Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98,064.50Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.1 L+₹8,634.70 (8.81%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Prebin S.V L1 | Joji L2 |
|---|---|---|---|---|---|
| 1.00CLEANING KILLI RIVER | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 369.01 | sqm | 14.59 ₹5,383.9 Lowest | 15.88 ₹5,859.93 |
| 1.00 | OD2820/2026-2027:Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes,electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes, kitchen utensils, leafs and other dumped wastes repeatedly using any type of departmental/contractors own machinery including disposal of removed materials by the contractor at his own means without causing damage to environment and society including all leads lifts etc complete as per the direction of departmental officers in charge. | 563.07 | sqm | 60.13 ₹33,857.4 Lowest | 65.42 ₹36,836.04 |
| 1.00 | OD2819/2026-2027:Excavation of deposited silt and other waste materials like glass, wood etc deposited and forming delta, by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil | 201.29 | cum | 206.7 ₹41,607.47 Lowest | 224.9 ₹45,271.02 |
| 1.00 | OD2818/2026-2027:Hire charges of Pontoon for using of excavator to remove deltas inside water course as per the direction of engineer in charge | 32 | hour | 273.49 ₹8,751.68 Lowest | 297.58 ₹9,522.56 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 80.52 | cum | 105.12 ₹8,464.05 Lowest | 114.38 ₹9,209.65 |
Tender Value
₹1.2 L
EMD Value
₹3,124
Closing Date
27 Jul 2026, 5:00 pmClosed
AEE ISSD Tvpm
o/o the AEE ISSD Tvpm
GENERAL-Emergency Monsoon Preparedness 2026-Urgent removal of blockages, deltas, solid wastes and strengthening of most vulnerable damaged bunds of Killi River Between Karakulam Bridge to Eighth Mile Stone Bridge-General Civil Work
2026_Irrig_862125_1
IRR/IA/TR/2627/2026_5_4_3/1
Open Tender
Civil Works - Others
Item Rate
90 days
Karakulam
Please refer tender documents
11 documents required · 11 mandatory
₹555
Yes
₹3,124
Yes
29 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
27 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CLEANING KILLI RIVER | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 0.2 | sqm | - | - |
| 1.002 | OD2820/2026-2027:Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes,electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes, kitchen utensils, leafs and other dumped wastes repeatedly using any type of departmental/contractors own machinery including disposal of removed materials by the contractor at his own means without causing damage to environment and society including all leads lifts etc complete as per the direction of departmental officers in charge. | - | sqm | - | - |
| 1.003 | OD2819/2026-2027:Excavation of deposited silt and other waste materials like glass, wood etc deposited and forming delta, by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil | 0.6 | cum | - | - |
| 1.004 | OD2818/2026-2027:Hire charges of Pontoon for using of excavator to remove deltas inside water course as per the direction of engineer in charge | - | hour | - | - |
| 1.005 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.2 | cum | - | - |
stage.html
html • 0.02 MB
finance_1458087.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1458087.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .