Tender Value
₹9.1 L
EMD Value
₹22,821
Closing Date
28 Sept 2026, 5:00 pmDue tomorrow
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Construction of 11kV Covered Conductor Line using PSC Poles from Mylakonam to Manali and Installation of 100 KVA Transformer at Kaduvakonam under Electrical Section, Kattakada of Electrical Division, Kattakada under Electrical Circle,Katakada
2026_KSEB_866972_1
EE/PMU(KTDA)/ET-18/2026-27 dated 31.08.2026
Open Tender
Electrical Works
Percentage
120 days
Kattakada
6 documents required · 6 mandatory
₹2,242
₹22,821
28 Sept 2026
31 Aug 2026
1 Oct 2026
31 Aug 2026
28 Sept 2026
31 Aug 2026
31 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 1 | No | 2,795.55 | ₹2,795.55 |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 4 | No | 564.55 | ₹2,258.2 |
| 3 | Drilling hole of various sizes on existing Channel/Cross Arm. | 70 | No | 16.73 | ₹1,171.1 |
| 4 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 16 | No | 879.23 | ₹14,067.68 |
| 5 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. | 0.06 | km | 31,957.45 | ₹1,917.45 |
| 6 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. | 1.62 | km | 38,753.95 | ₹62,781.4 |
| 7 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. | 32 | No | 492.41 | ₹15,757.12 |
| 8 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 11 | No | 1,008.86 | ₹11,097.46 |
| 9 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. | 2 | No | 1,589.09 | ₹3,178.18 |
| 10 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. | 1 | No | 7,153 | ₹7,153 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID18.pdf
Tender Documents • 0.35 MB
BOQ_1467827.xls
BOQ • 0.30 MB
Corrigendum2.pdf
PDF • 0.03 MB
Corrigendum1.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .