| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance | ₹1.4 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BHANDARI CONTRACTOR L1 |
|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | ||||
| 1.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 By Manual Means | 20.3 | Cum | 2,490 ₹50,546.69 Lowest |
| 2.00 | Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, | 30,607.5 | sqm | 27.3 ₹8,35,584.75 Lowest |
| 3.00 | Bituminous Macadam with Warm Mix Technology
Providing and laying Bituminous macadam with the use of asphalt mixing plant using crushed aggregates of grading as per Table 500.4, premixed with bituminous binder and warm mix additive, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 using the Warm Mix (WMA) Asphalt Technlogy as per IRC:SP: 101-2009. (Bitumen VG-10 @ 3.3% of the weight of mix and warm mix additive @ 0.4% of the weight of bitimen have been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD with Bitumen VG-10 | 61.88 | cum | 10,600 ₹6,55,875 Lowest |
| 4.00 | Semi Dense Bituminous Concrete with Warm Mix Technology
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, filler and warm mix additive @ 0.4% by weight of bitumen and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix) | 721.88 | cum | 15,700 ₹1,13,33,437.5 Lowest |
| 5.00 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 1,000 | sqm | 520 ₹5,20,000 Lowest |
| 6.00 | Maintenance of Earhen shoulder(stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 | 8,775 | sqm | 16 ₹1,40,400 Lowest |
| 7.00 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. | 4,950 | R/mtr | 4.2 ₹20,790 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.6 L
Closing Date
16 May 2026, 1:00 pmClosed
Executive Engineer
Construction Division PWD Almora
Renewal by SDBC in Bageshwar Girechhina Someshwar Dwarahat Vimandeshwar Era Ranikhet MR (Binta Someshwar Girechhina Prabhag)
2026_pwd_95043_1
1198/nivida date 29.04.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
someshwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE CD PWD ALMORA
₹2.6 L
25 May 2026
5 May 2026
16 May 2026
5 May 2026
16 May 2026
10 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 By Manual Means | 20.3 | Cum | - | - |
| 2 | Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm, | 30,607.5 | sqm | - | - |
| 3 | Bituminous Macadam with Warm Mix Technology
Providing and laying Bituminous macadam with the use of asphalt mixing plant using crushed aggregates of grading as per Table 500.4, premixed with bituminous binder and warm mix additive, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 using the Warm Mix (WMA) Asphalt Technlogy as per IRC:SP: 101-2009. (Bitumen VG-10 @ 3.3% of the weight of mix and warm mix additive @ 0.4% of the weight of bitimen have been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD with Bitumen VG-10 | 61.88 | cum | - | - |
| 4 | Semi Dense Bituminous Concrete with Warm Mix Technology
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, filler and warm mix additive @ 0.4% by weight of bitumen and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix) | 721.88 | cum | - | - |
| 5 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 1,000 | sqm | - | - |
| 6 | Maintenance of Earhen shoulder(stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 | 8,775 | sqm | - | - |
| 7 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. | 4,950 | R/mtr | - | - |
stage.html
html • 0.02 MB
finance_112399.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_112399.xls
BOQ • 0.27 MB
technicalbid.pdf
Tender Documents • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].