Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹14.9 LAccepted-AOC SAGBAHAL SUNDARGARH | SUNDARGARH | ODISHA | 754217 | ₹14.9 L | l1 | Accepted-AOC Accepted. Winner in lottery |
| 2 | l1₹14.9 LRejected-AOC AT WARD NO 2 PO SUNDARGARH PS TOWN SUNDARGARH DIST SUNDARGARH PIN 770001 | SUNDARGARH | ODISHA | 770001 | ₹14.9 L | l1 | Rejected-AOC Accepted |
| 3 | L1₹14.9 LRejected-AOC | ₹14.9 L | L1 | Rejected-AOC Accepted |
| 4 | l1₹14.9 LRejected-AOC AT KHAMARIMUNDA BIRKALDIHI BALISANKARA SUNDARGARH | SUNDARGARH | SUNDARGARH | ODISHA | ₹14.9 L | l1 | Rejected-AOC Accepted |
| 5 | L1₹14.9 LRejected-AOC | ₹14.9 L | L1 | Rejected-AOC Accepted |
Tender Value
₹14.9 L
EMD Value
₹14,929
Closing Date
6 Apr 2026, 5:00 pmClosed
SE Sundargarh R and B Division, Sundargarh
O/o the SE Sundargarh R and B Division, Sundargarh
S/R to Govt. College Sundargarh such as fixing of Tile, replacing Door and Window , Construction of shelve for Museum Room under RUSA fund for the year 2025.26
2026_EICCL_127497_2
Bid Identification No-SE-R AND B-SNG-35 OF 2025-26
Open Tender
Civil Works - Buildings
Percentage
90 days
Sundargarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹14,929
Yes
23 Jun 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
25 Mar 2026 - 2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1S/R to Govt. College Sundargarh such as fixing of Tile, replacing Door and Window , Construction of shelve for Museum Room under RUSA fund for the year 2025.26 | |||||
| 1.1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C. | - | Cum | - | - |
| 2Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | |||||
| 3Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | |||||
| 4Construction of granular sub base by providing coarse graded material Grading -IV material as per table 401 spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRTH specification for road and bridge work ( 5th revision) | |||||
| 5Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and Plinth including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | |||||
| 6Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Superstructure including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | |||||
| 7C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | |||||
| 8R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. | |||||
| 9Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | |||||
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585849.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_585849.xls
BOQ • 0.29 MB
DTCN_2.pdf
Tender Documents • 8.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .