Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr | L1 | Accepted-AOC L1 ACCEPTED |
| 2 | L2₹4.4 Cr+₹35.4 L (8.82%)Rejected-AOC | ₹4.4 Cr+₹35.4 L (8.82%) | L2 | Rejected-AOC L2 REJECTED |
| 3 | L3₹4.8 Cr+₹83.5 L (20.8%)Rejected-Finance | ₹4.8 Cr+₹83.5 L (20.8%) | L3 | Rejected-Finance L3 REJECTED |
Tender Value
₹4.4 Cr
EMD Value
₹1 L
Closing Date
18 Feb 2020, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Harbour Engineering Division Kasaragod
Kasaragod Development Package 2018-19-Improvements to Kannangala - Kurichipalla Manimunda road in Mangalpady Panchayath
2020_HED_337919_1
25/HED/EE/KGD/2019-20/SN
Open Tender
Civil Works - Others
Item Rate
365 days
Mangalpady
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,925
Yes
online
₹1 L
Yes
16 Nov 2020
11 Feb 2020
22 Feb 2020
11 Feb 2020
18 Feb 2020
11 Feb 2020
Amount
Appendix A- Construction of groynes
65.49 : Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Kasaragode District
65.50 : Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br>Kasaragode District
65.51 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kasargode District
od4670/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 2T to 3T category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site
Appendix B- Construction of road and Road protection
2.1 : Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
DAR data
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
od4703/2019_2020 : Laying geotextile for retaining the earth used for road construction
MORD data
od4715/2019_2020 : Providing and laying filter media with granular crushed aggregates as per specification with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind pitching to the full height ,compacted to firm condition complete as per drawing and technical specification clause 1204.3.89 (Based on item no.12.11 Mord)
od4716/2019_2020 : Supplying at site of work granite stones 20 to 40dm3 (75% of 30 to 40 dm3 and 25% of 20 to 30 dm3) and stacking for measurements (deducting not less than 15% for voids as fixed by the departmental officers at site) including cost,conveyance,loading and unloading charges,all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site
od4705/2019_2020 : Carriage of granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels including all leads and lifts etc complete
od4708/2019_2020 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by using quarrymuck spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.
shahadi thayyib K H
Expanse India Buildcon Pvt. Ltd
Bidder Name
Expanse India Buildcon Pvt. Ltd
aboobacker
shahadi thayyib K H
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_479284.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .