| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.7 LAccepted-Finance | ₹47.7 L | L1 | Accepted-Finance Bid ok. |
| 2 | L2₹47.9 LAccepted-Finance | ₹47.9 L | L2 | Accepted-Finance Bid ok. |
| 3 | L3₹48.2 LAccepted-Finance 179 THE MALL AMBALA CANTT 133001 HR | AMBALA | HARYANA | 133001 | ₹48.2 L | L3 | Accepted-Finance Bid ok. |
| 4 | L4₹48.9 LAccepted-Finance | ₹48.9 L | L4 | Accepted-Finance Bid ok. |
| 5 | L5₹49.0 LAccepted-Finance | ₹49.0 L | L5 | Accepted-Finance Bid ok. |
| Sl No | Description | Qty | Unit | M/s Mangal Construction Co. L6 | M/s B.S.Jain L1 | R.D Builders L3 | Swastik Builders L4 | KULWANT SINGH L5 | Hi Tech Builder L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in Soft loose soil). | 600 | Per Cum | 222 ₹1.3 L | 172 ₹1.0 L | 160 ₹96,000 | 183 ₹1.1 L | 193.55 ₹1.2 L | 188 ₹1.1 L |
| 2.00 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in Mud). | 300 | Per Cum | 342 ₹1.0 L | 330 ₹99,000 | 434 ₹1.3 L | 423 ₹1.3 L | 369.55 ₹1.1 L | 405 ₹1.2 L |
| 3.00 | M/L providing plain cement concrete M 10 (1:5:10) for bedding using 40 mm size and down,Graded aggregate mechanically mixed, For intercept drain pit and in Foundation, compacted by vibration including centering and shuttering works, curing etc., complete as per drawings and Technical Specification and as per the direction of Engineer. | 73 | Per Cum | 3,478 ₹2.5 L | 3,410 ₹2.5 L | 3,311 ₹2.4 L | 3,425 ₹2.5 L | 3,272 ₹2.4 L | 3,392 ₹2.5 L |
| 4.00 | M/L providing and Construction of Reinforced Cement Concrete work in Cement Concrete 1:1.5:3 for Base slab, footing with 20mm size IRC grade machine crushed chips and excluding cost of reinforcement and including centering and shuttering works & cost of mixing, laying , curing etc., complete as per Technical Specification and as per direction of Engineer. Note : 1. The Contractor has to carryout dewatering time to time during execution of concerting work and upto 48 house after execution of concerting works and no extra payment for dewatering or manpower will be paid by Cantonment Board. 2. Only OPC cement will be used for all RCC works. | 70 | Per Cum | 5,980 ₹4.2 L | 6,195 ₹4.3 L | 6,205 ₹4.3 L | 6,211 ₹4.3 L | 6,330 ₹4.4 L | 6,050 ₹4.2 L |
| 5.00 | M/L providing and Construction of Reinforced Cement Concrete work in Cement Concrete 1:1.5:3 for Walls pillar etc with 20mm-12.5mm size IRC grade machine crushed chips and excluding cost of reinforcement and cost of mixing, laying , curing etc., complete as per Technical Specification and as per direction of Engineer. Note : 1. The Contractor has to carryout dewatering time to time during execution of concerting work and upto 48 hours after execution of concerting works and no extra payment for dewatering or manpower will be paid by Cantonment Board. OPC wil be used for conereting works. 2. Only OPC cement will be used for all RCC works. | 185 | Per Cum | 7,310 ₹13.5 L | 7,173 ₹13.3 L | 7,127 ₹13.2 L | 7,095 ₹13.1 L | 7,288 ₹13.5 L | 7,105 ₹13.1 L |
| 6.00 | S/f mild steel bars 8mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with mild steel wire (annealed) not less than 0.9mm dia or securing with clips. | 9,500 | Per kg | 92.72 ₹8.8 L | 94 ₹8.9 L | 88.05 ₹8.4 L | 91.5 ₹8.7 L | 93.44 ₹8.9 L | 89.8 ₹8.5 L |
| 7.01 | Use & waste of formwork to faces of walls, retaining walls, etc vertical and soffits and sides of suspended slab, such as roof slabs, floor slabs, landings and columns similar work not exceeding 200 mm thick (Horizontal or sloping) fair finished surfaces all as sp. in MES SSR 2020. to batter fair finished surfaces all as sp. in MES SSR 2020. | 1,200 | Per Sm | 305 ₹3.7 L | 298 ₹3.6 L | 319 ₹3.8 L | 322 ₹3.9 L | 332 ₹4.0 L | 295 ₹3.5 L |
| 7.02 | Use and waste of formwork to sides of concrete foundations and backside of nullah, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter. | 600 | Per Sm | 272 ₹1.6 L | 253 ₹1.5 L | 242 ₹1.5 L | 275 ₹1.6 L | 252 ₹1.5 L | 250 ₹1.5 L |
| 8.00 | Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement and making necessary channels for the drain etc. | 10 | Each | 122 ₹1,220 | 130 ₹1,300 | 162 ₹1,620 | 188 ₹1,880 | 168 ₹1,680 | 140 ₹1,400 |
| 9.00 | Providing, supplying, fabricating, galvanising (as per specification), transporting, erecting and aligning and installing in position by bolting / welding / screwing of factory made inlet for intercept drains /water body fabricated using mild steel (Grade-E250, Quality-BR) conforming to IS:2062-2011, at all levels, in, drain covers, trench covers, etc. with all fittings and fixtures, (clips, bolts, self drilling and taping screws, nuts and lock washers) etc., complete as per direction of Engineer. | 1,000 | Per kg | 137.13 ₹1.4 L | 132.29 ₹1.3 L | 137.29 ₹1.4 L | 145 ₹1.4 L | 136 ₹1.4 L | 138.39 ₹1.4 L |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
5 Mar 2026, 5:00 pmClosed
Chief Executive officer.
229, Race Course Road, Cantonment Board office, Ambala Cantt.
As per tender documents.
2026_DGDE_753084_1
ACB/AE/TDR/2025/29/02
Open Tender
Civil Works - Others
270 days
Ambala Cantt
As per tender documents.
3 documents required · 3 mandatory
₹1,500
Chief Executive officer
₹99,000
10 Mar 2026
17 Feb 2026
6 Mar 2026
17 Feb 2026
5 Mar 2026
23 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid