Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | -0.21% | ₹9.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.9 LAdmitted-Finance | -0.05% | ₹9.9 L | L2 | Admitted-Finance |
| 3 | L3₹9.9 LAdmitted-Finance | -0.02% | ₹9.9 L | L3 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,746
Closing Date
28 Jul 2026, 6:00 pmClosed
A.M.A. BALLIA
ZILA PANCHAYAT BALLIA
Gram chhotki bhi Shahar mein ghoda Koi tola se Kali Mandir ke taraf nali Nirman ka karya
2026_UPPRD_1168289_24
329-ZPBA-2026-27Dte-06.07.26
Open Tender
Civil Works
Percentage
90 days
BALLIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,165
A.M.A.
₹19,746
31 Jul 2026
10 Jul 2026
29 Jul 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.S.I No-251 | 135.36 | cum | 190 | ₹25,718.4 |
| 2 | PCC Grade M-10
Plain cement concrete M-10 in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and complacted by vibration including curing for 14 days. foundation | 15.04 | cum | 7,617 | ₹1,14,559.68 |
| 3 | Filling in foundation trenches as per drawing & technical specification clause 305.3.9 | 27.07 | cum | 105.78 | ₹2,863.46 |
| 4 | RCC Grade M25
RCC Grade M25(Using Concrete Mixer) | 61.12 | cum | 9,246 | ₹5,65,115.52 |
| 5 | Supplying, fitting and placing TMT bar reinforecement in super-structure complete as per drawing and technical specifications Clauses | 3.84 | M.T | 70,789 | ₹2,71,829.76 |
| 6 | S/F of Signboard & Photography including supply of all materials, labour T & P etc required for proper completion of the work. | 1 | Job | 7,000 | ₹7,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2191530.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].