| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.5 L+₹1.0 L (13.4%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹9.0 L+₹1.5 L (20.0%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹10.3 L+₹2.9 L (38.6%)Rejected-AOC | 4 | Rejected-AOC L4 | |
| 5 | 5₹10.8 L+₹3.4 L (45.4%)Rejected-AOC | 5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
18 Nov 2020, 10:00 amClosed
K A Sunilkumar
Deputy General Manager (Projects and Planning), FACT (Cochin Division), Ambalamedu Ernakulam
Repair of west side cladding and roof of Sulphur Godown in Phase-II area of FACT (Cochin Division)
2020_FACT_594454_1
04031/2020-2021/E22364 dtd 02.11.2020
Limited
Civil Works
Item Rate
90 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDC101A)
5 documents required · 5 mandatory
₹0
₹12,000
Yes
14 Dec 2020
2 Nov 2020
19 Nov 2020
2 Nov 2020
18 Nov 2020
2 Nov 2020
Repair of west side cladding and roof of Sulphur Godown in Phase-II area of FACT (Cochin Division)
Cleaning the structural/other surface neatly at all heights, manually with suitable tools or with high pressure water jet spray (using suitable mechanical means), and scraping if required, to remove the whole accumulated dust, rust, dirt etc as per departmental instructions.
Dismantling AC / GI / Tufflite / Aluminium/ Zincalum sheet roofing, side cladding etc and depositing the debris away from plant limit within a distance of 150 m.
Dismantling AC / Aluminium / Zincalum ridge pieces and clearing away debris from the plant limit.
Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge)
Fabrication and erection of structural steel works bolted or welded as per drawings at all levels for trusses, ladders splices, frame work, base plates,HD bolts, purling, cleats, struts etc. including drilling, welding, cleaning the structural, erecting and painting with two coats of zinc chromate primer (one shop coat and one coat after erection) and two coats of chemical resistant enamel paint of approved quality and colour over the primer including supply of necessary MS bolts and nuts other than holding down bolts (Structural, gas & electrodes will be supplied free of cost by the Company)
Roofing/side cladding with AC corrugated/Semi corrugated sheets 6 mm thick with 7 mm or nearest available dia and suitable length GI Hooks/bolts and nuts,GI and bitumen washers ,cutting sheets to required shape/length, providing a minimum overlap of 150 mm at ends including cost of AC sheets and all other materials, scaffolding charges etc complete at all heights.
Providing AC Corrugated/semi corrugated ridge capping with 7 mm or nearest dia and suitable length GI hooks/bolts and nuts, GI and bitumen washers etc,providing required overlaps at ends including cost of all materials including ridge, scaffolding charges etc complete at all heights.
Painting one priming coat on new/old iron work at all heighs with approved quality zinc chromate yellow metal primer of approved brand and quality at all heighs icluding cost of primer and materials,labour,scaffolding charges, cleaning the site etc.as per departmental instructions.
Painting with synthetic enamel paint using approved brand & quality one coat at all heights (over a priming coat already done and paid separately) for iron work after cleaning the surface with cotton waste including cost of all materials, labour charges, scaffolding charges etc.complete as per departmental instructions
Painting with synthetic enamel paint using approved brand & quality, for each succeeding coat, at all heights for iron work after cleaning the surface including cost of all materials, labour charges, scaffolding charges etc.complete as per deptl instructions
Collecting ,conveying and Disposal of building rubbish/ debris/similar unserviceable,dismantled or waste materials by manual/ mechanical means, including loading, transporting, unloading to approved areas for filling, spreading in layers as per directions of Engineer-in-charge (20% deduction will be made if measured loose in lorries & from stack) - For an average lead of 2 KM
K.M.Joy
UNNIKRISHNAN V P
K A JOHN
BIJESH R P
K.M.Biju
DELTA CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_624458.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .