Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.5 LAccepted-AOC | 1 | Accepted-AOC 1st Lowest bidder | |
| 2 | 2₹22.6 L+₹11,458.84 (0.51%)Rejected-AOC | 2 | Rejected-AOC 2nd Lowest bidder | |
| 3 | 3₹22.7 L+₹17,000.80 (0.76%)Rejected-AOC | 3 | Rejected-AOC 3rd Lowest bidder | |
| 4 | 4₹23.1 L+₹64,289.19 (2.86%)Rejected-Finance | 4 | Rejected-Finance 4th lowest bidder | |
| 5 | 5₹24.7 L+₹2.2 L (9.56%)Rejected-Finance PUTHUSSERIPADY HOUSE KALYANAPATTA KANNIMARI P O 678103 | KANNIMARI | PALAKKAD | KERALA | 678103 | 5 | Rejected-Finance 5th lowest bidder |
Tender Value
₹28.6 L
EMD Value
₹42,850
Closing Date
15 Jul 2021, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer Irrigation Division Chittur Chittur College P O 678104
Modernization of Tail End Field channel
2021_Irrig_428917_1
02/ET/EE/CTR/2021-22
Open Tender
Civil Works - Canal
Item Wise
180 days
Kambrathchalla
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,940
Yes
₹42,850
Yes
16 Sept 2021
6 Jul 2021
21 Jul 2021
6 Jul 2021
15 Jul 2021
6 Jul 2021
6 Jul 2021 - 9 Jul 2021
Amount
Rectification Works To Tail End Filed Channel
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
manoj.k
SURESH M
SIVADAS C
TOMEY RAPHAEL
MURALEEDHARAN.M
RAJALEKSHMY B.
Bidder Name
POULOSE VARGHESE
TOMEY RAPHAEL
SIVADAS C
manoj.k
MURALEEDHARAN.M
RAJALEKSHMY B.
SURESH M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_608769.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .