| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC LOWSET PARTY | |
| 2 | L2₹9.2 L+₹1.4 L (18.4%)Rejected-Finance | L2 | Rejected-Finance HIGHER THAN L2 | |
| 3 | L3₹9.5 L+₹1.7 L (21.9%)Rejected-Finance | L3 | Rejected-Finance HIGHER THAN L1 AND L2 |
Tender Value
Refer Docs
EMD Value
₹19,750
Closing Date
3 Mar 2021, 3:00 pmClosed
AGMMT
TCC LTD., UDYOGAMANDAL, ERNAKULAM.
Roof maintenance works inside the factory upto 20 m for a period of one year
2021_TCCL_415292_1
TCCL/WC/C/775/2021
Open Tender
Civil Works - Others
Item Rate
365 days
THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL
Please refer Tender documents.
6 documents required · 6 mandatory
₹160
Yes
₹19,750
Yes
29 May 2021
15 Feb 2021
5 Mar 2021
15 Feb 2021
3 Mar 2021
15 Feb 2021
Amount
Dismantling A.C. roofing sheets of all sizes at all locations up to 20M from existing ground level by carefully unbolting, lowering, conveying and stacking them without damages at places inside factory compound within a lead of 1km, collecting, sorting and stacking roofing bolts of the dismantled sheets, including all labour charges, hire for hand cart/ tempovan / lorry, conveying charges, all safety protection works to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC
Dismantling, lowering, removing MS. structural works of roof cladding partitions, bracings, platforms, stairs, hand rails of all sizes and shapes at all locations and elevations up to 20M from ground level, carefully lowering by standard methods,conveying dismantled materials in hand cart/tempovan/lorry, stacking the items category wise at places pointed out inside factory compound within a lead of 1km, including all labour charges, hire for tools, derricks, tackles etc., all safety protection works to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost approved by TCC, all hire for hand cart/tempo van/lorry etc., complete
Roofing, side cladding etc., with A.C. roofing sheets or any other roofing sheets like plastic sheets, Aluminum sheets, fiber sheets etc., supplied by TCC of all sizes at all locations and height up to 20M from existing ground level, using old/new A.C. roofing sheets, collecting, conveying sheets from store yard/ inside factory carefully, drilling/holes for bolding, fitting the roofing sheets in position with suitable G.I. bolts, nuts, G.I. washer, bitumen washer etc., covering bolt holes in old sheets with G.I. bolts, washers, roofing compound etc., including painting/dipping, roofing, bolting, anti-corrosive painting well before using them, all labour charges, hire for tools, plants, standard lifts, devices, scaffolding charges, all protection works to workers, materials, equipment’s, machineries, pipe lines, cables etc ,all safety measures including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC. (Old/new roofing sheets, roofing bolts, nuts, washers, roofing compound and paint will be issued free of cost by TCC)
Replacing ridges at all locations and elevations up to 20M from existing ground level, fitting in position as per standard practice all as described in item No. 3 above.
Replacing corroded roofing bolts of all sizes at all locations and elevations up to 20m M from existing ground level by carefully, removing the roofing compound, unbolting, collecting and stacking bolts after dipping in anti-corrosive paint well before using, fitting with nuts, G.I. washers, bitumen washers, covering bolt head with roofing compound, including all safety precautions including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC.including covering machineries, equipment’s, pipe lines, cables etc., at contractors’ cost. (Required bolts, paint, nuts, washers, roofing compound will be issued free of cost by TCC)
Do… do.. As above for replacing corroded bolts of valley gutters, boundary wall gutters, half round gutters
Changing pipe clamp of all dia up to 200mm at all locations and height up to 20M from ground level, including drilling concrete/masonry, fixing G.I. Coach screws/bolts all as per standard practices, including all labour charges, hire for tools, drills etc., all safety precautions including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day at contractors risk and cost etc., approved by TCC. complete. (Pipe clamps and coach screws will be issued free of cost by TCC).
Replacing down water pipe of all diameter up to 200mm, including clamping as described in item No.11 above, after dismantling and stacking damaged pipe at places pointed out within factory compound, including all labour charges, conveyance charges, all safety precautions including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC. etc., complete.
Fabricating, erecting, setting, bolting/welding in position M.S. structural with new M.S. angles, channels, plates, rods,ISA,pipe, ISMB, sections, joists etc., of all sizes for roof trusses, brackets, bracings, side cladding, platforms, hand rails, racks etc., as per instructions, drawings and maintenance of structures at all locations and elevations up to 20M from ground level, including straightening, marking, cutting, drilling, holing, welding, bolting etc., all as per standard practices, scrapping thoroughly to remove rust, painting one coat finish paint with chlorinated rubber or enamel paint, including all labour charges, hire for tools, plants, welding sets, gas cutting equipment’s, derricks, tackles, all safety precautions to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC., materials, pipe lines, cables, all cost of consumables such as welding rods, cutting gas etc., complete. (M.S. structural, M.S. bolts, nuts, washers and paint will be issued free of cost by TCC).
Replacing valley gutters, boundary wall gutters, curved gutters etc., of all sizes at all locations and elevations up to 20M from ground level, fitting and setting as per standard practices with G.I. Fasteners, roofing compound, asbestos rope, re-setting gutters, clamps etc., including all labour charges, hire for tools and plants, all safety precautions including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC. etc., complete.
KP Nazar
K M Shajahan
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .