| 1 | L1₹1.2 CrAccepted-Finance NO 3 MEENATCHIPURAM THIRUPPATHURAI PERUGAMANI TRICHY 639115 | TIRUCHIRAPPALLI | TAMIL NADU | 639115 | ₹1.2 Cr | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹1.3 Cr+₹5.7 L (4.57%)Rejected-Finance NO 152 E V R NAGAR SRIRANGAM TIRUCHIRAPPALLI 5 | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | ₹1.3 Cr+₹5.7 L (4.57%) | L2 | Rejected-Finance Quoted L2 Rate |
| Sl No | Description | Qty | Unit | SVT CONSTRUCTIONS L2 | KALINGA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road from Moongilpatti road in Unniyur Panchayat ., (0/0-3/320 -PUR-R28) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 4,665.6 | Sqm | 6.5 ₹30,326.4 | 5.94 ₹27,713.66 Lowest |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 3,585.6 | Cum | 140 ₹5,01,984 | 131.29 ₹4,70,753.42 Lowest |
| 3.00 | Picking the existing mettaled surface and sectioning including all labour charges etc, complete. | 4,150 | Sqm | 25 ₹1,03,750 | 21.84 ₹90,636 Lowest |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 0/0-1/0 | 337.5 | Cum | 380 ₹1,28,250 | 363.41 ₹1,22,650.88 Lowest |
| 5.00 | side berms KM - 1/0-2/0 | 337.5 | Cum | 385 ₹1,29,937.5 | 377.09 ₹1,27,267.88 Lowest |
| 6.00 | side berms KM - 2/0-3/0 | 337.5 | Cum | 400 ₹1,35,000 | 390.77 ₹1,31,884.88 Lowest |
| 7.00 | side berms KM - 3/0-3/320 | 108 | Cum | 400 ₹43,200 | 390.77 ₹42,203.16 Lowest |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 567.19 | Cum | 2,100 ₹11,91,099 | 2,029 ₹11,50,828.51 Lowest |
| 9.00 | side berms KM - 1/0-2/0 | 562.5 | Cum | 2,100 ₹11,81,250 | 2,030.14 ₹11,41,953.75 Lowest |
| 10.00 | side berms KM - 2/0-3/0 | 562.5 | Cum | 2,100 ₹11,81,250 | 2,030.14 ₹11,41,953.75 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
16 May 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening the road from Moongilpatti road, Thottiyam Block, Tiruchirappalli District,Pkg37
2025_RDTN_553087_37
DIPR/1714/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
DRDA Tiruchirappalli
12 Aug 2025
3 May 2025
16 May 2025
3 May 2025
16 May 2025
3 May 2025
9 May 2025
Amount
Strengthening the road from Moongilpatti road in Unniyur Panchayat ., (0/0-3/320 -PUR-R28) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 0/0-1/0
side berms KM - 1/0-2/0
side berms KM - 2/0-3/0
side berms KM - 3/0-3/320
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
side berms KM - 1/0-2/0
side berms KM - 2/0-3/0
side berms KM - 3/0-3/320
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
side berms KM - 1/0-2/0
side berms KM - 2/0-3/0
side berms KM - 3/0-3/320
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
side berms KM - 1/0-2/0
side berms KM - 2/0-3/0
side berms KM - 3/0-3/320
BITUMINOUS MACADAM 50 MM THICK of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
side berms KM - 1/0-2/0
side berms KM - 2/0-3/0
side berms KM - 3/0-3/320
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Providing for Road Marker/ Road stud with lens Reflector
Providing for 60 cm Circle (MANDATORY Sign Board)
Providing for 60 cm Equilateral triangle cautionary signboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
SVT CONSTRUCTIONS (BID ID -1341315)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .