Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.4 LAdmitted-Finance KRISHNA PALLY BAPUJI COLONT MALDA | MALDA | MALDA | WEST BENGAL | 732102 | +0.00% | ₹29.4 L | L1 | Admitted-Finance |
| 2 | L2₹30.0 L+₹66,065.71 (2.25%)Admitted-Finance | +2.25% | ₹30.0 L+₹66,065.71 (2.25%) | L2 | Admitted-Finance |
| 3 | L3₹30.4 L+₹1.0 L (3.50%)Admitted-Finance | +3.50% | ₹30.4 L+₹1.0 L (3.50%) | L3 | Admitted-Finance |
Tender Value
₹29.4 L
EMD Value
₹59,000
Closing Date
27 Mar 2026, 2:00 pmClosed
Dy.CE(E)/IGWTP
IGWTP/BARRACKPORE
UPLIFTMENT OF THE UNDER-BED FILTER WATER COLLECTION SYSTEM, SAND SCRAPPING AND DISINFECTION ACTIVITIES WITH SUPPLY AND INSTALLATION OF THE VALVES AGAINST THE EXTENSION SERIES SSFB UNIT NO-E-11 AT IGWTP
2026_KMC_1016769_1
KMC/WS/IGWTP/100/25-26, DT-20/02/2026
Open Tender
CIVIL WORKS
Percentage
90 days
IGWTP/BARRACKPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹59,000
IGWTP/BARRACKPORE
7 Jul 2026
2 Mar 2026
30 Mar 2026
2 Mar 2026
27 Mar 2026
12 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | PART-A | - | - | - | - |
| 1 | SCRAPPING THE TOP LAYER SAND MEDIA CONSISTING OF MUD OR MUDDY SAND, ALGAE MOSS ETC. FROM FILTER BEDS AND CARRYING THE SAID SCRAPPED SAND BY HEAD LOAD AND TIPPING WAGONS TO A DISTANCE WITHIN 300 METERS FROM FILTER BED AND UNLOADING THE SAME AND STACKING PROPERLY AS PER DIRECTION OF E.I.C. (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT). | - | CUBIC METER | 170 | - |
| 2 | SCRAPPING THE 2ND LAYER OF SAND OR FIRST LAYER (WHERE THERE IS NO CLAY, ALGAE, MOSS, MUD ETC ) FROM FILTER BEDS AND CARRING THE SAID SCRAPPED SAND BY HEAD LOAD AND TIPPING WAGONS TO A DISTANCE WITHIN 300 MTRS. FROM FILTER BED AND UNLOADING THE SAME AND STACKING PROPERLY AS PER DIRECTION OF E.I.C (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT ) | - | CUBIC METER | 170 | - |
| 3 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS 1.Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) | - | SQUARE METER | 7 | - |
| 4 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 1White washing including cleaning and smoothening surface thoroughly.All floors :b) Two coats (to be done on specific instruction). | - | PER 100 SQUARE METERS. | 18.14 | - |
| 5 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 3.Colour washing with "ELLA" with a coat of white wash priming including cleaning and smoothening surface thoroughly : (ii) External surface (ground floor) (b) Two coats N.B. : Extra for each additional floor in external walls refer item 1 of | - | PER 100 SQUARE METERS. | 21.77 | - |
| 6 | CUTTING SAND (MIDUM/COARSE SAND) FROM FILTER BEDS COLLECTING, CARRYING AND REMOVING BY HEAD LOAD OR/AND TIPPING WAGONS AND DUMPING IN STACK NEAR THE IDENTIFIED SAND WASHING MACHINE SITUATED AT A DISTANCE NOT EXCEEDING 300 METERS AS PER DIRECTION OF E.I.C. (PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT) | - | CUBIC METER | 237 | - |
| 7 | CUTTING OF GRAVELS OF FILTER BED UP TO THE TOP OF THE UNDER DRAIN BRIC LAYER COLLECTING AND CARRYING THE SAME AND DUMPING IN STACK AT A DISTANCE WITHIN 300 MTRS AS PER DIRECTION OF EIC ( PAYMENT SHOULD BE MADE ON THE BASIS OF STACK MEASUREMENT) | - | CUBIC METER | 430 | - |
| 8 | LAYING OLD & NEW BRICKS OVER THE UNDER DRAINS OF S.S.F.B. INCLUDING CARRIAGE OF BRICK TO THE WORK SITE AS PER DIRECTION OF E.I.C.(MEASUREMENT BEING MADE ON OPEN AREA OF FILTER BED AT FLOOR LEVEL) | - | SQUARE METER | 115 | - |
| 9 | REMOVING ALL UNDER DRAIN BRICK SLABS FORMING THE SIDE AND TOP OF THE UNDER DRAIN OF SSFB CLEANING AND WASHING THE SAME INCLUDING REMOVAL OF SANDY EARTH, BROKEN BRICKS AND RUBBISH FROM THE BED AND DUMPING AT A PLACE AS PER DIRECTION OF E.I.C ( LABOUR AND MATERIALS),(MEASUREMENT BEING MADE ON OPEN AREA FILTER BED AT FLOOR LAVEL | - | SQUARE METER | 58 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
TECHBID100.pdf
Tender Documents • 1.35 MB
BOQ_2497965.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .