Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹14.8 L+₹10,771.25 (0.73%)Accepted-AOC | L2 | Accepted-AOC 2nd Lowest | |
| 3 | L3₹16.5 L+₹1.8 L (12.0%)Rejected-Finance | L3 | Rejected-Finance Third Lowest | |
| 4 | L4₹18.1 L+₹3.4 L (23.2%)Rejected-Finance | L4 | Rejected-Finance Forth Lowest | |
| 5 | L5₹19.9 L+₹5.2 L (35.2%)Rejected-Finance MURIYANKARA HOUSE PINARMUNDA PERINGALA POST ERNAKULAM DISTRICT KERALA 683565 | ERNAKULAM DISTRICT | KERALA | 683565 | L5 | Rejected-Finance Fifth Lowest |
Tender Value
₹24.7 L
EMD Value
₹61,800
Closing Date
27 Jun 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, Minor Irrigation Division, 4th Floor, Civil Station, Kakkanad, Ernakulam Pin682030.
SDRF - Cleaning of thodu
2020_Irrig_366791_1
EE/MIDVN/EKM/08/ET/2020-21/S Tender
Open Tender
Civil Works - Others
Item Rate
60 days
Paravoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,304
Yes
online
₹61,800
Yes
17 Aug 2020
23 Jun 2020
29 Jun 2020
23 Jun 2020
27 Jun 2020
23 Jun 2020
60 days
Amount
Scheme 1 - form ch. 0m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 2- from ch.210 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 3 - from ch.420m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 4 - from ch.630m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 5- from ch.840m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 6 - from ch.1050m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 7- from ch.1260m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 8 - from ch.1470 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 9 - from ch.1680 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 10- from 1890 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 11- from 2100m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 12 - from ch.2310 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 13- from 2520 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 14 - from ch.2730 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 15 from ch.2940m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 16 - from ch.3150 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 17 - from ch.3360m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 18- from ch.3575 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 19 - from ch.3790 m
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
THOMAS RAJU K J
K S Bigili
E V POLLY
M.P Salim Pwd Contractor
Bidder Name
E V POLLY
M.P Salim Pwd Contractor
K S Bigili
THOMAS RAJU K J
CIJU JOHN
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_518447.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .