| 1 | L1₹4.5 LAccepted-AOC M K ENGINEERS AND CONTRACTORS PARASSALA TVPM | PARASSALA | THIRUVANANTHAPURAM | KERALA | L1 | Accepted-AOC L1 |
Tender Value
₹5.0 L
EMD Value
₹12,380
Closing Date
10 Jun 2021, 4:00 pmClosed
Deputy Director, Hydrology Subdn., Tvpm
Deputy Director, Hydrology Subdn., Jalavijnanabhavan,6th Floor,Ambalamukku,Tvpm
MHIS-Reconstruction of damaged portion of compound wall construction of hump at the entrance and exit gates of Jalavijnanabhavan
2021_Irrig_424477_1
01/DD/HYD/TVPM/2021-22
Open Tender
Civil Works - Others
Item Rate
120 days
Ambalamukku
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,120
₹12,380
23 Nov 2021
31 May 2021
14 Jun 2021
31 May 2021
10 Jun 2021
31 May 2021
Amount
Detailed estimate
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od26084/2020_2021/IDRB : Engaging man mazdoor for clearing the deposited waste on the west side of Jalavijnanabhavan Building.
od26085/2020_2021/IDRB : Lifting,conveying and stacking the existing RCC covering slabs of any thickness on top of drain including all labour charges and miscellaneous expenses etc. complete
od26086/2020_2021/IDRB : Clearing existing side drain by manual means and depositing the waste materials for a minimum distance of 5 km lorry conveyance as per clause 305 etc. complete
od26087/2020_2021/IDRB : Lifting, conveying and fixing the existing stacked RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous etc complete
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
6.3.1 : Brick work with common burnt clay machine moulded perforated bricks of classdesignation 12.5 conforming to IS: 2222 in superstructure above plinth level up tofloor five level in cement mortar 1:6 (1 cement : 6 coarse sand):With F.P.S. ( non modular ) bricks
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.33.2 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Raised and cut pointing
60.2.1 : EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
60.7.9 : RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
Bidder Name
MANOJ KUMAR S (M.K.Engineers And Contractor)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .