| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹2.2 L+₹19,788.50 (9.68%)Rejected-AOC | L2 | Rejected-AOC Lowest 2nd | |
| 3 | L3₹2.6 L+₹52,486 (25.7%)Rejected-AOC MOHALLA DESHNAGAR PILIBHIT | PILIBHIT | PILIBHIT | UTTAR PRADESH | L3 | Rejected-AOC Lowest 3rd | |
| 4 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Others-Tender cost not deposit |
Tender Value
₹2.6 L
EMD Value
₹2,570
Closing Date
14 Aug 2023, 12:00 pmClosed
SE EDC Pilibhit
Near Roadways Pilihbhit
For 11 KV LT Line Pole shifting from Richaula to Gajraula baya mala colony and Pilibhit Puranpur road to Kanja Sarriya baya Ajitpur Sahrai under EDD Pilibhit in fully deposit scheme for road widening.
2023_MVVNL_823593_2
T-08/EDCP/2023-24
Open Tender
Miscellaneous Works
Item Rate
90 days
Pilibhit
As per tender form
3 documents required · 3 mandatory
₹1,180
SE EDC
₹2,570
16 Feb 2024
7 Aug 2023
14 Aug 2023
7 Aug 2023
14 Aug 2023
7 Aug 2023
Amount
Carriage of following line material from Store centre Pilibhit to work site for 11KV Line/Pole shifting as per line chart from Richaula to Gajraula baya mala colony under EDD-Pilbhit including measuring, weighing, loading, unloading at both ends and proper stacking at safe site . (Distance up to 30 Km.)
PCC Pole 8.5Mtr. Long
ACSR weasel conductor
Cable LT ABC (1*16+1*25) SQMM
Other line material as top channel-1 no., M.S T off channel-1no., M.S angle 75*75*6*2028 mm-2 nos., G.I. Wire 6 SWG-16 kg., stay set 16*1800-10 nos, stay clamp-10 nos., earth rod 2500*20 – 8 nos, stay wire 7/10 SWG-50 kg, 11 KV comp. poly. disc insulator- 6 nos, 11 KV comp. Poly. pin insulator-3 nos., and LT distribution box 1 phase-7nos.
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of PCC pole 8.5 mtr long.
Double pole structure on PCC. Pole 8.5mtr long complete with bracing for 11 kv H.T line.
Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
Laying and sagging of 3 phase ACSR Weasel conductor from double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect.
Laying of LT ABC (1*16+1*25) SQMM for 11 KV L.T Line.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Fixing of 1 Phase distribution box on pole including proper clamping. All material would be provided by firm.
Dismantling of exixting cable/conducting of line & its related all accessaries etc. and received back material carriage from work site to store centre, Pilibhit with loading & unloading and proper stacking. (Distance up to 30 Km.) Complete work in all respect.The scrap approximate 0.5 Qtl.
Carriage of following line material from Store centre Pilibhit to work site for 11KV Line/Pole shifting as per line chart from Pilibhit Puranpur road to Kanja Sarriya baya Ajitpur Sahrai under EDD-Pilbhit including measuring, weighing, loading, unloading at both ends and proper stacking at safe site . (Distance up to 30 Km.)
PCC Pole 8.5Mtr. Long
ST Pole 11 Mtr. Long
ACSR weasel conductor
Cable LT ABC (1*16+1*25) SQMM
Other line material as top channel-3 nos., M.S T off channel-4 nos., M.S angle 75*75*6*2028 mm-4 nos., G.I. Wire 6 SWG-65 kg., stay set 16*1800-14 nos, stay clamp-14 nos., earth rod 2500*20 – 26 nos, stay wire 7/10 SWG-70 kg, 11 KV comp. poly. disc insulator- 21 nos, 11 KV comp. Poly. pin insulator-58 nos., 11 KV F-clamp for PCC Pole-16 nos.,Cross ARMS V type 11Kv-16 nos.,Cross ARM holding clamp-16 nos and LT distribution box 1 phase-8nos.
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of PCC pole 8.5 mtr long.
Single support ST Pole 11 mtr. long complete work in all respect for road crosing.
Double pole structure on PCC. Pole 8.5mtr long complete with bracing for 11 kv H.T line.
Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
Laying and sagging of 3 phase ACSR Weasel conductor from double pole at 33/11 KV substation to double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect.
Laying of LT ABC (1*16+1*25) SQMM for 11 KV L.T Line.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Fixing of 1 Phase distribution box on pole including proper clamping. All material would be provided by firm.
Dismantling of exixting cable/conducting of line & its related all accessaries etc. and received back material carriage from work site to store centre, Pilibhit with loading & unloading and proper stacking. (Distance up to 30 Km.) Complete work in all respect.The scrap approximate 1.70 Qtl.
BARKATI ASSOCIATES
POWER AND POWER CONSULTANTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .