Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹2.5 L+₹1,409.79 (0.57%)Rejected-AOC | ₹2.5 L+₹1,409.79 (0.57%) | L2 | Rejected-AOC Second bidder |
| 3 | L3₹2.7 L+₹17,514.86 (7.05%)Rejected-Finance ELID EWS SECTION ASSISTANT ENGINEER KANJIRAPUZHA GRAMAPANCHAYAT POTTASSERY P O | PATHANAMTHITTA | KERALA | 689694 | ₹2.7 L+₹17,514.86 (7.05%) | L3 | Rejected-Finance Third bidder |
| 4 | L4₹3.3 L+₹77,323.29 (31.1%)Rejected-Finance ARUVEETTIL HOUSE KARUVAMBRAM PO ACHIPILAKKAL MANJERI 3 MALAPPURAM 676123 | MANJERI | MALAPPURAM | KERALA | 676123 | ₹3.3 L+₹77,323.29 (31.1%) | L4 | Rejected-Finance Fourth bidder |
| Sl No | Description | Qty | Unit | C J JOY L2 | RAMESH KUMAR T G L1 | Favas Aruveettil L4 | SULAIMAN M K L3 |
|---|---|---|---|---|---|---|---|
| 1.00Jungle clearance and Silt removal | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 7,642.4 | sqm | 13 ₹99,351.2 Lowest | 13.29 ₹1,01,567.5 | 13 ₹99,351.2 Lowest | 14.23 ₹1,08,751.35 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,628 | sqm | 7 ₹32,396 | 6.77 ₹31,331.56 Lowest | 8 ₹37,024 | 7.25 ₹33,553 |
| 1.00 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 12 | hour | 380 ₹4,560 | 377.41 ₹4,528.92 Lowest | 1,575 ₹18,900 | 403.92 ₹4,847.04 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 259.88 | cum | 192 ₹49,896 | 188.32 ₹48,939.66 Lowest | 268 ₹69,646.5 | 201.54 ₹52,375.21 |
| 1.00 | OD35045/2025-2026:Engaging Hitachi 0.36cum to 0.86cum (Excavator chain type) including all cost of hier charges, Labour, fuel and lubricants for removing silt, debris, weeds and other major obstructions from stream bed and cleaning the stream shore neatly including disposal of waste materials by mechanical means to the adjacent stream bank or as directed by engineer in charge for all leads and lifts involved machinery out turn: 15cum/hour | 43 | hour | 1,480 ₹63,640 | 1,443.39 ₹62,065.77 Lowest | 2,345 ₹1,00,835 | 1,544.69 ₹66,421.67 |
Tender Value
₹3.4 L
EMD Value
₹8,499
Closing Date
29 Jul 2026, 2:00 pmClosed
Assistant Executive Engineer
KPIP Sub division No. 2 Kalladikode
DEPOSIT KPIP DEPOSIT 2025 26 Jungle clearance and silt removal for LBMC between Ch. 31 500km to Ch. 33 000km. General Civil Work
2026_Irrig_861515_1
IRR/PI/TR/7242/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
150 days
Kalladikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹750
Yes
₹8,499
Yes
24 Aug 2026
20 Jul 2026
31 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Jungle clearance and Silt removal | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1 | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.005 | OD35045/2025-2026:Engaging Hitachi 0.36cum to 0.86cum (Excavator chain type) including all cost of hier charges, Labour, fuel and lubricants for removing silt, debris, weeds and other major obstructions from stream bed and cleaning the stream shore neatly including disposal of waste materials by mechanical means to the adjacent stream bank or as directed by engineer in charge for all leads and lifts involved machinery out turn: 15cum/hour | - | hour | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1456997.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
preliminaryagreement.pdf
Tender Documents • 0.30 MB
BOQ_1456997.xls
BOQ • 0.30 MB
FormatIntegritypact.pdf
Tender Documents • 0.20 MB
Formoftender.pdf
Tender Documents • 0.07 MB
Affidavit.pdf
Tender Documents • 0.10 MB
sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .