Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Single_Bidder_eligible_hence_Rejected |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of Dak Banglow at Bomai Under 14th FCA Block Tujjar Sharief Distr
2026_RDPR_316853_2
133/Xen/Rew/Bla/2026-27 Dated 20/07/2026
Open Tender
Civil Works
Percentage
540 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Executive Engineer REW Baramulla
₹4.8 L
27 Aug 2026
20 Jul 2026
13 Aug 2026
20 Jul 2026
12 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A(MEETING HALL)
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 700 | Sqm | 24.12 | ₹16,884 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 0.6 | cum | 256.85 | ₹154.11 |
| 3 | Providing and laying of stone solling hand Packed | 1 | cum | - | - |
| 4 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | 1 | ₹1 |
| 5 | Providing and laying of Rainforcement Cement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:1.50:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.4 | cum | 1 | ₹0.4 |
| 6 | Providing and laying of Cement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 6,540.45 | ₹6,533.91 |
| 7 | Reinforced cement concrete work including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,395.7 | - |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 mix (1 Cement :6 Course sand) | 0.8 | cum | 7,571.55 | ₹6,049.67 |
| 9 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | cum | 1,455.65 | - |
| 10 | Providing and laying of Reinforcement Cement Concrete excluding the cost of centring and shuttering. All work in Suspension Slabs beams Etc with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
stage.html
html • 0.02 MB
finance_1036104.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1036104.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].