Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | L1 | Accepted-Finance LI | |
| 2 | L2₹3.9 L+₹9,118.20 (2.42%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹3.2 L
EMD Value
₹6,341
Closing Date
19 Feb 2020, 12:00 pmClosed
PROJECT ENGINEER UPRNSS BAHRAICH
PROJECT ENGINEER UPRNSS BAHRAICH
LABOUR WORK FOR BOUNDARY WALLTEHSIL RESIDENTIAL BUILDING PAYAGPUR DISTT- BAHRAICH
2020_UPRNS_434680_1
628/ E-Tender -1/Gonda-II /2019-20 /D-151
Open Tender
Civil Works
Item Wise
30 days
PAYAGPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹778
Project Engineer UPRNSS
₹6,341
22 Feb 2020
13 Feb 2020
19 Feb 2020
13 Feb 2020
19 Feb 2020
13 Feb 2020
Amount
Excavation in foundation in ordinary soil (Loam Clay or sand) including lift upto 1.5m (5fts) and lead upto 30mm (100fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directd by the Engineer-in-Charge upto a distance of 30m (100 fts) from the foundation trenches.
Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Brick ballast aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors.
sand filling in foundention
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in PlinthBeam excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item.
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Raft foundation excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item.
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in Column excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item
M-150 brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6)
40 mm thick D.P.C 1;2;4
Painting on D.P.C
Cutting & binding of steel
k s and associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .