Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance PLOT NO 06 O 3891 PRABASINI BHAVAN SARASWATI BIHAR DRDA LANE AT LENKUDIPADA PO NAYAGARH ODISHA PIN 752070 | NAYAGARH | NAYAGARH | ODISHA | 752070 | ₹2.3 Cr | L1 | Accepted-Finance Qualified |
| 2 | L2₹2.8 Cr+₹52.7 L (22.8%)Rejected-Finance AT DHELUAN PO LAING KANSBAHAL PS RAJGANGPUR DIST SUNDARGARH PIN 770034 | RAJGANGPUR | SUNDARGARH | ODISHA | 770034 | ₹2.8 Cr+₹52.7 L (22.8%) | L2 | Rejected-Finance Dis-Qualified |
| 3 | L2₹2.8 Cr+₹52.7 L (22.8%)Rejected-Finance | ₹2.8 Cr+₹52.7 L (22.8%) | L2 | Rejected-Finance Dis-Qualified |
| 4 | L2₹2.8 Cr+₹52.7 L (22.8%)Rejected-Finance | ₹2.8 Cr+₹52.7 L (22.8%) | L2 | Rejected-Finance Dis-Qualified |
| 5 | L2₹2.8 Cr+₹52.7 L (22.8%)Rejected-Finance | ₹2.8 Cr+₹52.7 L (22.8%) | L2 | Rejected-Finance Dis-Qualified |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
10 Apr 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, SUNDARGARH
Construction of Thasil Office building at Lephripada_BUILDING
2026_CERWI_127656_1
RWCCESNG-41 of 2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
Sundargarh
3 documents required · 3 mandatory
₹10,000
₹2.8 L
Yes
30 Jul 2026
26 Mar 2026
13 Apr 2026
26 Mar 2026
10 Apr 2026
26 Mar 2026
26 Mar 2026 - 9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismentaling Brick or stone masonary in lime or cement mortar under 3m height including stacking the | - | cum | - | - |
| - | Earth work excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of foundation including cost of all labour required for the work etc complete with all other T&P required for the work and stacking the excavated materials away from working area as directed by the Engineer-in-charge including 1% cess. | - | cum | - | - |
| - | Ground Floor | - | cum | - | - |
| - | Supplying and filling in foundation and plinth with sand well watered & rammed with cost ,conveyance, royality & taxes of all materials and labour required for the work as per specification and including 1% cess as per direction of the Engineer-in-Charge. | - | cum | - | - |
| - | Ground Floor | - | cum | - | - |
| - | Filling in foundtaion and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge. | - | cum | - | - |
| - | Ground Floor | - | cum | - | - |
| - | Earth work for site development with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement | - | cum | - | - |
| - | Approach Road | - | cum | - | - |
| - | Cement Concrete of proportion(1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | - | cum | - | - |
stage.html
html • 0.16 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.64 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_586508.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .