Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.1 Laccepted-aoc | ₹4.1 L | accepted-aoc |
Tender Value
₹3.9 L
EMD Value
₹3,914
Closing Date
24 Apr 2026, 4:30 pmClosed
TENALI MUNICIPALITY
Tenali
Restoration of CC Patches at various places from 11 to 15 wards in Tenali Municipality under Municipal General funds
924483
18/2025-26/General Funds
OPEN - NCB
Civil Works
GUNTUR
7 documents required · 5 mandatory · 2 optional
₹139
₹3,914
9 May 2026
18 Apr 2026
18 Apr 2026
Engaging of JCB on hire basis including fuel,Driver & Helper wages etc., complete for Dismantling of CC Culvert Approaches and Earthwork in Tenali Municipality excluding all taxes.(Rates adopted as per TS No
Earthwork in excavation for roads as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Collection and spreading of Sand including cost and conveyance of all materials to work site all labour charges and stacking to departmental guage etc., complete as per SS - for berms
Plain Cement concrete (1:4:8) using 40 mm HBG metal with concrete mixture including cost and convayance of all materials, labour charges, machine mixing charges, and curing charges etc., complete as per S.S.
Vibrated cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, ting, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification and as directed by the Engineer-in-Charge for C.C Pavement.
Supply of Bitumenious hot sealing compound (Grade 'A' ISI) / polysulphide and sealing the joints including cost and conveyance of all material etc., including labour charges for placing in position for contraction joints at-4.50 M interval / for expansion joints/ for longitudinal joints Os per MORTH specification No. 602
Carting away the surplus excavated earth from the work site with a lead of 2.00 Km beyond initial lead including loading, unloading and conveyance but exclding stacking charges etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
10.NIT, Schedule Part - 2.xls
TENDER_DOCUMENT • 0.05 MB
10.Tender-Doc_-_Corrected.doc
TENDER_DOCUMENT • 0.49 MB
CC PATCHES 11-15.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .