| 1 | L1₹36.4 LAccepted-AOC H NO 869 DEVTIWADA CURCHOREM CURCHOREM GOA | CURCHOREM | SOUTH GOA | GOA | 403103 | L1 | Accepted-AOC work awarded | |
| 2 | L2₹36.4 LSame as L1Rejected-Finance GOA | NORTH GOA | GOA | 403203 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S B ENTERPRISES L2 | umeshnaik L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock,ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, stritting and bracing, removal of stump and other deleterious matter, dresing of sides and bottom, providng barricading, danger lightining, guarding etc and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge complete. | 1,004.44 | Cum | 200 ₹2,00,888 Lowest | 228.85 ₹2,29,866.09 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 48 | Cum | 1,900 ₹91,200 | 1,767.8 ₹84,854.4 Lowest |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for :a) Foundations, footings, bases for columns and mass concrete. | 707.88 | Sqm | 350 ₹2,47,758 | 325.66 ₹2,30,528.2 Lowest |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level. | 425.28 | Cum | 5,550.71 ₹23,60,605.95 | 5,449.25 ₹23,17,457.04 Lowest |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge.b) 110mm dia | 144 | RM | 300 ₹43,200 | 290.58 ₹41,843.52 Lowest |
| 6.00 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 102.4 | Kgs | 81 ₹8,294.4 Lowest | 85.12 ₹8,716.29 |
| 7.00 | Providing and fixing in position G.I. hand rail polyster powder coated in external passage, as per approved design shown in drawing including bending hand rail pipe to proper shape in curves with special etc. complete. | 80 | M | 1,702.73 ₹1,36,218.4 Lowest | 2,186.24 ₹1,74,899.2 |
Tender Value
₹45.6 L
EMD Value
₹91,101
Closing Date
13 Nov 2023, 4:00 pmClosed
EE XII WRD
Gogal Margao
Providing flood control measures to the nallah at Karmaliwada near Shree. Paikdev temple in Village Cacora of Curchorem Constituency
2023_WRD_12104_1
WDXII/TECH/F10/15e/2023-24/sr3
Open Tender
Civil Works
Item Rate
90 days
Gogal Margao
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹91,101
13 Feb 2026
31 Oct 2023
16 Nov 2023
31 Oct 2023
13 Nov 2023
31 Oct 2023
Amount
Earthwork in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock,ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, stritting and bracing, removal of stump and other deleterious matter, dresing of sides and bottom, providng barricading, danger lightining, guarding etc and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for :a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge.b) 110mm dia
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Providing and fixing in position G.I. hand rail polyster powder coated in external passage, as per approved design shown in drawing including bending hand rail pipe to proper shape in curves with special etc. complete.
S B ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .