Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹275.8 CrAccepted-AOC | ₹275.8 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹320.5 CrRejected-AOC 130A 18TH FLOOR INFINITY BUSINESS CENTRE PLOT GI BLOCK GP SALTLAKE SEC V KOLKATA 700091 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹320.5 Cr | 2 | Rejected-AOC L2 Bidder |
Tender Value
Refer Docs
EMD Value
₹2 Cr
Closing Date
31 Jul 2020, 5:00 pmClosed
SE_South_GAP_WandS_KMDA
D-Block, 1st Floor, Unnayan Bhavan, Salt Lake City, Kolkata-700091.
Pollution Abatement Interception and Diversion with STP Works for River Ganga at Maheshtala Municipality in State of West Bengal including 15 years Operation and Maintenance under Hybrid Annuity Based PPP Mode.
2020_KMDA_268633_1
KMDA/WS/GAP/SE/S/NIT-5/19-20
Open Tender
CIVIL AND ELECTRICAL WORKS
730 days
Mahestala Municipal Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2 Cr
Chamber of the Chief Engineer, GAP Wing, KMDA
11 Mar 2025
29 Jan 2020
3 Aug 2020
29 Jan 2020
31 Jul 2020
29 Jan 2020
29 Jan 2020 - 10 Feb 2020
13 Feb 2020
Amount
Maheshtala Bid Project cost(including all taxes)
Bid Project Cost (including all taxes) for proposed 26.00 MLD STP in Maheshtala
Bid Project Cost (including all taxes) for STP associated infrastructure in Maheshtala (MPS-2 (Design capacity civil-52.01 MLD & Electromechanical-26.00 MLD), EPS-2 (26.00 MLD), LS-2 (Design capacity civil-21.32 MLD & Electromechanical-13.04 MLD), LS-3 (Design capacity civil-5.43MLD & Electromechanical-2.92MLD), rising main-3603.00m, sewer line including manhole (88nos)-2708.84m, and Interception and diversion work including diversion drain-4no.)
O&M charges for proposed 26.00 MLD STP for first month after COD
Manpower
Maintenance and Repair
Consumables
26.00 MLD STP Guaranteed Energy Consumption for first month after COD (Non-zero value must be entered for row no.s 1.08 to 1.19)
For flow < 13.00MLD and BOD < 100 mg/L
For flow < 13.00MLD and BOD > 100 mg/L and upto 150mg/L
For flow < 13.00MLD and BOD > 150 mg/L and upto200mg/L
For flow < 13.00MLD and BOD > 200 mg/L and upto 250mg/L
For flow >13.00MLD and upto 20.00 MLD and BOD < 100 mg/L
For flow > 13.00MLD and upto 20.00 MLD and BOD > 100 mg/L and upto 150mg/L
For flow >13.00MLD and upto 20.00 MLD and BOD > 150 mg/L and upto 200mg/L
For flow >13.00MLD and upto 20.00 MLD and BOD > 200 mg/L and upto 250mg/L
For flow > 20.00MLD and upto 26.00 MLD and BOD < 100 mg/L
For flow > 20.00MLD and upto 26.00 MLD and BOD > 100 mg/L and upto 150mg/L
For flow > 20.00MLD and upto 26.00 MLD and BOD > 150 mg/L and upto200mg/L
For flow > 20.00MLD and upto 26.00 MLD and BOD > 200 mg/L and upto 250mg/L
Maheshtala STP (26.00 MLD) Guaranteed Energy Consumption (Average)
Maheshtala STP 26.00 MLD Power Charges (=26.00 X Units Consumed/MLD X 5475 X 6.18)
Land requirement (sqm)- 26.00 MLD STP-2
O&M Charges for STP Aassociated Infrastructure in Maheshtala (MPS-2 (26.00 MLD) , EPS-2 (26.00 MLD), LS-2 (Design capacity civil-21.32 MLD & Electromechanical-13.04 MLD),LS-3 (Design capacity civil-5.43MLD & Electromechanical-2.92MLD) ,rising main-3603.00m, sewer line including manhole-2708.84m, and Interception and diversion work including diversion-4no.)
Manpower
Maintenance and Repair
STP Associated Infra Guaranteed Energy Consumption for first month after COD - (26.00+26.00+13.04+2.92) MLD capacity X Units Consumed/MLD X 5475 X6.18) (Main pumping station-1no, Effluent pumping station-1no. and Pumping station/lifting station-2no)
Maheshtala Facilities BID PRICE
Bid Project cost(including all taxes)
Bid Project Cost (including all taxes) for existing 4.20 MLD WSP type STP in Maheshtala
Bid Project Cost (including all taxes) for Existing STP Associated Infrastructure in Maheshtala (MPS-1 (4.20 MLD) , EPS-1 (4.20 MLD), LS-1 (4.20 MLD), rising main-(1660.00+1619.00)m, sewer line including manhole-1145.00m, and Interception and diversion work-1no.)
O&M charges for Existing 4.20 MLD WSP type STP for first month after COD
Manpower
Maintenance and Repair
Consumables
4.20 MLD STP Guaranteed Energy Consumption for first month after COD
For flow < 2.10 MLD and BOD < 100 mg/L
For flow < 2.10 MLD and BOD > 100 mg/L and upto 150mg/L
For flow < 2.10 MLD and BOD > 150 mg/L and upto 200mg/L
For flow < 2.10 MLD and BOD > 200 mg/L and upto 250mg/L
For flow > 2.10 MLD and upto 4.20 MLD and BOD < 100 mg/L
For flow > 2.10 MLD and upto 4.20 MLD and BOD > 100 mg/L and upto 150mg/L
For flow > 2.10 MLD and upto 4.20 MLD and BOD > 150 mg/L and upto 200mg/L
For flow > 2.10 MLD and upto 4.20 MLD and BOD > 200 mg/L and upto 250mg/L
Existing Maheshtala STP (4.20 MLD) Guaranteed Energy Consumption (Average)
Existing Maheshtala STP 4.20 MLD Power Charges (=4.20 X Units Consumed/MLD X 5475 X 6.18)
O&M Charges for Existing STP Associated Infrastructure in Maheshtala (MPS-1 (4.20 MLD) , EPS-1 (4.20 MLD), LS-1 (4.20 MLD),rising main-(1660.00+1619.00)m, sewer line including manhole-1145.00m, and Interception and diversion work-1no.)
Manpower
Maintenance and Repair
Existing STP 4.2 MLD WSP type Associated Infra Guaranteed Energy Consumption for first month after COD - (4.20+4.20+4.20) MLD capacity X Units Consumed/MLD X 5475 X6.18) (Main pumping station-1no, Effluent pumping station-1no. and Pumping station/lifting station-1no)
Existing Maheshtala Facilities BID PRICE
Swach Environment Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid