Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
18 Mar 2021, 4:00 pmClosed
ER M A ZARAGAR EXECUTIVE ENGINEER PHE JSD RWSD GBL
OFFICE OF THE EXECUTIVE ENGINEER PHE JSD RWSD GBL H Q DUDERHAMA GBL
Augmentation of water supply to Khan Mohalla and Killthul habitations of WSS Ramwari and WSS Balti-Kullan-B respectively by way of replacement of wornout pipes Phase I under Tribal Action Prog
2021_PHE_119352_3
E NIT NO 45/PHE/JSD/RWSD/CIVIL OF 2020-21
Open Tender
Civil Works - Water Works
Item Rate
10 days
GANDERBAL KHAN MOHALLA AND KILLTHUL
Please refer Tender documents.
5 documents required · 5 mandatory
₹250
Yes
EXECUTIVE ENGINEER PHE JSD RWSD GBL/SGR
Yes
22 Mar 2021
5 Mar 2021
20 Mar 2021
6 Mar 2021
18 Mar 2021
6 Mar 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge
In all kinds of soils
Ordinary rock
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :
15 mm to 40 mm nominal bore.
Above 40 mm nominal bore
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
65 mm dia G.I. Pipes
50 mm dia G.I. Pipes
40 mm dia G.I. Pipes
25 mm dia G.I. Pipes
20 mm dia G.I. Pipes
Filling available excavated earth excld. rock in trenches, plinth, sides of foundation etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Providing and laying of 65 mm dia HDPE pipe on Nallah crossing including making 8 mm thick gye wire arrangement for passing of HDPE pipe across nallah, on angle iron stand (stand paid seperately) including all tieing arrangements, complete job
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Carriage of materials from divisional store/ source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport
Pipes for an avg. lead of 45 Kms
Sand / Agg. for an avg. lead of 15 Kms
Carriage of materials from dumping site to acutal site of work, including loading, unloading and stacking etc. complete by manual labour for an Avg. lead of 550 mtrs.
Pipes
Sand / Agg.
Provision for pipe specials
M/S ABDUL HAMEED PASWAL
M/s SYED SALAH UD DIN MALIK
GHULAM RASOOL GANIE
M/S GHULAM MOHAMMAD KUMAR
GHULAM NABI RATHER
M/S ZAHOOR AHMAD MALIK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .