Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.6 LRejected-AOC KERALA KL | ₹6.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.3 LRejected-AOC | ₹7.3 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | TOJU JOSEPH L1 | NA L2 | Fine Constructions L3 |
|---|---|---|---|---|---|---|
| 1.00Side protection work | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 141.93 | cum | 214.86 ₹30,494.01 | 235.73 ₹33,455.98 | 257.63 ₹36,564.14 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 164.5 | cum | 3,330.55 ₹5.5 L | 3,654.01 ₹6.0 L | 3,993.46 ₹6.6 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 12.53 | sqm | 322.06 ₹4,033.80 | 353.33 ₹4,425.46 | 386.16 ₹4,836.65 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.08 | cum | 7,702.8 ₹23,686.11 | 8,450.91 ₹25,986.55 | 9,235.97 ₹28,400.61 |
Tender Value
₹7.3 L
EMD Value
₹18,168
Closing Date
16 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Subdivision Civilstation Fourth Floor Pala
The estimate proposes side protection works for a total length of 82m comprising 10m length with 1.5m height 45m length with 1.8m heigh 27m length with 2m height on the left bank
2026_Irrig_834882_1
182/AEE/MI/SUBDN/PALA/2025-26
Open Tender
Civil Works - Others
270 days
Ramapuram
please refer to tender documents
10 documents required · 10 mandatory
₹1,605
Yes
₹18,168
Yes
17 Mar 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Side protection work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1404558.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.93 MB
BOQ_1404558.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid