Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Rank 1₹3.8 LAccepted-AOC | ₹3.8 L | Rank 1 | Accepted-AOC Rank 1 |
| 2 | Rank 2₹3.9 LRejected-AOC | ₹3.9 L | Rank 2 | Rejected-AOC Rank 2 |
| Sl No | Description | Qty | Unit | SREEJITH L2 | SUJEESH V L1 |
|---|---|---|---|---|---|
| 1.00Ramp Construction- Various Ward | |||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 18.89 | cum | 406 ₹7,668.53 | 394.03 ₹7,442.44 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 3.15 | cum | 8,281 ₹26,068.59 | 8,033.8 ₹25,290.40 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 35.35 | cum | 9,620 ₹3.4 L | 9,333.23 ₹3.3 L |
| 1.00 | OD319410/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 11.11 | cum | 427 ₹4,744.82 | 414.4 ₹4,604.81 |
| 1.00 | OD319414/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade (Modified DAR 51.2.3) | 5.98 | cum | 871 ₹5,209.45 | 845.67 ₹5,057.95 |
| 1.01 | OD335441/2025-2026:Modified Item 9.5.C. Providing and Laying Reinforced Cement Concrete pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (C) 450 mm dia | 4.4 | metre | 1,354 ₹5,957.60 | 1,314.28 ₹5,782.83 |
Tender Value
Refer Docs
EMD Value
₹10,592
Closing Date
13 Nov 2025, 2:00 pmClosed
AE
LAKKIDI PERUR GRAMA PANCHAYATH
Annual Plan-LPGP 2025-26 Tractor Ramp for Various Paddy Fields (Own Fund -Rs 5,00,000/-)-Pro.No.170/25- 26-General Civil Work
2025_LSGD_819501_6
01/2025-26/AE/LID EW/LPGP/PHASE3
Open Tender
Civil Works - Roads
180 days
LAKKIDI PERUR GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,592
Yes
8 Jun 2026
6 Nov 2025
15 Nov 2025
6 Nov 2025
13 Nov 2025
6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
170-SBD.pdf
Other Document • 2.27 MB
BOQ_1373730.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid