Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹320.5 CrAccepted-Finance ADD AVANTIKA COLONY NEAR RICE MILL KAILSA ROAD AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | 244221 | 1 | Accepted-Finance Accepted due to first lowest tenderer and total cost of work is below the estimated cost. | |
| 2 | 2₹343.8 Cr+₹23.3 Cr (7.28%)Accepted-Finance PLOT NO 11 SURVEY NO 09 THE WATER MARK BUILDING 9TH FLOOR WING B KONDAPUR HYDERABAD TELANGANA 50008 | 50008 | 2 | Accepted-Finance Rejected due to second lowest and rates higher than estimated rates. |
| Sl No | Description | Qty | Unit | M/S ARUN CONSTRUCTION L1 | Sudhakara Infratech Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) By Mechanical Means Cement Concrete Grade M-15 & M-20 | 2,333.19 | Cum | 550 ₹12,83,254.5 Lowest | 600 ₹13,99,914 |
| 2.00 | Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. Rubble Stone Masonry in Cement Mortar | 7,069.4 | Cum | 370 ₹26,15,678 Lowest | 500 ₹35,34,700 |
| 3.00 | Dismantling Brick / Tile work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 | 1,496.88 | Cum | 370 ₹5,53,845.6 Lowest | 500 ₹7,48,440 |
| 4.00 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Bituminous Courses | 1,307.29 | Cum | 845 ₹11,04,660.05 Lowest | 1,500 ₹19,60,935 |
| 5.00 | Dismantling of Structures
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)By Mechanical Means Prestressed / Reinforced cement concrete grade M-20 & above | 6,429.04 | Cum | 1,470 ₹94,50,688.8 Lowest | 2,000 ₹1,28,58,080 |
| 6.00 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means Granular Courses | 12,338.13 | Cum | 600 ₹74,02,878 Lowest | 650 ₹80,19,784.5 |
| 7.00 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 2,572.13 | Cum | 1,560 ₹40,12,522.8 Lowest | 2,000 ₹51,44,260 |
| 8.00 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge | 3,858.23 | Sqm | 125 ₹4,82,278.75 Lowest | 250 ₹9,64,557.5 |
| 9.00 | Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000
metre | 5,142.3 | RM | 16 ₹82,276.8 Lowest | 50 ₹2,57,115 |
| 10.00 | Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with all lifts and up to
a lead of 1000 metre) | 5,142.3 | RM | 24 ₹1,23,415.2 Lowest | 30 ₹1,54,269 |
Tender Value
₹378.3 Cr
EMD Value
₹6.4 Cr
Closing Date
24 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE IWC Haldwani
Office of Superintending Engineer Irrigation Works Circle Haldwani Haldwani PIN 263139
Construction of storm water drainage of Haldwani city district Nainital under Phase 1
2026_IRDCE_99030_1
Etender notice no. 06/SE/2026-27
Open Tender
Civil Works - Others
Item Rate
1095 days
Haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer ID Haldwani
₹6.4 Cr
Office of SE IWC Haldwani
31 Oct 2026
17 Aug 2026
24 Sept 2026
17 Aug 2026
24 Sept 2026
7 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) By Mechanical Means Cement Concrete Grade M-15 & M-20 | 2,333.19 | Cum | 575.5 | ₹13,42,750.85 |
| 2 | Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. Rubble Stone Masonry in Cement Mortar | 7,069.4 | Cum | 384.6 | ₹27,18,891.24 |
| 3 | Dismantling Brick / Tile work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 | 1,496.88 | Cum | 384.6 | ₹5,75,700.05 |
| 4 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Bituminous Courses | 1,307.29 | Cum | 888.8 | ₹11,61,919.35 |
| 5 | Dismantling of Structures
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)By Mechanical Means Prestressed / Reinforced cement concrete grade M-20 & above | 6,429.04 | Cum | 1,541.7 | ₹99,11,650.97 |
| 6 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means Granular Courses | 12,338.13 | Cum | 627.3 | ₹77,39,708.95 |
| 7 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 2,572.13 | Cum | 1,640.1 | ₹42,18,550.41 |
| 8 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge | 3,858.23 | Sqm | 129.28 | ₹4,98,791.97 |
| 9 | Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000
metre | 5,142.3 | RM | 16.3 | ₹83,819.49 |
| 10 | Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with all lifts and up to
a lead of 1000 metre) | 5,142.3 | RM | 24.7 | ₹1,27,014.81 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
TechBidNIT06Drainage.pdf
Tender Documents • 2.36 MB
BOQ_116805.xls
BOQ • 0.29 MB
corri4dtextndrainage.pdf
PDF • 0.31 MB
corri3Drainage.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .