless a different intention
appears, the provision of the special conditions of contract shall prevail to the extent of
such repugnancy of variance.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
ANNEXURE-A (Schedule of Quantities and Rates)
Sr. Description of work Qty Unit Rate Total price
No. (Nos) in Rs. in Rs.
1 Per Tube Price for removal & re-erection of 13579 To be Will be
tubes in Unit- 2 (SA Bottom block) and Unit-3 Submitted calculated
(PA Intermediate and SA Bottom block) as per Online by System
scope of work mentioned in tender document
including Mobilization of Manpower and
necessary Consumables tools and tackles.
2 Per Tube Price for removal & re-erection of 300 To be Will be
tubes in Unit-3 (FBHE-4 module block) as per Submitted calculated
scope of work mentioned in tender document Online by System
including Mobilization of Manpower and
necessary Consumables tools and tackles.
3 Sub – Total (Sr. No.1 + Sr. No.2) Will be
4 Applicable GST On Sr. No.3 (Considered 18% as per prevailing rate) 18%
5 Total value including taxes: (Sr. No.3 + Sr. No.4) Will be
1. Price bid shall be submitted in soft form only through n-procure system.
of cost of all manpower, consumables, tools and tackles, transportation Safety and
statutory compliance, etc.
2. GST shall be paid extra at actual as per prevailing rates as declared by Central
Government on submission of documentary evidence.
3. The quantities shown in the price bid are approximate for the contract period and may
vary as per site requirement.
4. The Bidder shall fill the bid documents with utmost care in consonance with the
instructions contained in the bid documents.
5. Payment shall be made on actual quantity executed.
6. Above quantity is tentative and may vary +/- 10% at the time of actual execution.
7. The prices quoted are firm throughout the contract period and will not subject to any
variation whatsoever.
COMPANY SEAL SIGNATURE ……………….…
DESIGNATION …………….…..
COMPANY ………………..….…
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
SECTION – F(ANNEXURES)
TAPH TUBE REPLACMENT WORK IN UNIT-2 AND UNIT- 3 (F.Y.:2027-28)
DESCRIPTION TENDER CONDITIONS
In the event of contractor fails to complete the entire job, LD @3.00% of
Executed work value (Including GST) will be deducted from bills for each day
(Tender CL no. –
delayed beyond the prescribed time schedule. However, the total amount of
delayed beyond the prescribed time schedule. However, the total amount of
18 of Section-A)
the LD shall not exceed 15.00% of the executed value.
2 Mobilization GIPCL will give intimation regarding commencement of shutdown of the unit
Schedule of at least 12 days before the date of shutdown. For pre-shutdown activities,
manpower contractor shall mobilize minimum manpower as mentioned hereunder at
(Tender CL no. – least 05 days before the date of commencement of shutdown. The balance
2.2.1 of Section-A) manpower required during shutdown as mentioned hereunder shall be
mobilized within two days of shutdown.
3 Mobilization of Contractor shall timely mobilize following Minimum Manpower at Site
Manpower for Pre- for pre-shutdown activities as per intimation given by GIPCL.
shutdown Activity Site In charge- 1 No.
(Tender CL no. – Site Supervisor - 1 No..
2.2.2 of Section-A) Safety Supervisor -1No.
Mech. Fitter - 2 Nos.
Rigger - 2 Nos.
Gas Cutters - 1 Nos
Welders - 1 Nos.
Helper - 6 Nos.
Total Minimum Manpower - 15 Nos.
4 Mobilization of Contractor shall timely mobilize following Minimum Manpower per
Manpower during block with requisite skill, experience and knowledge of the work.
shutdown Deployment of manpower shall be within two days after
(Tender CL no. – commencement of shutdown as per intimation given by GIPCL.
2.2.3 of Section-A) Site In charge - 1 No. per Unit ( In day Shift )
Site Supervisor - 1 for each shift = 2 Nos. ( 2X12 hrs Shift)
Safety Supervisor - 1 for each shift = 2 Nos. ( 2X12 hrs Shift)
Mech. Fitter - 2 Nos. for each shift = 4 Nos. ( 2X12 hrs Shift)
Rigger - 3 Nos. for each shift = 6 Nos. ( 2X12 hrs Shift)
Gas Cutters - 7 Nos. for each shift = 14 Nos. ( Shall be arranged during
tubes cutting and duct cutting work)
Welders - 6 Nos. for each shift = 12 Nos. ( Shall be arranged during tube
welding and duct welding work)
Expanders - 4 Nos. for each shift = 8 Nos. ( Shall be arranged during tube
expanding work)
Helper - 10 Nos. for each shift = 20 Nos.
The schedule of manpower deployment will be decided jointly after award of
work order and contractor has to ensure manpower deployment as per
agreed schedule.
The above manpower is minimum manpower to be mobilized at site and
work shall be executed round the clock basis (2X12 hr shift) as per above
minimum manpower allocation. It is to be noted that deputation of above
referred manpower does not relieve contractor from his responsibility of
completing the work within prescribed time schedule in all respect. If actual
work progress as well as deputed manpower is not adequate to match the
schedule, then in such case, contractor has to augment additional required
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
manpower so as to complete the work within prescribed schedule without
IMPORTANT NOTE: GIPCL reserves the right to take suitable actions in
line with terms and conditions of tender / work order in case contractor fails
to take necessary actions to make up the delay OR not responding to
GIPCL's instruction in this regard. This will be treated as failure of contractor
to perform and GIPCL reserves right to get the balance work done with
other available agency at the risk and cost of contractors as per terms and
condition of the tender. (Section – C , clause no.2 of tender Page no.26/59)
5 Cancellation of If contractor fails to perform as per the terms and condition of the work
work order if order/tender and fail to complete the work within the prescribed time limit in
contractor fails to the execution of work in first Unit, then GIPCL reserves the right to get the
perform in one Unit work of other Unit with other available agency.
(won’t be allowed
for Second Unit
(Tender CL no. –
5 of Section-C)
6 De-baring from If the contractor has not performed as per the terms and condition of the work
Participation in order/tender and fails to complete the work in prescribed time limit and if
GIPCL overall delay in the work of respective unit is more than five days, such
(Tender CL no. – contractor will be debarred from the future tender participation at GIPCL for
18 of Section-A) three (03) years of the period from the date of execution of work of respective
7 Accommodation for Accommodation of contractor's manpower is not allowed in the plant
manpower premises. Contractor has to make his own arrangement for the
(Tender CL no. – accommodation and conveyance of his manpower.
19A(16) of Section-
A) and 20(g) of
8 Submission of PBG On acceptance of work order, contractor shall arrange to submit the PBG
(Tender CL no. – strictly within 21 days from the issue of LOI/Work order or before
1 of Section C ) commencement of the work whichever is earlier in line with as per terms and
conditions of the tender/work order. In case contractor fails to submit PBG as
per above GIPCL reserves the right to cancel the work order and his EMD
will be forfeited.
9 Rejection of bids of Bidder has executed the similar work at GIPCL SLPP in the past and its
failed contractors at performance is not found satisfactory, then GIPCL may reject the bid of such
GIPCL. bidder without assigning any reason whatsoever. Decision of GIPCL would
(Tender CL no. – be final for deciding about poor performance in execution of such past
15(15.4) of Section contract.
We are accepting all the above terms and conditions of the Annexure-A and declare no
deviations for all the 09 (Nine) points mentioned hereabove in the Annexure-A
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
PROFORMA FOR CONTRACT SECURITY-CUM-PERFORMANCE GUARANTEE BY
SELLER / CONTRACTOR.
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO: Ranoli, Dist.
Vadodara – 391 350, Gujarat State, India (hereinafter referred to as “The Company/Owner” w
h i c h expressions shall unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has entered into a contract with M/s.
………………………………../ has placed a purchase order on
M/s………………………….(hereinafter referred to as “Contractor(s)/ Seller(s)” which
expression shall unless repugnant to the subject or context includes their legal representatives,
successors and assigns ) for …………………………….on the terms and conditions as set out
inter alia, in the Company’s contract No./ P.O. No.…………..date …………and various
documents forming part thereof hereinafter referred to as the “said contract” which expression
include all amendments, modifications and/ or variations thereto and where as the
Contractor(s)/ Seller(s) has agreed for due execution of the entire contract and guarantees its
performance including any parts executed through any other agencies/ subcontractors.
AND WHEREAS one of the conditions of the “said contract” is that “contractor(s)/seller(s) shall
furnish to the owner a Bank Guarantee from a bank for….% (……….percent) of the total value
of the “said contract” against due and faithful performance of the “said contract” including
performance guarantee obligations of the contractor(s)/seller(s) for execution/ supplies made
under the “said contract.”
2. We …………………………….Bank having its branch office at ……….……..do hereby agree
and undertake to pay the amount due and payable under this guarantee without any demur
merely on a demand from the Company stating that in the opinion of the Company, which is
final & binding, the amount claimed is due by reason of default made by the Contractor(s)/
Seller(s) in performing any of the terms & conditions of the said Contract including defect
liability obligations, in fulfilling the performance guarantee obligation or loss or damage caused
to or would be caused to or suffered by the Company by reason of any breach by the said
Contractor (s)/ Seller(s) of any of the terms & conditions of the contract. Any such demand
made on the Bank by the owner shall be conclusive as regards the amount due and payable
by the Bank under this guarantee. However our liability under this guarantee shall be restricted
to Rs. ……(Rupees………………………only).
3. We undertake to pay to the Company any money so demanded not withstanding any dispute
or disputes raised by the contractor(s)/ Seller(s) in any suit or proceeding pending before any
office, court or tribunal relating thereto our liability under this present guarantee being absolute
and unequivocal. The payment so made by us under this bond shall be a valid discharge of
our liability for payment there under. Our liability to pay is not dependent or conditional on the
owner proceeding against the Contractor(s)/ Seller(s).
4. The guarantee herein contained shall not be determined or affected or suspended by the
liquidation or winding up, dissolution or change of constitution or insolvency of the said
Contractor(s)/ Seller(s) but shall in all respect and for all purposes be binding and operative
until payment of all money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. This guarantee will remain valid up ____________________ days or ______________
whichever is earlier. The Bank undertakes not to revoke this guarantee during its currency
without previous consent of the OWNER/PURCHASER and further agrees that if this
guarantee is extended for a period as mutually agreed between bidder & owner/purchaser, the
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
guarantee shall be valid for a period so extended provided that a written request for such
extension is received before the expiry of validity of guarantee.
6. We ……………Bank further agree with the Company that the company shall have the fullest
liberty without our consent and without affecting in any manner our obligations hereunder to
vary any of the terms and conditions of the said Contract(s)/ Order(s) or to extend the time of
performance by the said Contractor(s) Seller(s) from time to time or to postpone for any time
or from time to time any of the powers exercisable by the Company against the said
Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and conditions relating to
the said Contract(s)/ Order(s) and we shall not be relieved from our liability by reason of any
such variation, or extension being granted to the said Contractor (s) / Seller(s) or for any
forbearance, act or omission on the part of the Company or any indulgence by the Company
to the said Contractor(s)/ Seller(s) or by any such matter or thing whatsoever which under the
law relating to sureties would, but for this provision, have affect of so relieving us.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………….(Rupees…………only) and shall remain in force till..……..Unless a demand or
claim under this Guarantee is made on us within three months from the date of expiry we shall
be discharged from all the liabilities under this guarantee.
Corporate Seal of the Bank By its constitutional Attorney Signature
of duly Authorized person
On behalf of the Bank
With Seal & Signature code
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of appropriate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate Office at PO:
Ranoli, Dist.Vadodara – 391 350, Gujarat State, India (hereinafter called “The Company Owner”
which expression shall unless repugnant to the subject or context includes its legal
representatives, successors and assigns) has issued tender paper vide its Tender
called “the said tender”)to M/s.……………………………(hereinafter called the said Tenderer(s)”
which expression shall unless repugnant to the subject or context includes their legal
representatives, successors and assigns and as per terms and conditions of the said tender, the
tenderer shall submit a Bank guarantee for Rs.………. (Rupees……………..only) towards
earnest money in lieu of cash.
We ……………………………..Bank having its branch office at
2. ……… do hereby undertake to pay the amount due and payable under this guarantee without
any demur, merely on a demand from the Company stating that in the opinion of the company
which is final and binding, the amount claimed is due because of any withdrawal of the tender
or any material alteration to the tender after the opening of the tender by way of any loss or
damage caused to or would be caused or suffered by the Company by reason of any breach by
the said tenderer(s) of any of the terms and conditions contained in the said tender or failure to
accept the letter of Intent Agreement or that the amount covered under this Guarantee is
forfeited. Any such demand made on the Bank by the owner shall be conclusive as regards the
amount due and payable by the Bank under this guarantee, However, our liability under this
guarantee shall be restricted to an amount not exceeding
Rs………………..(Rupees………………..only).
3. We undertake to pay to the Company any money so demanded not withstanding any dispute or
disputes raised by the tenderer (s) in any suit or proceeding pending before any office, court or
tribunal relating thereto our liability under this present guarantee being absolute and
unequivocal. The payment so made by us under this bond shall be a valid discharge of our
liability for payment there under. Our liability to pay is not dependent or conditional on the owner
proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by the
liquidation or winding up, dissolution or change of constitution or insolvency of the said
tenderer(s) but shall in all respect and for all purposes be binding and operative until payment of
all money due or liabilities under the said contract(s)/ Order(s) are fulfilled.
5. We ……………..Bank Ltd. further agree that the guarantee herein contained shall remain in full
force and effect during the period that would be taken for the finalization of the said tender and
that it shall continue to be enforceable till the said tender is finally decided and order placed on
the successful tenderer(s) and or till all the dues of the company under or by virtue of the said
tender have been fully paid and its claims satisfied or discharged or till a duly authorized officer
of the company certifies that the terms and conditions of the said tender have been fully and
properly carried out by the said tenderer (s) and accordingly discharges the guarantee.
6. That the Owner Company will have full liberty without reference to us and without affecting this
guarantee to postpone for any time or from time to time the exercise of any of the power of the
owner under the tender.
7. Notwithstanding anything contained herein before, our liability shall not exceed
Rs…………………. (Rupees…………………………only) and shall remain in force
till…………….. (Date to be filled up shall be 180 days from the date of submission of Bid).
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Date………. ………………………… Bank Corporate
Seal of the Bank By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company Limited,
Surat Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol,
Dist. Surat – 394110 (Gujarat).
We hereby confirm with free consent as under: -
1. The measurements certified in final bill are full and final. We accept all the certified
measurements and no claim related to the measurement is left.
2. The payment certified in that or above referred LoI / contract is full and final. We accept this,
and no claim related to payment is left.
3. The rates of the LoI / contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will not
resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the LoI than those items certified in
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL against
non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works
for above LoI and we indemnify GIPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of
settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above
referred work as per prevailing Minimum wages act. We have also fulfilled all requirements
of the P.F. Act. We have maintained all records necessary as per the statutory requirements.
We hereby indemnify GIPCL from any disputes arising in future related to payment of labors,
Provident Fund, etc.. and confirm that all liabilities of settlements of disputes and their
payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
Signature, Stamp and date.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
(No claim, No arbitration)
Chief General Manager (Thermal)
Gujarat Industries Power Company
Limited, Surat Lignite Power Plant,
Village: Nani Naroli, Ta.
Mangrol, Dist. Surat –
394110 (Gujarat).
Ref: Work Order No.: ,Dated _
We hereby confirm with free consent as under: -
e. The m e a s u r e m e n t s c e r t i f i e d in final bill is full and final. We accept all
measurements and no claim related to the measurement is
2. The payment certified in that or above referred Loll contract is full and final. We accept
this, and no claim related to payment is left.
3. The rates of the Lol I contract and its amendments are firm till completion of contract
and extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we
will not resort to arbitration.
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the Lol than those items certified in
f. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL
against non compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works
for above Lol and we indemnify GlPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities
of settlement of dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out
above referred work as per prevailing Minimum wages act. We have also fulfilled all
requirements of the P.F. Act. We have maintained all records necessary as per the statutory
requirements. We
hereby indemnify GIPCL from any disputes arising in future related to payment of labours,
Provident Fund, etc.. and confirm that all liabilities of settlements of disputes and their
payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after
due recoveries will be received by us.
Signature, Stamp and date.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company’s Letter Head)
I ______________________ on behalf of ………Name of Party/Company………..hereby
confirm, agree and undertake that all the Statutory and Safety Laws and Regulations of the
applicable Authority/ies shall be strictly followed for all types of works at the site during the period
of the Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Litigations
(To be submitted on Company’s Letter Head)
Please Tick (√) whichever is correct option
I ______________________ on behalf of ………Name of Party/Company………..hereby
confirm that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings /
Depts. / Authorities and Govt. of Gujarat supported companies / undertakings /
organizations for the last three( 03) years. There are no ongoing/pending legal matter(s)
with any of the Govt. of Gujarat Undertakings / GoG supported Companies, including
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings / Depts.
/ Authorities and Govt. of Gujarat supported companies / undertakings / organizations for
the last three( 03) years.
Please Tick ( )
If “b” is applicable, please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this
regard shall amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
PARTICULARS OF THE BIDDER
Sr. Particulars Please provide information here.
1. Name of Bidder
2. a. Registered Office Address:
b. Address for Correspondence:
3. Contact Details:
Contact Person Name
Telephone No. :
4. Year of establishment
COMPANY SEAL SIGNATURE …………………
DESIGNATION ……………..
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
ANNEXURE-I (To be read with Eligibility criteria)
Eligibility criteria:
Sr. Eligibility Criteria [in line with clause-5 of Year Rs. In Details Supporting
No Section-A] Lacs Documents
1 Bidder should possess minimum Three years of 2019-20
experience during last seven years in similar 2020-21
nature of jobs - for the replacement of TAPH
tubes in CFBC/PF boiler (lignite or coal fired 2021-22
boiler) with capacity of 70 MW and above. Proof 2022-23
to be attached.
2 Bidder should have average annual turnover of 2023-24
Rs. 20.86 lakh during last three financial years
3 Bidder shall furnish annual audited financial 2023-24
statement duly verified by /from a qualified
Chartered Accountant, being a member of the
institute of chartered accountants of India the 2024-25
certified chartered accountant of the company for
the last three years to demonstrate the financial 2025-26
soundness of the company. The balance Sheet
must be in the name of the company who is
purchasing the tender document. Any type of
MOU for this purpose will not be entertained.
4 The experience should be either of the following: 2019-20
Bidder should have executed minimum
• One work of identical nature, each costing not 2021-22
less than Rs. 41.73 Lakh excluding GST.
Two work of identical nature, each costing not 2023-24
less than Rs. 27.82 Lakh excluding GST.
• Three work of identical nature, each costing not
less than Rs. 20.86 Lakh excluding GST. 2025-26
5 Bidders should possess valid PF number.
6 Bidder should enclose P.F. code allotment letter
along with Labour Licenses and W.C. Policy
copies of previous order.
7 The bidder has to submit PAN of the firm
8 Bidder has to submit GST registration number.
9 Signed and Stamped copy of Tender Document
along with all annexures.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
SCHEDULE OF DEVIATION FROM GENERAL AND TECHNICAL SPECIFICATIONS
All the deviations from the general and technical specifications shall be filled by BIDDER
clause by clause in this schedule.
Sr. No SECTION CLAUSE NO DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s
General/ Technical Conditions of this enquiry. The bidder further confirms that in the events any
other data and information presented in the BIDDER’s proposal and accompanying documents
are at variance with specific requirements laid out in the OWNER’s General /Technical
Specifications, then the latter shall govern and will be binding on the BIDDER for quoted price.
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
[On Rs.300/- Non Judicial Stamp paper with notary]
We, M/s………………………………. having registered office
thereby solemnly state, declare and represent: THAT we have been entrusted a job
year………………………… i.e. from …………………to ……………..vide Work order
… on contract basis by M/s Gujarat Industries Power Company Limited for it’s Surat
Lignite Power Plant at Village Nani-Naroli, Taluka Mangrol, Dist. Surat and we have
undertaken the said work and have completed the same at GIPCL site during
THAT we are fully aware about the applicability of various Labour Legislation and Rules
framed thereunder, to be Contractor & Contract Labours Legislations and Rules framed
thereunder, to the Contractor & Contract Labours, which includes (1) The Contract
Labour (Regulation & Abolition) Act, 1970. (2) The Employee’s Provident Fund &
Miscellaneous Provisions Act, 1952. (3) The Minimum Wages Act, 1948. (4) The
Payment of Wages Act, 1936. (5) The Employee’s Compensation Act,1923. (6) The
Payment of Bonus Act.1965. (7) The payment of Gratuity Act, 1972. (8) The Equal
Remuneration Act, 1976 etc. to our establishment and Gujarat Industries Power
Company Limited.
THAT we have completed the execution of the said contractual job and now our final bill
worth Rs……………../- is pending for payment. We state and declare that we have
complied with all related provisions of the laws as applicable to our establishment and/or
GIPCL during contractual period. In case any liabilities or responsibilities whatsoever
arise in respect of the permanent and/or temporary we shall bear full responsibilities
thereof (including that of sub- contractors) and shall meet with the requirement at any
point of time, if the disputes is raised either by workman or their union or by way of
inspection remarks passed by Govt. Agencies.
THAT in consideration of the aforesaid liabilities due to us and/ or breach of any statutory
provisions under any law, if any we hereby agree to indemnify, save keep harmless the
SURAT LIGNITE POWER PLANT 4x125 MW UNIT- I TO IV: TENDER FOR “REMOVAL AND RE-
ERECTION OF AIR PREHEATER TUBES IN UNIT-2 and UNIT-3 BOILER DURING AOH-2027-28’’
company against all recoveries, claims, damages, costs and expenses which may be
made against or suffered or incurred by Gujarat Industries Power Company Limited,
Baroda/ Nani-Naroli by any reason or consequence of such payment/s and or
Name, Signature & Seal of Proprietor/Owner
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .