Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63,723.36Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹65,297.89+₹1,574.53 (2.47%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹1,593
Closing Date
6 Feb 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
assistant engineer
assistant engineer office, Payam Grama Panchayath
Project No287/2024-Construction of Community soak pit at Payam G U P school
2024_LSGD_650844_4
7
Open Tender
Civil Works - Others
Item Rate
Payam Grama Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,593
Yes
20 Mar 2024
29 Jan 2024
8 Feb 2024
29 Jan 2024
6 Feb 2024
29 Jan 2024
Amount
soak pit construction
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD291057/2023-2024:Laterate masonry with neatly dressed laterate stone of size 30x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.18.9.7.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.63 mm dia 4 Kgf/cm2
50.18.9.20.1:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Elbow
50.18.9.20.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 63 mm dia Bend
23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges
23.6:Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit,over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer -in-Charge
23.7:Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer-in-charge.
OD309019/2023-2024:Supplying filling spreading & levelling char coal in recharge pit in the required thickness, for all leads & lifts etc. complete as per direction of Engineer in charge
JAYAN M
Bidder Name
Sudheesh N M
JAYAN M
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1001089.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .