Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 LRejected-AOC EETTICKAL HOUSE POONJAR SOUTH P O KOTTAYAM | KOTTAYAM | KERALA | 686582 | ₹8.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹8.4 LRejected-Finance | ₹8.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | AKHIL VS L1 | JITHU JAICK L3 | E M MADHU L2 |
|---|---|---|---|---|---|---|
| 1.00construction of compund wall | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.06 | cum | 250 ₹5,265 | 400 ₹8,424 | 350 ₹7,371 |
| 1.00 | OD414592/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 21.06 | cum | 3,500 ₹73,710 | 5,700 ₹1.2 L | 5,500 ₹1.2 L |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 82.76 | cum | 7,000 ₹5.8 L | 7,900 ₹6.5 L | 7,750 ₹6.4 L |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.38 | cum | 8,500 ₹28,687.50 | 9,000 ₹30,375 | 10,500 ₹35,437.50 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 151.88 | kilogram | 95 ₹14,428.13 | 105 ₹15,946.88 | 100 ₹15,187.50 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 4.5 | sqm | 750 ₹3,375 | 900 ₹4,050 | 750 ₹3,375 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.16 | cum | 9,000 ₹10,467 | 9,500 ₹11,048.50 | 7,500 ₹8,722.50 |
Tender Value
₹8.5 L
EMD Value
₹21,186
Closing Date
3 Mar 2026, 6:00 pmClosed
Asst. Engineer LID andEW Section Adoor Municipalty
Asst. Engineer LID andEW Section Adoor Municipalty
496/26 PROVIDING BASIC FACILITIES TO CREMATORIUM IN WARD 1
2026_LSGD_840214_5
P1/3606/25 Phase 5_26GENitem
Open Tender
Civil Works - Buildings
270 days
LID and EW Section Adoor Mnicipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,870
Yes
₹21,186
Yes
7 May 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
construction of compund wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD414592/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_1416319.xls
BOQ • 0.24 MB
viewsbd.pdf
Tender Documents • 2.00 MB
F.pdf
Tender Documents • 2.69 MB
Download all tender documents and submit your bid