Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹19.8 L+₹1.6 L (8.76%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Sri Ponkaaliamman Infra Projects L1 | APPU CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Kitchen cum dinning hall at Konthalam mariammankovilpudhur H/o Konthalam | |||||
| 2.00 | Earth werk excavation for foundation in all soils such as red earth ,hard atiff clay soil, stiff black cotton soil, hard redearth,shaIes, murrams, graveI,hard rock not requiring blasting ete complete.,For Foundation | 39.52 | cum | 263 ₹10,393.76 Lowest | 300 ₹11,856 |
| 3.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site includ ng labour for mixing laying,curing etc complete.,For Foundation | 15.92 | cum | 5,507 ₹87,671.44 Lowest | 5,850 ₹93,132 |
| 4.00 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | 57.44 | cum | 120 ₹6,892.8 Lowest | 150 ₹8,616 |
| 5.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 21.28 | cum | 45.85 ₹975.69 Lowest | 50 ₹1,064 |
| 6.00 | Brick work with cement mortar 1:5 mix using II foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc complete. (above basement) | 39.46 | cum | 7,590.5 ₹2,99,521.13 Lowest | 8,100 ₹3,19,626 |
| 7.00 | Reinforced cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing, laying,curing etc complete.,a) Below Basement | 16.82 | cum | 9,550 ₹1,60,631 Lowest | 10,600 ₹1,78,292 |
| 8.00 | Supplying and fabrication,pIacing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of stee! and binding wire etc. | 2.36 | MT | 91,924.5 ₹2,16,941.82 Lowest | 98,000 ₹2,31,280 |
| 9.00 | Supplying and erection centering for sides and soft inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 54.49 | sqm | 547.4 ₹29,827.83 Lowest | 580 ₹31,604.2 |
| 10.00 | For column | 102.27 | sqm | 1,095 ₹1,11,985.65 Lowest | 1,250 ₹1,27,837.5 |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
29 Aug 2025, 3:00 pmClosed
Block Development Officer(BP), Kodumudi
Block Development Office(BP), Kodumudi
Construction of a dinning hall with a kitchen for the community hall at Mariamman Temple, Konthalam Panchayat in MPLAD 2025-26
2025_RDTN_596614_1
2763/2025/A2
Open Tender
Civil Works - Buildings
Item Rate
Block Development Office(BP), Kodumudi
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹18,500
4 Nov 2025
23 Aug 2025
29 Aug 2025
23 Aug 2025
29 Aug 2025
23 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_712980.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .