| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹5.4 L+₹1,185 (0.22%)Accepted-Finance 71 MOHALLA KALA KUAN AMROHA AMROHA AMROHA UTTAR PRADESH 244221 | AMROHA | UTTAR PRADESH | 244221 | L2 | Accepted-Finance Qualified | |
| 3 | L3₹5.7 L+₹29,720 (5.55%)Accepted-Finance | L3 | Accepted-Finance Qualified | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
31 May 2024, 1:00 pmClosed
S.E. EDC AMROHA
S.E. EDC AMROHA JOAY ROAD AMROHA.
For the Work of Business Plan 2024-25 for Additional Installation Transformer Works Under EDD-I Gajraula.
2024_PVVNL_923550_3
T-97/2023-24/EDCA
Open Tender
Electrical Works
Lump-sum
60 days
S.E. EDC AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E. EDC AMROHA
₹7,000
12 Jun 2024
25 May 2024
31 May 2024
25 May 2024
31 May 2024
25 May 2024
25 May 2024 - 31 May 2024
Amount
Supply of following material including freight and insurance charges.
Stay set Complete
Top Channel
Dropper Channel
MS T of Channel
MS Angle for T/F Base Angle
Holding clamp with Nut & bolt
Earthing Complete
Nut Bolt and washer
Clamp for Pole
Clamp for LT
Suspention Clamp with I huck
PG Clamp
Dead end clamp with I huck
PRC Clamp
The following material Erection/ Fixing & laying as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Its includes the cost of labour,T&P & safe cartage etc.required all acessaries for proper completion of work.
25 KVA TF
100 KVA TF
250 KVA TF
P.C.C. Pole 8.5 mtr
STP SP-55 11 mtr. Long
ACSR Weasel Conductor
ACSR Rabbit Conductor
LT ABC Cable 3x95+1x70+1x16
LT Cable 1x240 sqmm
LT Cable 1x120 sqmm
11 KV Disc Insulator
11 KV Disc fitting
11 KV Polymeric Insulator
3 Phase Distribution Box
11 kv TP MO
11 KV 3-Phase D.O. Fuse Set
Stay set Complete
Top Channel
Dropper Channel
MS T of Channel
MS Angle for T/F Base Angle
Holding clamp with Nut & bolt
Concreting 'Stay
Earthing Complete
Concreting of pole
Nut Bolt and washer
Clamp for Pole
Clamp for LT
11/.40 KVA TF Plinth suitable upto 250 KVA as per RESSPO Drawing with proper fancing 3500x3500x2200mm in frame (including plinth and fancing material).
Water level Pipe Earthing of 250 KVA Transformers with all required material complete in all respect.
Chemical Earthing of 100 KVA Transformers with all required material complete in all respect.
Suspention Clamp with I huck
PG Clamp
Dead end clamp with I huck
PRC Clamp
Sparsh Enterprises
Cosmic Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .