Loading…
Loading…
Tender Value
₹378.3 Cr
EMD Value
₹6.4 Cr
Closing Date
16 Sept 2026, 3:00 pm
SE IWC Haldwani
Office of Superintending Engineer Irrigation Works Circle Haldwani Haldwani PIN 263139
Construction of storm water drainage of Haldwani city district Nainital under Phase 1
2026_IRDCE_99030_1
Etender notice no. 06/SE/2026-27
Open Tender
Civil Works - Others
Item Rate
1095 days
Haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer ID Haldwani
₹6.4 Cr
Office of SE IWC Haldwani
17 Aug 2026
17 Aug 2026
16 Sept 2026
17 Aug 2026
16 Sept 2026
7 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) By Mechanical Means Cement Concrete Grade M-15 & M-20 | 2,333.19 | Cum | 575.5 | ₹13,42,750.85 |
| 2 | Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. Rubble Stone Masonry in Cement Mortar | 7,069.4 | Cum | 384.6 | ₹27,18,891.24 |
| 3 | Dismantling Brick / Tile work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 | 1,496.88 | Cum | 384.6 | ₹5,75,700.05 |
| 4 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Bituminous Courses | 1,307.29 | Cum | 888.8 | ₹11,61,919.35 |
| 5 | Dismantling of Structures
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)By Mechanical Means Prestressed / Reinforced cement concrete grade M-20 & above | 6,429.04 | Cum | 1,541.7 | ₹99,11,650.97 |
| 6 | Dismantling of Flexible Pavements
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means Granular Courses | 12,338.13 | Cum | 627.3 | ₹77,39,708.95 |
| 7 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 2,572.13 | Cum | 1,640.1 | ₹42,18,550.41 |
| 8 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge | 3,858.23 | Sqm | 129.28 | ₹4,98,791.97 |
| 9 | Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000
metre | 5,142.3 | RM | 16.3 | ₹83,819.49 |
| 10 | Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with all lifts and up to
a lead of 1000 metre) | 5,142.3 | RM | 24.7 | ₹1,27,014.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
TechBidNIT06Drainage.pdf
Tender Documents • 2.36 MB
BOQ_116805.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].