Loading…
Loading…
Tender Value
₹9.2 L
EMD Value
₹12,000
Closing Date
27 Aug 2026, 4:00 pmClosed
AGM(Projects and Planning) UC
AGM(Projects and Planning) FACT-UC,Udyogamandal, Kochi, Kerala
Maintenance works in connection with change of quarters and roof repair works in FACT Udyogamandal Township- Southern area of FACT Welcome Gate- Area -II.
2026_FACT_921344_1
3009/2026-2027/E33991
Limited
Civil Works
Percentage
180 days
Udyogamandal
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹12,000
Yes
10 Aug 2026
10 Aug 2026
28 Aug 2026
10 Aug 2026
27 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance works in connection with change of quarters and roof repair works in FACT Udyogamandal Township- Southern area of FACT Welcome Gate- Area -II. | |||||
| 1.01 | Dismantling and removing Mangalore tiles laid over roofs including ridges, hips, valley sheets, wind tiles and boardering etc. but excluding roof timber item and stacking serviceable materials as directed in Township office and disposing the unserviceable materials within a lead of 150M from the place of origin as directed. | - | M2 | 37.99 | - |
| 1.02 | Demolishing and removing old cement plaster and disposal of the debris at places pointed out in Township within a lead of 150M as directed. | - | M2 | 37.99 | - |
| 1.03 | Dismantling Mangalore pattern roofing tiles carefully and stacking the same as directed at the Civil Maintenance office yard. | - | NO | 3.04 | - |
| 1.04 | Dismantling and removing wrought and framed timbers of roof and conveying and stacking the dismantled materials in Township Office. | - | M3 | 2,245.7 | - |
| 1.05 | Labour for wood work wrought and put up with departmental scantlings. | - | M3 | 6,416.3 | - |
| 1.06 | Supplying and fixing hard country wood reepersin position for roofing work including cost of suitable wire nails etc. complete. | - | M3 | 77,596.75 | - |
| 1.07 | Plastering with cement mortar 1:4, 12mm thick, one coat floated hard and trowelled smooth at all levels. | - | M2 | 294.91 | - |
| 1.08 | Providing and fixing first class 340mm MP tiles on roof frame work. | - | M2 | 316.21 | - |
| 1.09 | Roofing with departmental M.P. tiles kept at various places in Township. | - | M2 | 60.83 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TERMSE33991.pdf
Tender Documents • 15.23 MB
BOQ_968217.xls
BOQ • 0.28 MB
COMPE33991.pdf
Additional Documents • 6.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].