| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 CrAccepted-AOC | ₹16.5 Cr Quoted ₹15.7 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹16.3 Cr+₹54.7 L (3.48%)Rejected-AOC | ₹16.3 Cr+₹54.7 L (3.48%) | L2 | Rejected-AOC L2 |
| 3 | L3₹16.5 Cr+₹79.6 L (5.06%)Rejected-AOC | ₹16.5 Cr+₹79.6 L (5.06%) | L3 | Rejected-AOC L3 |
Tender Value
₹10.0 Cr
EMD Value
₹24.9 L
Closing Date
27 Oct 2025, 4:00 pmClosed
Additional Chief Engineer, BNHD
Nirman Bhawan, Zero Point, Buildings and Housing Department, Government of Sikkim.
Construction of Office and Residential Quarters at BIP Thangu, North Sikkim.
2025_BHD_851_1
307/GOS/BNH/HO/24-25/P/14
Open Tender
Civil Works
Percentage
1095 days
Thangu, North Sikkim.
Please refer Tender documents.
6 documents required · 6 mandatory
₹1 L
0059-80-800-04 Public Works BuildingsHousingDept
₹24.9 L
21 Aug 2026
26 Sept 2025
29 Oct 2025
26 Sept 2025
27 Oct 2025
26 Sept 2025
26 Sept 2025 - 25 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE OF RATES FOR SIB OFFICE AT THANGU NORTH SIKKIM. | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 498.3 | m3 | 295.52 | ₹1,47,257.41 |
| 1.02 | Providing and laying hand packed stone soling in buildings works with clean hard selected stones, all complete. (Manual means) | 51.57 | m3 | 1,110.94 | ₹57,294.65 |
| 1.03 | Providing and Laying in position cement concrete of 1:2:4 mix. (1 cement, 2 coarse sand, 4 graded stone aggregate of 20mm & down size) including compacting curing etc all complete. | 27.44 | m3 | 5,923.74 | ₹1,62,570.4 |
| 1.04 | Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge. | 62.93 | m3 | 4,253.14 | ₹2,67,629.56 |
| 1.05 | Providing and laying in position 1:1.5:3 mix ( 1 cement, 1.5 coarse sand, 3 graded stone aggregate 20mm and down nominal gauge) of reinforced cement concrete excluding the cost of formwork, finishing and reinforcement. | 197.59 | m3 | 6,885.24 | ₹13,60,470.65 |
| 1.06 | Supplying, bending and placing in position steel reinforcement in all R.C.C works including cost of binding wires all complete. ( including 10% extra for earthquake resistance) | 282.56 | qtl. | 8,038.55 | ₹22,71,348.89 |
| 1.07 | Providing, fixing & removing form work for casting R.C.C items as indicated below: with local timber from inside the state) | - | - | - | - |
| 1.08 | Foundation, footings, base of column etc for mass concrete. | 44.61 | m2 | 825.32 | ₹36,817.25 |
| 1.09 | Beam, lintels, girders, brersumers and cantilevers. | 531.71 | m2 | 808.92 | ₹4,30,112.01 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_924.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderDocument.pdf
Tender Documents • 0.56 MB
BOQ_924.xls
BOQ • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .